Laserfiche WebLink
ELECTRICAL SITE PLAN <br />1/16" = 1'-0" <br />EQUIPMENT TAGS <br />SWITCHBOARDSB-# <br />SPR-#SUPERCHARGER CABINET <br />#X SUPERCHARGER POST <br />XR-#TRANSFORMER <br />(PROVIDED BY UTILITY <br />PER UTILITY DESIGN) <br />SUPERCHARGER <br />CABINET <br />FROM PAD EDGE 3' ON <br />ALL SIDES AND 8' FROM <br />FRONT (VERIFY WITH <br />UTILITY STANDARDS) <br />MINIMUM SERVICE <br />CLEARANCES <br />TRANSFORMER <br />FROM PAD EDGE 8' ON <br />DOOR SIDES AND 3' ON <br />NON-DOOR SIDES <br />(VERIFY WITH UTILITY <br />REQUIREMENTS) <br />RESILIENCY <br />SWITCHBOARD <br />4' <br />TESLA SYSTEM CONTROLLERTSC-X-# <br />MTR-# <br />UTILITY METER <br />(PROVIDED BY UTILITY <br />PER UTILITY DESIGN) <br />NOTES: <br />1.UTILITY EQUIPMENT/FOUNDATION <br />DIMENSIONS AND LOCATIONS PER <br />UTILITY. CONTRACTOR TO VERIFY <br />AGAINST EXECUTED UTILITY DESIGN. <br />2.UTILITY BOLLARDS PER UTILITY <br />REQUIREMENTS. CONTRACTOR TO <br />VERIFY AND COORDINATE WITH UTILITY <br />ON LOCATION, QUANTITY, AND SPECS. <br />3.CONTRACTOR TO REFER TO EXECUTED <br />UTILITY DESIGN FOR PRIMARY AND <br />POINT OF CONNECTION DETAILS. <br />0 1'32'16'8' <br />(N) UTILITY BOLLARD <br />5' <br />SITE LEGEND <br />(N) CONDUIT ROUTE, <br />SHOWN FOR <br />DIAGRAMMATIC PURPOSES <br />ONLY. <br />PRIMARY METER <br />EQUIPMENT <br />PSU-#PRE ASSEMBLED <br />SUPERCHARGER UNIT <br />8' <br />MEGAPACK <br />(FUTURE) PV CANOPY <br />FOUNDATION AND COLUMN <br />CENTRAL WIFI <br />BROADCAST UNITWIFI-# <br />1'-6" <br />1' <br />SERVICE SIDE <br />CHARGE HANDLE <br />5" <br />(N) REBOUNDING BOLLARD <br />SIGN <br />SUPERCHARGER POST <br />(N) ACCESS POINT, REF. <br />SINGLE LINE DIAGRAM <br />(N) MCCUE BOLLARD <br />(N) POLE-MOUNTED LIGHT <br />FIXTURE <br />(N) REMOVABLE BOLLARD <br />WV <br />WV EV CHARGINGONLYEV CHARGINGONLYEV CHARGING <br />ONLY <br />NO <br />PARKINGSTAR STDE BROGGI RDNOPARKINGEV CHARGINGONLYPLAN VIEWCONDUIT ENTRYEV CHARGINGONLY1A1B1C1D2A2B2C2D3A3B3C3D4A4B4C4D <br />(N) MCCUE BOLLARD, (TYP. 9), <br />PER STRUCTURAL <br />(N) 4'x4' CLEAR SPACE FOR FUTURE GROUNDING <br />TRANSFORMER WITH CONDUIT STUB UP <br />(N) PMI "PMI-1", PER <br />UTILITY DESIGN <br />(N) PG&E BUS DUCT, <br />PER UTILITY DESIGN <br />(E) CHAIN LINK FENCE <br />XR-1 <br />SB-1 <br />PSU-2 <br />SPR-2 <br />(E) PROPERTY LINE <br />(N) REBOUNDING <br />BOLLARD WITH ACCESSIBLE <br />EV PARKING SIGN <br />(N) DRIVEWAY ENTRANCE, <br />PER ARCHITECTURAL <br />10' <br />P.U.E <br />AP-1 <br />SPR-3 <br />PSU-4 <br />SPR-4 <br />PSU-1 <br />SPR-1 <br />(E) SIDEWALK <br />(N) UTILITY BOLLARDS, <br />(TYP. 4), PER UTILITY REQUIREMENTS, <br />REF. PG&E DOC. #051122 <br />(FUTURE) PV CANOPY <br />COLUMN, TYP. <br />(FUTURE) PV CANOPY <br />OUTLINE, TYP. <br />FUTURE BATTERY ENERGY STORAGE SYSTEM <br />·BESS, GROUNDING TRANSFORMER, AND LINE <br />REACTOR EQUIPMENT PAD & ASSOCIATED <br />CONDUIT PART OF THIS PERMIT, REF. <br />ELECTRICAL & STRUCTURAL <br />·2,284.8 KWH LITHIUM BATTERY ENERGY <br />STORAGE SYSTEM "MEGAPACK 2" <br />EQUIPMENT/WIRING INSTALLATION UNDER <br />SEPARATE PERMIT. <br />PSU'S TO BE INSTALLED <br />FLUSH WITH ASPHALT, TYP. <br />PSU-3 <br />SPR-17 <br />MTR-1 <br />(N) ASPHALT PAVING <br />TSC-SPR-1 <br />TSC-ESPV-2 <br />TSC-ESPV-1 <br />(N) CLEAR SPACE FOR FUTURE LINE <br />REACTOR WITH CONDUIT STUB UP <br />(FUTURE) PMI <br />"PMI-2", PER <br />UTILITY DESIGN <br />WIFI-# <br />(N) REMOVABLE BOLLARD, (TYP. 3), <br />PER STRUCTURAL <br />FUTURE EV CHARGE STALLS <br />AND PV CANOPY <br />FUTURE EV CHARGE STALLS <br />AND PV CANOPY <br />FUTURE CURB TO BE FLUSHED <br />WITH SURROUNDING GRADE <br />(N) GRAVEL <br />5' <br />(N) GRASSY FILTER STRIP, PER CIVIL <br />(FUTURE) INVERTER <br />"IN-1.1" <br />(FUTURE) LOAD <br />CENTER "LC-1" <br />(FUTURE) TRANSFORMER "XR-2" <br />(FUTURE) SWITCHBOARD "SB-2" <br />1"12"0 <br />PROPRIETARY AND CONFIDENTIAL <br />ABCDEFGH <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />DATENO.REVISIONORIGINAL SIZE 24"X36" <br />SHEET SIZE ARCH "D" <br />3500 DEER CREEK RD. <br />PALO ALTO, CA 94304 <br />(650) 681-5000 <br />3/27/2024AARCH SITE PLAN COMMENTS10/18/2024BCIVIL AND BUILDING COMMENTS14700 THORNTON RDLODI, CA 95242, USELECTRICAL <br />SITE PLAN <br />E-101 <br />REV: B IFP <br />MVANDERWALPLOT DATE: 10/25/2024 9:23 a. m. <br />JB-9528024TESLA SUPERCHARGER_LODI, CAPHASE 1: 16 SUPERCHARGERSN <br />S <br />EW <br />B <br />B <br />B <br />B <br />B <br />B