My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU3490-SU3495
PublicWorks
>
VAULT MAPS
>
Subdivision - SU
>
SU3200 - SU3624
>
SU3490-SU3495
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2025 12:56:36 PM
Creation date
4/10/2025 12:49:45 PM
Metadata
Fields
Template:
Subdivision - SU
Subdivision
Sunnyside Estates Waterline Interconnect Project
Additonal Filing Names
Sunnyside Estates Water Line 2000 Lodi Interconnection
Sheet #
6
Classification
Improvement Plans
Supplemental fields
Cross Ref
SU3490 - SU3495
Document Relationships
SU-3490
(Message)
Path:
\VAULT MAPS\Subdivision - SU (GIS FILES)\SU-3452-3683
SU-3491
(Message)
Path:
\VAULT MAPS\Subdivision - SU (GIS FILES)\SU-3452-3683
SU-3492
(Message)
Path:
\VAULT MAPS\Subdivision - SU (GIS FILES)\SU-3452-3683
SU-3493
(Message)
Path:
\VAULT MAPS\Subdivision - SU (GIS FILES)\SU-3452-3683
SU-3494
(Message)
Path:
\VAULT MAPS\Subdivision - SU (GIS FILES)\SU-3452-3683
SU-3495
(Message)
Path:
\VAULT MAPS\Subdivision - SU (GIS FILES)\SU-3452-3683
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8" R.P. Device Assembly -See Note 2 <br />1" Apco air relief �8" Water Valve <br />Fig. connection Pond <br />Ductile Iron Pip <br />G <br />U w <br />Test cocks 12" Min, 34" Max. . <br />See Note 6 <br />_ o <br />011m. N i I Ind <br />Thrust blocks per Std. Plan 405 <br />to customer, -a , , `7-� from City <br />Test cock <br />pipe, cover, side w <br />ABOVE GROUND INSTALLATION <br />NM: (N.T.S.) <br />1. It is the customers responsibilty to have the assembly tested annually ❑ ��pS <br />by a State certified backflow prevention tester and report the results -x—x —x—x —x — x x- �❑ <br />to the Public Works Department. Fence Line <br />2. FEBCO 825 or approved equal. Submit literature prior to ordering. PLAN ` <br />3. Valve handles may be chained &padlocked for security. t Finish Grade <br />4. This plan for domestic service only, Design for fire service applications to (N.T.S.) 1�:.:-,.° ; _ <br />have approval of Public Works Director and Fire Marshall.. <br />5. Provide drainage (with air gap) for pressure relief discharge. <br />6. Locate assembly immediately down stream of service box. 6"-6"x4'-6"x6" Concrete Slab <br />7. Wrap the backflow device with insulation to the satisfaction of the owner. CHLORINATOR —EAST VIEW <br />REDUCED PRESSURE BACKPLOW DEVICE ASSEMBLY <br />See City of Lodi Std. Plan 413 (No Scale) <br />(No Scale) <br />'- <br />I <br />1 <br />99 Bend <br />!i <br />�• f I ! <br />-I 1 <br />Plugeed Tee <br />Minimum Thrust Block Bearing Areas <br />In Square Feet <br />Pipe Size! 90' 45' 22 1/2 <br />6„ 3 2 2 2 <br />8" 4 3 2 3 <br />10" 6 4 3 4 <br />12" 8 5 3 6 <br />14" 12 7 4 8 1 <br />7 T <br />ga=apq °--,, b --� ;�g <br />8**'--See Detail, above <br />r fF <br />/\. J <br />YY <br />•G <br />all through Bldg. Floor <br />Chlorinator Line <br />= Model ECS-F "Bevco' Fiberglass shelter <br />Containing: <br />1. "Sensus" Model 11071) Accumulator (wall mounted) for chlorine pump control. <br />2. Wallace & Tierne Premia 75 chemical metering pump, Model MEM2, complete <br />._._-_....................._-........-_.._.._.._._.........__...._..._._.._._.._._.._._._..._.._._._.._._._..�...�..-.�..--..--.�..�-- -. �...-. ._ —r ...._..._.-..--^___----^-_.............-....._.........._..--_-..._-..._..__.._._._.._._.._._.._._......----------------_.__-_-_-_..Y_.._..._W_.._.__.___.._._.._._�----r.,- <br />34 <br />32 <br />34 <br />32 <br />30 \ _ _ - -._- \�__. _- - �m''rr>s--err-,rr _ _- _ - _T__.� _ ___ �- _ 30 <br />26 <br />INSTA U. 7P ...r <br />""'G'f3TiTVif6'1CT'f" �`f'TITiTli1A`TTf" <br />INSTALL 69 LF 8"W S=0.00 <br />CL. 150, EXCEPT UNDER SD <br />20 <br />24 <br />22 22 <br />___4__ ---_— _- -- -- _— ___ \T__ _—_________— _ <br />min. Control Conduit with suction and discharge tubing, foot valve assembly and degassing head. <br />3. Model 0741 Corporation Stop and Nozzle assembly. <br />= 6'x6' concrete vault with "Sensus" 4. 55 gallon chemical tank for liquid chlorite, with cover. 20 <br />8" Compact Fireline Service Assembly, 5. Shelving and misc. electrical wiring, as necessary. <br />Both meters are to have "Touch Read G-HEATER AND FAN. <br />Pads" in lid. Readings are to be in MECHANICAL EQUIPMENT SCHEMATIC <br />cubic feet. <br />(No Scale) <br />Tee <br />45' or 222' .. <br />Horizontal Bend <br />No thrusting on cross except when <br />e ds are plugg �d. <br />7 i <br />Cross <br />1 <br />Vertical Bend <br />— Fitting <br />Tapped <br />.Cap <br />i- <br />��I"�"i,l <br />Blow off <br />4 Reinforcing Bar <br />Notes: <br />1- Concrete shall be 2000 PSI minimum at 28 days. <br />2. Thrust blocks shall be placed against undisturbed earth. <br />3. All fittings shall be supported in concrete. <br />Thrust Bloch Requirements <br />City of Lodi Std. Plan 405 <br />PROfE <br />4 <br />* 4 <br />3 � <br />IFOR� A <br />9D <br />99281URS.DWG <br />NO. <br />REVISIONS <br />Overhead Service <br />M <br />�-------� 100 Meter Main <br />I <br />Ground I Main 140A 2P <br />♦ 1 2 CKT Panel 120/240 <br />20A I 20A 1P <br />I I <br />to pump to lighting I <br />L — — — — — — — — — — — J <br />ELECTRICAL SCHEMATIC <br />Conduit & conductor sizes per applicable codes. <br />FEBCO Model 825 Reduced Pressure <br />Backflow Prevention Device. <br />mm <br />Finish Concrete <br />—23/4 » Galy. <br />-- Iran Pipe y <br />Source Line - 1 <br />DOMESTIC WATER DETAIL <br />(No Scale) <br />DATE BY DRAWN B.A.D. DESIGN T.P. <br />HOR 1 = 20' <br />VERT <br />1 <br />AS BUILT <br />JOB NUMBER 9928 <br />�e <br />Y4 " Hose Bibb � <br />b <br />% <br />Galv. Coupling <br />Concrete Slab <br />�4 G.1-P- <br />& Elbow -I <br />.�4 ' P.V.C. <br />from service <br />HOSE BIB DETAIL <br />(No Scale) <br />32-00 <br />LOWER SACRAMENTO ROAD <br />(SEE SHEET 000DO15) <br />j 29- 47 <br />S ;�a <br />—zO... ........ ....... <br />20 <br />31 00 <br />VPNT-P1\T PniTPT <br />30-00 <br />� o.as.s a 11 z <br />i <br />2O ' 1=20' <br />l •` W F <br />1 � <br />I `�1 � x <br />,O � INSTALL &MAINTAIN CITY OF LODI <br />x CENTER FULL JOINT OF °" oa B.O. PER STD PLAN 409, UNTIL ACCEPTED <br />\ CL 200 WATER AT SD XING + + <br />0 o <br />L—— - - <br />g1_ lelp "-----------------� —A-�`— —=`--w-A-�= <br />'- x2" G.I — — Next Valve <br />ON <br />t 31+87 KRISTEN COURT= - - 31 no 3 Lots East <br />t 31+87 LOWER SACRAMENTO ROADS a - -- - - - -- - - D <br />NOTE: ALL VALVES ARE 10" UNLESS NOTED OTHERWISE. <br />REC0FkD.[)F(A\N1NG <br />Corrections BY �--'_— <br />No Changes By.� <br />Date l his Dra�Niract4 <br />._..: � cR �er;~fy <br />IP4�'°' <br />Any Person usinca to pecting Tl Veit <br />Ali information BY <br />A'C� PREPARED IN THE OFFICE OF: <br />BA UMBA CIS & PIAllA. INC. <br />),� <br />CIVIL ENGINEERS <br />323 WEST ELM STREET <br />LODI, CALIFORNIA 95240 <br />�'�DESIGNED UNDER THE SUPERVISION OF: <br />RCE <br />LIVID FLANG`,� f1. u-� - <br />31+65 6'x6' METER BOX THRUST BLOCIt 4"x8" REDUCER <br />10" x8" x 10" Th " - " I 8" TEE 3- 8" WATER VALVES " <br />8 WATER VALVE I � �-z.. <br />W/BLIND FLANGE - - - - - - Tv <br />- - <br />31+07 INSTALL FH ASSEMBLY r - - - - - - — - - - - = 4"x8" REDUCER l -_ <br />PER STD PLAN 401 - <br />SPOOL' SPOOL <br />5' L �Q ' <br />�o _ <br />I Cry U >, f \ <br />CA <br />`� III III <br />INSTALL DOUBLE 3 FOOT* MAN GATEr1 <br />WITH METAL FRAME & DROP PIN, TO <br />MATCH FENCE. PROVIDE 1 FT. SQUARE � <br />(METAL FRAME) OPENING IN EACH GATE - e� F s <br />FOR CHAIN. CHAIN SHALL BE LARGE ENOUGH 3 HARTLEY LN. <br />FOR CITY & COUNTY TO DOUBLE PADLOCK C4 o q G; I <br />GATE. INSTALL BACTERIOLOGICAL SAMPLING � The existing water lines in Sunnyside Estates are asbestos cement pipe. <br />TAP PER S.J. CO. STD PLANS DRAINAGE R All work on asbestos cement pipe shall conform to all State and Federal <br />W-fia, 6b, & 6c. FOND . regulations. The disposal of asbestos cement pipe shall be in a Class 2 <br />landfill in accordance with State and Federal regulations. <br />*ADJUST FOR METER BOX WIDTH r The Contractor may remove full joints of pipe or use other methods of <br />construction to minimize construction hazards. Alternate methods of <br />construction as subject to the approval of the Engineer. <br />COUNTY OF SAN 3LdCJOAQUIN SUNNYSIDE ESTATES WATERLINE THRU 000DO i5 <br />DEPARTMENT OF PUBLIC WORKS <br />APPROVED; CITY OF LODI SUBDIVISION IMPROVEMENTS PRINT DATE <br />DATE: COURT <br />rrnT � <br />9trF0g�ti4 PUBLIC WORKS DEPARTMENT KRISTEN CO V ELT DRAWING <br />NO. 28054 - � � �n <br />MANUEL LOPEZ, DIRECTOR OF PUBLIC WORKS EXP, DATE: 3/31/02 {LOCATION} L <br />015,*/ <br />G-1183 <br />
The URL can be used to link to this page
Your browser does not support the video tag.