My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C590 - C620
PublicWorks
>
VAULT MAPS
>
Large Plans - LP
>
Drawer C
>
C500 thru
>
C590 - C620
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2025 11:50:10 AM
Creation date
4/16/2025 10:18:16 AM
Metadata
Fields
Template:
Large Plans - LP
Project
Project Plans for Cardinal Avenue Improvements
Limits
Main Street to Weber Avenue
Year
2005
Project Engineer
Jerry Violett
Roads Worked
Cardinal Ave.
Red Lines
Yes
Supplemental fields
Classification
Record Drawings
Cross Ref
C590 - C620
Type
Improvements
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BASE BID + ADDITIVE BID ALTERNATE "A" <br />ON 133HS I 2i3M"O <br />DUST CONTROL <br />(NON WORKING HOURS) <br />Location Quantity <br />Cardinal Avenue <br />Sta. 0+24 to Sta. 38+50 50 Each <br />Total 50 Each <br />RESET FRAMES AND GRATES <br />(18" STORM DRAIN INLET) <br />Location Quantity <br />Cardinal Avenue <br />Sta. 0+24 to Sta. 38+50 30 Each <br />(30 Locations) <br />Total 30 Each <br />RESET FRAMES AND COVERS <br />(MAINTENANCE HOLE) <br />Location Quantity <br />Cardinal Avenue <br />Sta. 0+24 to Sta. 38+50 27 Each <br />(27 Locations) Total 27 Each <br />RESET FRAMES AND COVERS <br />(LAMPHOLE) <br />Location Quantity <br />Cardinal Avenue <br />Sta. 0+24 to Sta. 38+50 8 Each <br />(8 Locations) <br />Total 8 Each <br />RESET SURVEY MONUMENTS <br />Location Quantity <br />Cardinal Avenue <br />Sto. 0+24 to Sta. 38+50 3 Each <br />(3 Locations) <br />Total 3 Each <br />RESET FRAMES AND COVERS <br />(SURVEY MONUMENTS) <br />Location Quantity <br />Cardinal Avenue <br />Sto. 0+24 to Sta. 38+50 2 Each <br />(2 Locations) <br />Total 2 Each <br />RELOCATE MAIL BOXES <br />Location Quantity <br />Cardinal Avenue <br />Sta. 0+24 to Sto. 38+50 53 Each <br />(45 Locations) <br />Total 53 Each <br />RELOCATE ROADSIDE SIGNS <br />Location Quantity <br />Cardinal Avenue <br />Sta. 0+24 to Sta. 38+50 32 Each <br />Total 32 Each <br />RECORD DRAWHN <br />Corrections By <br />No Changes 8y <br />Date 2-5—o 7 e <br />Any Person Using This Drawing Should Vey <br />All information By inspectinq The Site ()f Wore <br />RELOCATE FIRE HYDRANTS <br />Location Quantity <br />Cardinal Avenue <br />Sto. 0+24 to Sto. 38+50 3 Each <br />(3 Locations) <br />Total 3 Each <br />ROADWAY EXCAVATION <br />Location <br />Quantity <br />Cardinal Avenue <br />Sta. 0+24 to <br />Sta. <br />31 +73 <br />9,943 <br />C.Y. <br />Sta. 31 +73 to <br />Sta. <br />36+88 <br />2,493 <br />C.Y. <br />Sta. 36+88 to <br />Sta. <br />38+50 <br />276 <br />C.Y. <br />Ardelle Avenue <br />Sta. 9+00 to <br />Sta. <br />11 +25 <br />352 <br />C.Y. <br />Marsh Street <br />j Sta. 9+00 to <br />Sta. <br />11 +50 <br />319 <br />C.Y. <br />Hobart Avenue <br />Sta. 8+75 to <br />Sta. <br />11 +25 <br />287 <br />C.Y. <br />Washington Street <br />Sta. 9+00 to <br />Sta. <br />11 +00 <br />498 <br />C.Y. <br />Miller Avenue <br />Sto. 8+75 to <br />Sta. <br />9+80 <br />237 <br />C.Y. <br />Dana Avenue <br />Sta. 8+50 to <br />Sta. <br />11 +25 <br />356 <br />C.Y. <br />Total 14,761 C.Y. <br />SHOULDER <br />BACKING <br />Location <br />Quantity <br />Cardinal Avenue <br />Sta. 36+88 to <br />Sta. <br />38+50 <br />34 <br />Tons <br />Ardelle Avenue <br />Sta. 9+00 to <br />Sta. <br />11 +25 <br />18 <br />Tons <br />Marsh Street <br />Sta. 9+00 to <br />Sta. <br />9+85 <br />19 <br />Tons <br />Hobart Avenue <br />Sta. 8+75 to <br />Sta. <br />11 +25 <br />22 <br />Tons <br />Washington Street <br />Sta. 9+00 to <br />Sta. <br />11 +00 <br />8 <br />Tons <br />Miller Avenue <br />Sta. 8+75 to <br />Sta. <br />9+75 <br />12 <br />Tons <br />Dana Avenue <br />Sta. 8+50 to <br />Sta. <br />11 +25 <br />22 <br />Tons <br />Total 135 Tons <br />DRIVEWAYS <br />(TYPE D) <br />Location <br />Quantity <br />Cardinal Avenue <br />Sta. 0+24 to Sto. 38+50 <br />613 S.Y. <br />(52 Locations) <br />Miller Avenue <br />Sto. 8+76 (Rt.) <br />11 S.Y. <br />Dana Avenue <br />Sta. 8+50 to Sta. 1 1 +25 <br />81 S.Y. <br />(3 Locations) <br />Total 705 S.Y. <br />DRIVEWAYS <br />(TYPE E) <br />Location <br />Quantity <br />Marsh <br />Street <br />Sta. <br />1 1 +41 <br />(Lt.) <br />21 S.Y. <br />Miller <br />Avenue <br />Sta. <br />8+76 <br />(Lt.) <br />17 S.Y. <br />Dana <br />Avenue <br />Sta. <br />8+94 <br />(Rt.) <br />14 S.Y. <br />PROJECT ENGINEER DATE CHECKED <br />�. 8105 <br />CAMM, e2i 8/01 wth <br />FILE NAME DRAWER SHEET NO. ACAD <br />' 1E:\Projects\2006\Cordina1 Avenue\Plans\Cardinal Summary.dwg <br />Total 52 S.Y. <br />DRIVEWAYS <br />(TYPE F) <br />Location <br />Quantity <br />Cardinal Avenue <br />Sta. 0+24 to Sta. 38+50 <br />79 S.Y. <br />(5 Locations) <br />Ardelle Avenue <br />Sta. 11 +06 (Lt.) <br />22 S.Y. <br />Marsh Street <br />Sta, 11 +40 (Lt.) <br />22 S.Y. <br />Hobart Avenue <br />Sta. 9+13 (Rt.) <br />11 S.Y. <br />Tota 1 134 S.Y. <br />CLASS <br />2 <br />AGGREGATE <br />BASE <br />Location <br />Quantity <br />Cardinal Avenue <br />Sta. 6+18 to <br />Sta. <br />36+88 (Lt.) <br />273 C.Y. <br />Sta. 0+24 to <br />Sta. <br />36+88 (Rt.) <br />318 C.Y. <br />Driveways (Type <br />F) <br />2 C.Y. <br />Total 593 C.Y. <br />ASPHALT <br />CONCRETE <br />BASE <br />Location <br />Quantity <br />Cardinal Avenue <br />Sta. 0+24 to Sta. <br />31 +73 <br />5,648 Tons <br />Sta. 31 +73 to Sta. <br />36+88 <br />1,204 Tons <br />Sta. 36+88 to Sto. <br />38+50 <br />145 Tons <br />Total 6,997 Tons <br />ASPHALT CONCRETE (TYPE A) <br />Location <br />Quantity <br />Cardinal Avenue Pavina <br />Sta. 0+24 to Sta. 31 +73 <br />3,389 <br />Tons <br />Sta. 31 +73 to Sta. 32+80 <br />847 <br />Tons <br />Driveways (Type D) <br />Sta. 0+24 to Sta. 38+50 <br />141 <br />Tons <br />Driveways Type E) <br />Sta. 0+24 to Sto. 38+50 <br />5 <br />Tons <br />Asphalt Concrete (Misc. Areas) <br />Cardinal Avenue: <br />Sto. 30+22 to Sta. 31 +05 (Rt.) <br />12 <br />Tons <br />Washington Street: <br />Sta. 10+ 13 to Sto. 11 +00 (Rt.) <br />36 <br />Tons <br />Misc. Drainage Area (20 Locations) <br />7 <br />Tons <br />Total <br />4,437 <br />Tons <br />PLACE ASPHALT CONCRETE <br />(MISCELLANEOUS <br />AREAS) <br />Location <br />Quantity <br />Cardinal Avenue: <br />Sta. 30+22 to Sta. 31 +05 (Rt.) <br />58 <br />S.Y. <br />Washington Street: <br />Sta. 10+13 to Sta. 11+00 (Rt.) <br />108 <br />S.Y. <br />Misc, Drainage Area <br />Sta. 0+24 to Sta. 36+88 <br />90 <br />S.Y. <br />(20 Locations) <br />Total 256 <br />S.Y. <br />PLACE 12" DIA. REINFORCED <br />CONCRETE PIPE (CLASS IV) <br />Location Quantity <br />Cardinal Avenue: <br />Sta. 0+24 to Sta. 36+88 1,277 L.F. <br />(40 Locations) <br />Total 1,277 L.F. <br />DATE APPROVAL RECOMMENDED DATE <br />COUNTY OF SAN JOAQUIN <br />s <br />REVISIONS DATE <br />PLACE 18" DIA. REINFORCED <br />CONCRETE PIPE (CLASS IV) <br />Location Quantity <br />Cardinal Avenue: <br />Sta. 0+24 to Sta. 36+88 493 L.F. <br />(3 Locations) <br />Total 493 L.F. <br />PLACE 24" DIA. REINFORCED <br />CONCRETE PIPE (CLASS IV) <br />Location Quantity <br />Cardinal Avenue <br />Sto. 0+24 to Sta. 36+88 211 L.F. <br />(4 Locations) <br />Total 211 L.F. <br />6" DIA. PLASTIC PIPE (PVC)** <br />Location Quantity <br />Cardinal Avenue <br />Sta. 31 + 17 to Sta. 32+26 (Lt.) 110 L.F. <br />Sta. 35+37 to Sta. 36+38 (Lt.) 101 L.F. <br />Total 211 L.F. <br />* *Approx. Locations listed above. Exact locations to be <br />determined by R.E. & Representatives of the City of Stockton. <br />PLACE STORM DRAIN <br />MAINTENANCE HOLE <br />Location Quantity <br />Cardinal Avenue <br />Sto. 0+24 to Sta. 36+88 4 Each <br />(4 Locations) <br />Total 4 Each <br />PLACE SANITARY SEWER <br />MAINTENANCE HOLE <br />Location Quantity <br />Cardinal Avenue <br />Sta. 0+24 to Sta. 36+88 2 Each <br />(2 Locations) <br />Total 2 Each <br />PLACE 18" STORM DRAIN INLET <br />(SDI) <br />Location Quantity <br />Cardinal Avenue <br />Sta. 0+24 to Sta. 36+88 20 Each <br />(20 Locations) <br />Total 20 Each <br />PLACE STORM DRAIN INLET <br />(TYPE I) <br />Location Quantity <br />Cardinal Avenue <br />Sta. 0+24 to Sta. 36+88 21 Each <br />(21 Locations) <br />Total 21 Each <br />PLACE LAMPHOLE <br />Location Quantity <br />Cardinal Avenue <br />Sta. 32+26 (Lt.) 1 Each <br />Sta. 35+37 (Lt.) 1 Each <br />Total 2 Each <br />* *Approx. Locations listed above. Exact locations to be <br />determined by R.E. & Representatives of the City of Stockton. <br />NO SCALE <br />PLACE FRAME AND COVER <br />(STORM DRAIN MAINTENANCE HOLE) <br />Location Quantity <br />Sta. 0+24 to Sta. 36+88 4 Each <br />(4 Locations) <br />Total 4 Each <br />PLACE FRAME AND COVER <br />(SANITARY SEWER MAINTENANCE HOLE) <br />Location Quantity <br />Sta. 0+24 to Sta. 36+88 2 Each <br />(2 Locations) <br />Total 2 Each <br />PLACE FRAME AND COVER ** <br />(LAMPHOLE) <br />Location Quantity <br />Cardinal Avenue <br />Sta. 32+26 (Lt,) 1 Each <br />Sta. 35+37 (Lt.) 1 Each <br />Total 2 Each <br />* *Approx, Locations listed above. Exact locations to be <br />determined by R.E. & Representatives of the City of Stockton. <br />PLACE FRAME AND COVER <br />(SURVEY MONUMENT) <br />Location Quantity <br />Cardinal Avenue <br />Sta. 31 +23 1 Each <br />Total 1 Each <br />PLACE STORM DRAIN I N LET FRAME <br />AND GRATE (TYPE 1) <br />Location Quantity <br />Cardinal Avenue <br />Sta. 0+24 to Sta. 36+88 21 Each <br />(21 Locations) <br />Total 21 Each <br />PAINT STRIPING (CENTER <br />LINE) <br />Location <br />Quantity <br />Cardinal Avenue <br />Sta. 0+24 to Sta. <br />31 +73 <br />2, 7Y; <br />L.F. <br />Sta. 31 +73 to Sta. <br />36+88 <br />393 <br />L.F. <br />Sta. 36+88 to Sta. <br />38+50 <br />162 <br />L.F. <br />Meadowood Drive <br />Sta. 9+51 to Sta. <br />9+69 <br />18 <br />L.F. <br />Ardelle Avenue <br />Sta. 9+00 to Sta. <br />11 +25 <br />170 <br />L.F. <br />Marsh Street <br />Sta. 9+00 to Sta. <br />1 1 +50 <br />195 <br />L.F. <br />Hobart Avenue <br />Sta. 8+75 to Sta. <br />11 +25 <br />193 <br />L.F. <br />Washington Street <br />Sta. 9+00 to Sta. <br />11 +00 <br />149 <br />L.F. <br />Miller Avenue <br />Sta. 8+50 to Sta. <br />9+78 <br />128 <br />L.F. <br />Dana Avenue <br />Sta. 8+50 to Sta. <br />11 +25 <br />223 <br />L.F. <br />Total 4,386 L.F. <br />PAINT STRIPING (EDGE LINE) <br />Location Quantity <br />Cardinal Avenue <br />Sta. 0+24 to Sta. 32+80 68 L.F. <br />Marsh Street <br />Sto. 9+00 to Sta. 11 +50 192 L.F. <br />SUMMARY OF QUANTITIES <br />Total 260 L.F. <br />THERMOPLASTIC PAVEMENT MARKING <br />Location Quantity <br />Cardinal Avenue <br />Sta. 0+24 to Sta. 31 +73 1 ,552 S.F. <br />(47 Locations) <br />Sta. 31 +73 to Sta. 36+88 145 S.F. <br />(7 Locations) <br />Total 1,697 S.F. <br />PAVEMENT MARKER <br />(RETRO REFLECTIVE YELLOW, <br />TYPE <br />D) <br />Location <br />Quantity <br />Cardinal Avenue <br />Sta. 0+24 to Sta. <br />31 +73 <br />250 <br />Each <br />Sta. 31 +73 to Sta. <br />36+88 <br />34 <br />Each <br />Sta. 36+88 to Sta. <br />38+50 <br />16 <br />Each <br />Meadowood Avenue <br />Sta. 9+51 to Sta. <br />9+69 <br />4 <br />Each <br />Ardelle Avenue <br />Sta. 9+00 to Sta. <br />11 +25 <br />20 <br />Each <br />Marsh Street <br />Sta. 9+00 to Sta. <br />11 +50 <br />20 <br />Each <br />Hobart Avenue <br />Sta. 8+75 to Sta. <br />11 +25 <br />22 <br />Each <br />Washington Street <br />Sta. 9+00 to Sta. <br />10+00 <br />16 <br />Each <br />Miller Avenue <br />Sta. 8+50 to Sto. <br />9+78 <br />12 <br />Each <br />Dana Avenue <br />Sta. 8+50 to Sta. <br />11 +25 <br />10 <br />Each <br />Total 422 Each <br />PAVEMENT MARKER <br />(RETROREFLECTIVE BLUE, TYPE D) <br />Location Quantity <br />Cardinal Avenue <br />Sta. 0+24 to Sta. 31 +73 6 Each <br />(6 Locations) <br />Sta. 31 +73 to Sta. 36+88 1 Each <br />(1 Locations) <br />Total 7 Each <br />PLACE MINOR CONCRETE CURB <br />Location Quantity <br />Cardinal Avenue: <br />Sta. 0+24 to Sto. 32+80 271 L.F. <br />(7 Locations) <br />Total 271 L.F. <br />PLACE MINOR CONCRETE <br />(SIDEWALK) <br />Location Quantity <br />Cardinal Avenue: <br />Sta. 6+18 to Sta. 36+88 (Lt.) 1,494 S.Y. <br />Sta. 0+24 to Sta. 36+88 (Rt.) 1,919 S.Y. <br />Total 3,413 S.Y. <br />PLACE MINOR CONCRETE <br />(CURB AND GUTTER) <br />Location Quantity <br />Cardinal Avenue: <br />Sta. 6+18 to Sta. 36+88 (Lt.) 2,892 L.F. <br />Sta. 0+24 to Sta. 36+88 (Rt.) 2,961 L.F. <br />Total 5,853 L.F. <br />CARDINAL AVENUE IMPROVEMENTS <br />(Main Street to Weber Avenue) <br />SHEET TOTAL <br />NO. SHEETS <br />30 31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.