My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU3490-SU3495
PublicWorks
>
VAULT MAPS
>
Subdivision - SU
>
SU3200 - SU3624
>
SU3490-SU3495
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2025 12:56:36 PM
Creation date
4/10/2025 12:49:45 PM
Metadata
Fields
Template:
Subdivision - SU
Subdivision
Sunnyside Estates Waterline Interconnect Project
Additonal Filing Names
Sunnyside Estates Water Line 2000 Lodi Interconnection
Sheet #
6
Classification
Improvement Plans
Supplemental fields
Cross Ref
SU3490 - SU3495
Document Relationships
SU-3490
(Message)
Path:
\VAULT MAPS\Subdivision - SU (GIS FILES)\SU-3452-3683
SU-3491
(Message)
Path:
\VAULT MAPS\Subdivision - SU (GIS FILES)\SU-3452-3683
SU-3492
(Message)
Path:
\VAULT MAPS\Subdivision - SU (GIS FILES)\SU-3452-3683
SU-3493
(Message)
Path:
\VAULT MAPS\Subdivision - SU (GIS FILES)\SU-3452-3683
SU-3494
(Message)
Path:
\VAULT MAPS\Subdivision - SU (GIS FILES)\SU-3452-3683
SU-3495
(Message)
Path:
\VAULT MAPS\Subdivision - SU (GIS FILES)\SU-3452-3683
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
P14 e,,P` . <br />1� <br />19638 : <br />Exp, 9.30 b I <br />sr civV <br />ArF o� OAS-�Eo <br />9928KEY.DWG <br />[ INN YSIDJE JES TA TJES / 7/A TJER 1 4 IP TJz F <br />1T\1 TJE.. e Fi C OP\IP TJI F C T PR 0 JJE C T <br />CITY OF LODI, SAN 109Q1IN COUNTY, CALIFORNIA <br />JUNE, 2000 <br />Ex CACP� — <br />Ex fi'ACP Tehama Dr. <br />Cut & Cap SCALE: I1"=100' <br />Well Site "T to be abandoned under this contract <br />WELL SITE F ABANDONMENT <br />The Contractor shall: <br />1. Abandon well under permit from San Joaquin County Health Dept. <br />2. Remove all structures, equipment and foundation from the site <br />(asphalt concrete can remain) <br />3. Remove the pressure tank, seal openings and deliver, along with all <br />of the above ground valves, to San Joaquin Co. Maintenance Division <br />in Stockton- Contact Maintenance Division for delivery location site. <br />4. Remove electrical service. <br />5. Remove all exposed piping. Cap existing ACP discharge line. <br />6. Leave site in a neat and clean condition. <br />7. Abandonment shall not commence until the remainder of the work <br />has been accepted for maintenance by the San Joaquin County Dept. <br />of Public Works. <br />PREPARED IN THE OFFICE OF! <br />BA UMBA CH & PIAllA, INC. <br />GIVIt ENGINEERS <br />123 T ELM ET <br />Lo ALIFO IA 240 <br />DESIGNS U THE LIPE 9ION OF: p <br />. � IIC RCE I ���CJ <br />r <br />1 <br />-s <br />000DO12 OOODOII <br />County of San Joaquin <br />Work Area <br />G Basin <br />YETTLEMAN LN <br />City of Lodi <br />I�000D015 <br />Well Site "A' <br />Kristen Ct. <br />Sunnyside <br />a <br />Estates <br />A Tehama Dr. <br />Well Site "B" <br />A7 NO. <br />v� <br />HARNEY <br />CENTURY BLVD <br />City of Lodi <br />County of San Joaquin <br />LANE <br />AREA OF WORK <br />REVISIONS <br />DATE BY M <br />WN B.A.D. <br />0 <br />DEMN <br />T.P. <br />SCALE: C" 425t <br />C28054 <br />ExpiresL5 /* <br />HOR <br />As Noted <br />AS BUILT <br />JOB NUMBER 9928 <br />��GOVD <br />PS -, <br />No '}5i�e w°[k <br />�5 <br />neke rsan 0�ir+9�in peot►n9Tr@ <br />Pe atton <br />1001 ` <br />COUNTY OF SAN JOAQUIN <br />DEPARTMENT OF PUBLIC WORKS <br />APPROVED; <br />MANUEL LOPEZ, DIRECTOR 0 P LIC WORKS <br />�� °� ` CITY OF LODI <br />�LIFO"��� PUBLIC WORDS DEPARTMENT <br />GENERAL NOTES 4,�N <br />1. The project owner is SUNNYSIDE ESTATES MAINTENANCE DISTRICT. See Section 1 of <br />Specification for Inspection Responsibility. <br />2. WORK SHALL CONFORM to City of Lodi Public Improvement Design Standards, <br />Construction Specifications and Standard Plans unless specifically shown otherwise <br />on these plans. <br />3. STANDARD PLANS applicable to this project include: 402, 403, 405, 408, 409, 413, <br />415B, 501A and 505. <br />4. EXISTING UNDERGROUND UTILITIES shall be protected. Utility agencies shall <br />be notified and allowed to mark their utilities in the field at least 48 hours before <br />excavation. Completeness and accuracy of existing utility locations shown in these <br />plans are not guaranteed. Call "USA" (BOO) 227-2600. <br />5. EXCAVATION SAFETY REQUIREMENTS include submitting a CAL OSHA permit or letter <br />of notification to the City before commencing excavations over five feet deep. Refer to City <br />Construction Specification 6-19.04 "Excavation Safety' for additional requirements. <br />6. ALL TESTING for leakage or overdeflection shall be witnessed by a Primary Inspector. <br />7, The Contractor shall replace all damaged traffic striping, markings and legends per <br />State of Califronia Department of Transportation (Cal Trans) Standards. <br />B. The Contractor is responsible for compaction testing during trench backfill. The number <br />of tests will be as required by the inspecting agency. <br />9. The water pipe in Sunnyside Estates is asbestos cement pipe. All work on this pipe <br />shall be in accordance with applicable government regulations. <br />ADDITIONAL CONSTRUCTION NOTES <br />10. A PRE —CONSTRUCTION MEETING shall be scheduled by the County prior to construc— <br />tion. The Contractor's job superintendent and all major sub —contractors shall attend. <br />11. BEDDING for all pipe lines shall conform to City of Lodi Standard Plan 501, 501—A, <br />501—B and 501—C unless otherwise shown. <br />12. WATER used in any phase of construction, such as backfill compaction, dust control, <br />testing or other work herein required, shall be included in the unit price or lump <br />sum bid for the respective item of construction or items of work. <br />13. CONTRACTOR SHALL TAKE all necessary precautions to keep dust to a minimum. <br />Cost to be included in other items of work. See Section 10 of the Spoecification <br />for Inspection Responsibility. <br />14. bower Sacramento Road is not to be closed. No open trenches except at the time of <br />work. Use steel plates or backfill with A.C. cap. <br />15. Two—way traffic shall be maintained on Lower Sacramento Road at all times. Kirsten <br />Court may be restricted to one—way during construction. <br />DUST CONTROL REQUIREMENTS <br />See Section 10 of the Specification for inspection Responsibility. <br />CONSTRUCTION WATER <br />Construction water is not available from Sunnyside Estates Maintenance District. The <br />Contractor shall arrange for another source of water. The cost of construction water <br />shall be indicated in various other bid items. <br />Potable water is available from Sunnyside Estates for disinfection and testing only. <br />Chlorinated water may be disposed of by spreading on the upland area of the "T <br />Basin Site. <br />SITE INSPECTION <br />All bidders shall examine the construction site prior to bidding. <br />INDEMNITY _CLAUSE <br />The Contractor agrees that he shall assume sole and complete responsibility for job site <br />conditions during the course of construction of this project; that this requirement shall <br />apply continuously and not be limited to normal working hours; and that the Contractor <br />shall defend, indemnify and hold harmless the Owner and the project engineer from any <br />and all claims of litigation, damages and attorney's fees for personal or property damage of <br />whatever nature which are claimed to have occurred during the term of this project - <br />CONSTRUCTION STAKING LIABILITY WAIVER <br />These Improvement Plans have been prepared with the intent that the firm of Baumbach & Piazza, Inc. will <br />! + be performing the construction staking for the complete project. If, however, another engineering and/or <br />DATE: surveying firm should be employed to use these plans for the purpose of construction staking, notice is hereby <br />given that the firm of Baumbach & Piazza, Inc. will not assume any responsibility for errrors or omissions <br />RCE No. 28054 if any, which might occur and which could have been avoided, corrected or mitigated if Baumbach & Piazza, <br />EXP. BATE: 3/31/02 Inc. had performed the staking work, or if Baumbach & Piazza, Inc. had been contacted prior to staking <br />regarding any questions of ambiguity in the plans, interpretation of the plans, or engineering inconsistencies <br />contained in these plans. r� <br />PLAN SET ODUDU 10 <br />SUNNYSIDE ESTATES WATERLINE THRU 000DO 15 <br />PRINT DATE <br />KEY SHEET OOOD019/� <br />G-1183 <br />
The URL can be used to link to this page
Your browser does not support the video tag.