Laserfiche WebLink
EV CHARGINGONLYEV CHARGINGONLYEV CHARGING <br />ONLY <br />NO <br />PARKING <br />NOPARKINGEV CHARGINGONLYPLAN VIEWCONDUIT ENTRYEV CHARGINGONLYTESLA SUPERCHARGER LODI, CA - 14700 THORNTON RD <br />CURRENT SUBMITTAL - PHASE 1: 16 SUPERCHARGERS <br />FUTURE SUBMITTAL - PHASE 2: 52 SUPERCHARGERS, 294.88 kW PV & TESLA BESS <br />APN: 055-320-610 TRT: 20294 <br />PROJECT TEAM <br />ELECTRICAL ENGINEER OF RECORD: <br />JARED MARCHAND <br />TESLA, INC. <br />3500 DEER CREEK RD, <br />PALO ALTO, CA 94304 <br />(508) 951-5489 <br />JMARCHAND@TESLA.COM <br />PROJECT DESIGNER: <br />VINEAL SINGH <br />TESLA, INC. <br />3500 DEER CREEK RD. <br />PALO ALTO, CA 94304 <br />(650) 681-6475 <br />VINEASINGH@TESLA.COM <br />APPLICABLE CODES <br />2022 CALIFORNIA BUILDING CODE <br />2022 CALIFORNIA ELECTRICAL CODE <br />2022 CALIFORNIA FIRE CODE <br />2022 CALIFORNIA ENERGY CODE <br />SHEET INDEX <br />DESIGN CRITERIA <br />SUPERCHARGER SYSTEM <br />SUMMARY <br />EQUIPMENT QTY <br />V3 SUPERCHARGER CABINETS 4 <br />PRE-ASSEMBLED <br />SUPERCHARGER UNIT 3.0 4 <br />V4 SUPERCHARGER POSTS 16 <br />UTILITY TRANSFORMER 1 <br />4000A SWITCHBOARD 1 <br />AC ALTERNATING CURRENT <br />ADA AMERICANS WITH DISABILITIES <br />ACT <br />BLDG BUILDING <br />CLR CLEAR <br />COMM COMMUNICATION <br />CONC CONCRETE <br />DC DIRECT CURRENT <br />DIA DIAMETER <br />DIST DISTANCE <br />(E)EXISTING <br />EA.EACH <br />EGC EQUIPMENT GROUNDING <br />CONDUCTOR <br />EMT ELECTRICAL METALLIC TUBING <br />EQ EQUAL <br />ERMS ENERGY REDUCTION <br />MAINTENANCE SETTINGS <br />ESS ENERGY STORAGE SYSTEM <br />EV ELECTRIC VEHICLE <br />GAB GRADED AGGREGATE BASE <br />GALV GALVANIZED <br />GEC GROUNDING ELECTRODE <br />CONDUCTOR <br />GFP GROUND FAULT PROTECTOR <br />GND GROUND <br />HVAC HEATING, VENTILATION, & AIR <br />CONDITIONING <br />I CURRENT <br />IMP CURRENT AT MAX POWER <br />INV INVERTER <br />ISC SHORT CIRCUIT CURRENT <br />KVA KILOVOLT AMPERE <br />KW KILOWATT <br />KWH KILOWATT-HOUR <br />LSIG LONG TIME, SHORT TIME, <br />INSTANTANEOUS GROUND <br />LV LOW-VOLTAGE <br />LVDC LOW VOLTAGE DIRECT <br />CURRENT <br />MAX MAXIMUM <br />MIN MINIMUM <br />MV MEDIUM-VOLTAGE <br />(N)NEW <br />NEC NATIONAL ELECTRIC CODE <br />NIC NOT IN CONTRACT <br />NRTL NATIONALLY-RECOGNIZED <br />TESTING LABORATORY <br />NTS NOT TO SCALE <br />OC ON CENTER <br />PCC POINT OF COMMON COUPLING <br />PL PROPERTY LINES <br />PLC POWER LINE COMMUNICATION <br />POE POWER OVER ETHERNET <br />PP POWERPACK <br />PSU PRE-ASSEMBLED <br />SUPERCHARGER UNIT <br />PV PHOTOVOLTAIC <br />PVC POLYVINYL CHLORIDE <br />RSD RAPID SHUTDOWN <br />SCCR SHORT CIRCUIT CURRENT <br />RATING <br />SCH SCHEDULE <br />SQ. IN.SQUARE INCHES <br />SS STAINLESS STEEL <br />SSBJ SUPPLY SIDE BONDING JUMPER <br />SSD SEE STRUCTURAL DRAWINGS <br />STC STANDARD TESTING <br />CONDITIONS <br />TSC TESLA SYSTEM CONTROLLER <br />TYP TYPICAL <br />UON UNLESS OTHERWISE NOTED <br />VIF VERIFY IN FIELD <br />W WATT <br />ABBREVIATIONS PROJECT SCOPE <br />INSTALLATION OF 16 SUPERCHARGERS <br />AND ASSOCIATED AC AND DC <br />EQUIPMENT. <br />INSTALLATION OF 4000A/480V <br />SWITCHBOARD WITH METER MAIN. <br />INSTALLATION OF CONCRETE <br />EQUIPMENT PADS AND WALKWAYS. <br />INSTALLATION OF NEW PARKING <br />STRIPING, SIGNAGE AND ADA ACCESS <br />FEATURES. <br />PAVING OF PARKING LOT <br />INSTALLATION OF ENERGY STORAGE <br />SYSTEM EQUIPMENT PAD & <br />ASSOCIATED CONDUIT. <br />FUTURE SUBMITTAL <br />INSTALLATION OF TESLA BATTERY <br />ENERGY STORAGE EQUIPMENT. <br />(FUTURE, UNDER SEPARATE PERMIT). <br />INSTALLATION OF 294.88 kW-DC-STC, <br />CANOPY-MOUNTED PV ARRAY. <br />INSTALLATION OF 4000A/480V <br />SWITCHBOARD WITH METER MAIN. <br />SITE LAYOUT AERIAL MAP <br />REFERENCED DOCUMENTS <br />PRE-ASSEMBLED SUPERCAHRGER UNIT <br />SUPERCHARGER INSTALLATION MANUAL <br />SUPERCHARGER POST INSTALLATION <br />MANUAL <br />TOPOGRAPHIC SURVEY <br />UTILITY DESIGN <br />MEGAPACK INSTALLATION MANUAL <br />PV INVERTER INSTALL MANUAL <br />PV MODULE INSTALL MANUAL <br />STRUCTURAL ENGINEER OF RECORD: <br />YOO JIN KIM <br />TESLA, INC. <br />129 GERBERA STREET, <br />DANVILLE, CA 94506 <br />M:(949)285-6177 <br />YOKIM@TESLA.COM <br />(UNDER SEPARATE PERMIT) <br />BATTERY ENERGY STORAGE <br />SYSTEM (BESS) FUTURE <br />(PHASE 2) <br />SYSTEM TOTALS <br />NOMINAL POWER 571.2 kW <br />PEAK APPARENT <br />POWER 650 kVA <br />ENERGY RATING 2,284.8 kWh <br />BATTERY (LITHIUM) <br />MEGAPACK TYPE MEGAPACK 2 <br />PART #1748844-00-A <br />QTY 1 <br />DISCHARGE 4 HR <br />SYSTEM SUMMARY <br />CIVIL ENGINEER OF RECORD: <br />MICHAEL P. HENDERSON <br />TESLA, INC. <br />45500 FREMONT BOULEVARD, <br />FREMONT, CA 94538 <br />M:(678) 687-1976 <br />MIHENDERSON@TESLA.COM <br />ARCHITECT OF RECORD: <br />CHRIS MARESCA <br />TESLA, INC. <br />2204 ALBATROSS ST. <br />SAN DIEGO, CA 92101 <br />P:(619) 764-8142 <br />CMARESCA@TESLA.COM <br />1.WIND DESIGN <br />-DESIGN WIND SPEED = 93 MPH <br />(ULTIMATE) <br />-RISK CATEGORY = II <br />-WIND EXPOSURE = C <br />2.SEISMIC DESIGN <br />-SEISMIC IMPORTANCE FACTOR = 1.0 <br />-SITE CLASS = D <br />-Ss = 0.719 / S1 = 0.285 <br />-Sds = 0.587 / Sd1 = 0.386 <br />-SEISMIC DESIGN CATEGORY = D <br />3.GROUND SNOW LOAD = 0 PSF <br />CURRENT SUBMITTAL <br />FUTURE PHOTOVOLTAIC (PV) SYSTEM <br />SUMMARY <br />SYSTEM TOTALS <br />DC RATING 294.88 kW-DC-STC <br />AC RATING 260 kW <br />MODULE <br />TYPE <br />HANWHA QCELLS <br />Q.PEAK DUO <br />XL-G10.3/BFG485 <br />STC RATING 485 W-STC <br />QUANTITY 608 <br />INVERTER 1 <br />TYPE <br />CHINT POWER <br />SYSTEMS # <br />SCA60KTL-DO-US-480 <br />OUTPUT RATING 60.00 kW <br />QUANTITY 1 <br />INVERTER 2 <br />TYPE <br />CHINT POWER <br />SYSTEMS # <br />SCA50KTL-DO-US-480 <br />OUTPUT RATING 50.00 kW <br />QUANTITY 4 <br />PV MODULE RACKING <br />TYPE PARKING CANOPY <br />TILT 5° <br />AZIMUTH 140° <br />1"12"0 <br />PROPRIETARY AND CONFIDENTIAL <br />ABCDEFGH <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />DATENO.REVISIONORIGINAL SIZE 24"X36" <br />SHEET SIZE ARCH "D" <br />3500 DEER CREEK RD. <br />PALO ALTO, CA 94304 <br />(650) 681-5000 <br />3/27/2024AARCH SITE PLAN COMMENTS10/18/2024BCIVIL AND BUILDING COMMENTSN <br />S <br />EW <br />AREA OF WORK <br />N <br />S <br />EW <br />C-101 GRADING PLAN <br />SHEET #SHEET TITLE <br />G-001 COVER PAGE <br />G-002 NOTES <br />E-101 ELECTRICAL SITE PLAN <br />E-102 CONDUIT PLAN <br />E-201.1 SINGLE LINE DIAGRAM <br />E-201.2 SINGLE LINE DIAGRAM <br />E-202 LOAD SCHEDULES <br />E-210 COMMS DIAGRAM <br />E-211 COMMS DIAGRAM <br />E-501 ELECTRICAL DETAILS <br />E-502 ELECTRICAL DETAILS <br />E-801 TITLE 24 <br />E-802 LABELS & PLACARDS <br />A-101 ARCHITECTURAL SITE PLAN <br />A-301 ACCESSIBLE PARKING PLAN <br />A-501 DETAILS <br />S-101 STRUCTURAL SITE PLAN <br />S-301 ENLARGED SITE PLAN <br />S-501 STRUCTURAL DETAILS <br />S-502 STRUCTURAL DETAILS <br />14700 THORNTON RDLODI, CA 95242, USCOVER PAGE <br />G-001 <br />REV: B IFP <br />MVANDERWALPLOT DATE: 10/25/2024 9:20 a. m. <br />JB-9528024TESLA SUPERCHARGER_LODI, CAPHASE 1: 16 SUPERCHARGERSB <br />B <br />CALGREEN CHECKLIST <br />CALGREEN CHECKLIST <br />CALGREEN CHECKLIST <br />CALGREEN CHECKLIST <br />G-003 <br />G-004 <br />G-005 <br />G-006 <br />B <br />B <br />B <br />SWPP PLAN <br />IMPROVEMENT PLAN <br />CIVIL DETAILS <br />C-201 <br />C-202 <br />C-501 <br />CIVIL DETAILSC-502 <br />B