Laserfiche WebLink
DUST CONTROL <br />(NON WORKING HOURS) <br />Location Quantity <br />Cardinal Avenue <br />Sta. 0+24 to Sta. 32+80 45 Each <br />Total 45 Each <br />RESET FRAMES AND GRATES <br />(18" STORM DRAIN INLET) <br />Location Quantity <br />Cardinal Avenue <br />Sta. 0+24 to Sta. 32+80 29 Each <br />(29 Locations) <br />Total 29 Each <br />RESET FRAMES AND COVERS <br />(MAINTENANCE HOLE) <br />Location Quantity <br />Cardinal Avenue <br />Sta. 0+24 to Sta. 32+80 25 Each <br />(25 Locations) Total 25 Each <br />RESET FRAMES AND COVERS I <br />(LAMPHOLE) <br />Location Quantity <br />Cardinal Avenue <br />Sta. 0+24 to Sta. 32+80 7 Each <br />(7 Locations) <br />Total 7 Each <br />RESET SURVEY MONUMENTS <br />Location Quantity <br />Cardinal Avenue <br />Sta. 0+24 to Sta. 32+80 3 Each <br />(3 Locations) <br />Total 3 Each <br />RESET FRAMES AND COVERS <br />(SURVEY MONUMENTS) <br />Location Quantity <br />Cardinal Avenue <br />Sta. 0+24 to Sta. 32+80 2 Each <br />(2 Locations) <br />Total 2 Each <br />RELOCATE MAIL BOXES <br />Location Quantity <br />Cardinal Avenue <br />Sta. 0+24 to Sta. 32+80 42 Each <br />(35 Locations) <br />Total 42 Each <br />RELOCATE ROADSIDE SIGNS <br />Location Quantity <br />Cardinal Avenue <br />Sta. 0+24 to Sta. 32+80 27 Each <br />Total 27 Each <br />RELOCATE FIRE HYDRANTS <br />Location Quantity <br />Cardinal Avenue <br />Sta. 0+24 to Sta. 32+80 2 Each <br />(2 Locations) <br />Total 2 Each <br />ROADWAY EXCAVATION <br />Location <br />Quantity <br />Cardinal Avenue <br />Sta. 0+24 to <br />Sta. <br />31 +73 <br />9,943 <br />C.Y. <br />Sta. 31 +73 to <br />Sta. <br />32+80 <br />155 <br />C.Y. <br />Ardelle Avenue <br />Sta. 9+00 to <br />Sto. <br />11 +25 <br />352 <br />C.Y. <br />Marsh Street <br />Sta. 9+00 to <br />Sta. <br />11 +50 <br />319 <br />C.Y. <br />Hobart Avenue <br />Sta. 8+75 to <br />Sto. <br />11 +25 <br />287 <br />C.Y. <br />Washington Street <br />Sta. 9+00 to <br />Sta. <br />11 +00 <br />498 <br />C.Y. <br />Total 11,554 C.Y. <br />SHOULDER <br />BACKING <br />Location <br />Quantity <br />Cardinal Avenue <br />Sta. 31 +73 to Sta. <br />32+80 <br />22 <br />Tons <br />Ardelle Avenue <br />Sta. 9+00 to Sta. <br />11 +25 <br />18 <br />Tons <br />Marsh Street <br />Sta. 9+00 to Sta. <br />9+85 <br />19 <br />Tons <br />Hobart Avenue <br />Sta. 8+75 to Sta. <br />1 1 +25 <br />22 <br />Tons <br />Washington Street <br />Sta. 9+00 to Sta. <br />1 1 +00 <br />8 <br />Tons <br />Total 89 Tons <br />DRIVEWAYS (TYPE D) <br />Location Quantity <br />Cardinal Avenue <br />Sta. 0+24 to Sta. 32+80 474 S.Y. <br />(43 Locations) <br />Total 474 S.Y. <br />DRIVEWAYS (TYPE E) <br />Location Quantity <br />7-Nis' <br />rsh Street <br />ta. 11 + 4 1 (Lt.) 21 S.Y. <br />Total 21 S.Y. <br />DRIVEWAYS <br />(TYPE F) <br />Location <br />Quantity <br />Cardinal Avenue <br />Sta. 0+24 to Sta. 32+80 <br />79 S.Y. <br />(5 Locations) <br />Ardelle Avenue <br />Sta. 11 +06 (Lt.) <br />22 S.Y. <br />Marsh Street <br />Sta. 1 1 +40 (Lt.) <br />22 S.Y. <br />Hobart Avenue <br />Sta. 9+ 13 (Rt.) <br />11 S.Y. <br />Total 134 S.Y. <br />CLASS 2 AGGREGATE BASE <br />Location Quantity <br />Cardinal Avenue <br />Sta. 6+18 to Sta. 31+73 (Lt.) 229 C.Y. <br />Sta. 0+24 to Sta. 31 +67 (Rt.) 271 C.Y. <br />Driveways (Type F) 2 C.Y. <br />PROJECT ENGINEER DATE CHECKED <br />8105 , <br />FILE NAME DRAWER SHEET N0, A AD <br />oc I 519 ;k E:\Projects\2006\Cardina1 Ave nue\Plans\Cardinal Summory.dwg <br />Total 502 C.Y. <br />ASPHALT CONCRETE BASE <br />Location Quantity <br />Cardinal Avenue <br />Sta. 0+24 to Sta. 31 +73 5,648 Tons <br />Sta. 31 +73 to Sta. 32+80 98 Tons <br />Total 5,746 Tons <br />ASPHALT CONCRETE <br />(TYPE A) <br />Location <br />Quantity <br />Cardinal Avenue Paving <br />Sta. 0+24 to Sto. 31 +73 <br />3,389 <br />Tons <br />Sta. 31 +73 to Sto. 32+80 <br />84 <br />Tons <br />Driveways (T p�, e D) <br />Sta. 0+24 to Sta. 32+80 <br />95 <br />Tons <br />Driveways (Tvp_ e E) <br />Sta. 0+24 to Sta. 32+80 <br />2 <br />Tons <br />Asphalt Concrete (Misc. Areas) <br />Cardinal Avenue: <br />Sta. 30+22 to Sta. 31 +05 (Rt.) <br />12 <br />Tons <br />Washington Street: <br />Sta. 10+ 13 to Sta. 11 +00 (Rt.) <br />36 <br />Tons <br />Drainage Area (14 Locations) <br />5 <br />Tons <br />Total 3,623 Tons <br />PLACE ASPHALT CONCRETE <br />(MISCELLANEOUS AREAS) <br />Location Quantity <br />Cardinal Avenue: <br />Sta. 30+22 to Sta. 31 +05 (Rt.) 58 S.Y. <br />Washington Street: <br />Sta. 10+13 to Sta. 11 +00 (Rt.) 108 S.Y. <br />Drainage Area <br />Sta. 0+24 to Sta. 31 +73 60 S.Y. <br />(14 Locations) <br />Total 226 S.Y. <br />PLACE 12" DIA. REINFORCED <br />CONCRETE PIPE (CLASS IV) <br />Location Quantity <br />Cardinal Avenue: <br />Sta. 0+24 to Sta. 31 +73 900 L.F. <br />(29 Locations) <br />Total 900 L.F. <br />PLACE 18" DIA. REINFORCED <br />CONCRETE PIPE (CLASS IV) <br />Location Quantity <br />Cardinal Avenue <br />Sta. 0+24 to Sta. 31 +73 8 L.F. <br />(1 Location) <br />Total 8 L.F. <br />PLACE 24" DIA. REINFORCED <br />CONCRETE PIPE (CLASS IV) <br />Location Quantity <br />Cardinal Avenue <br />Sta. 0+24 to Sta. 31 +73 211 L.F. <br />(4 Locations) <br />Total 211 L.F. <br />6" DIA. PLASTIC PIPE (PVC) <br />Location Quantity <br />Cardinal Avenue <br />Sta. 31 +17 to Sto. 32+26 (Lt.) 110 L.F. <br />Total 110 L.F. <br />* *Approx. Locations listed above. Exact locations to be <br />determined by R.E. & Representatives of the City of Stockton. <br />DATE APPROVAL RECOMMENDED DATE <br />11; l�ml�l.U',r, « COUNTY OF SAN JOAQUIN <br />REVISIONS DATE <br />PLACE STORM DRAIN <br />MAINTENANCE HOLE <br />Location Quantity <br />Cardinal Avenue <br />Sta. 0+24 to Sta. 31 +73 2 Each <br />(2 Locations) <br />Total 2 Each <br />PLACE SANITARY SEWER <br />MAINTENANCE HOLE <br />Location Quantity <br />Cardinal Avenue <br />Sta. 31 + 17 (Lt.) 1 Each <br />Total 1 Each <br />PLACE 18" STORM DRAIN INLET <br />(SDI) <br />Location Quantity <br />Cardinal Avenue <br />Sta. 0+24 to Sta. 31 +73 15 Each <br />(15 Locations) <br />Total 15 Each <br />PLACE STORM DRAIN INLET <br />(TYPE I) <br />Location Quantity <br />Cardinal Avenue <br />Sta. 0+24 to Sto. 31 +73 16 Each <br />(16 Locations) <br />Total 16 Each <br />PLACE LAMPHOLE <br />Location Quantity <br />Cardinal Avenue <br />Sta. 32+26 (Lt.) 1 Each <br />Total 1 Each <br />* *Approx. Locations listed above. Exact locations to be <br />determined by R.E. & Representatives of the City of Stockton. <br />PLACE FRAME AND COVER <br />(STORM DRAIN MAINTENANCE HOLE) <br />Location Quantity <br />Cardinal Avenue <br />Sta. 0+24 to Sta. 31 +73 2 Each <br />(2 Locations) <br />Total 2 Each <br />PLACE FRAME AND COVER <br />(SANITARY SEWER MAINTENANCE HOLE) <br />Location Quantity <br />Cardinal Avenue <br />Sta. 31 + 17 (Lt.) 1 Each <br />Total 1 Each <br />PLACE FRAME AND COVER <br />(LAMPHOLE) <br />Location Quantity <br />Cardinal Avenue <br />Sta. 32+26 (Lt.) 1 Each <br />Total 1 Each <br />* *Approx. Locations listed above. Exact locations to be <br />determined by R.E. & Representatives of the City of Stockton. <br />NO SCALE <br />PLACE FRAME AND COVER <br />(SURVEY MONUMENT) <br />Location Quantity <br />Cardinal Avenue <br />Sta. 31 +23 1 Each <br />Total 1 Each <br />PLACE STORM DRAIN I N LET FRAME <br />AND GRATE (TYPE 1) <br />Location Quantity <br />Cardinal Avenue <br />Sta. 0+24 to Sta. 31 +73 16 Each <br />(16 Locations) <br />Total 16 Each <br />PAINT STRIPING (CENTER <br />LINE) <br />Location <br />Quantity <br />Cardinal Avenue <br />Sta. 0+24 to Sta. <br />31 +73 <br />2, 755 <br />L.F. <br />Sta. 31 +73 to Sta. <br />32+80 <br />107 <br />L.F. <br />Meadowood Drive <br />Sta. 9+51 to Sta. <br />9+69 <br />18 <br />L.F. <br />Ardelle Avenue <br />Sta. 9+00 to Sta. <br />11 +25 <br />170 <br />L.F. <br />Marsh Street <br />Sta. 9+00 to Sta. <br />11 +50 <br />195 <br />L.F. <br />Hobart Avenue <br />Sta. 8+75 to Sta. <br />11 +25 <br />193 <br />L.F. <br />Washington Street <br />Sta. 9+00 to Sta. <br />11 +00 <br />149 <br />L.F. <br />Total 3,587 L.F. <br />PAINT STRIPING (EDGE LINE) <br />Location Quantity <br />Cardinal Avenue <br />Sta. 0+24 to Sta. 32+80 68 L.F. <br />Marsh Street <br />Sta. 9+00 to Sta. 11 +50 192 L.F. <br />Total 260 L.F. <br />THERMOPLASTIC PAVEMENT MARKING <br />Location Quantity <br />Cardinal Avenue <br />Sta. 0+24 to Sta. 31 +73 1 , 552 S.F. <br />(47 Locations) <br />Total 1, 5�2 S.F. <br />PAVEMENT MARKER <br />(RETROREFLECTIVE YELLOW, <br />TYPE <br />D) <br />Location <br />Quantity <br />Cardinal Avenue <br />Sta. 0+24 to Sta. <br />31 +73 <br />250 <br />Each <br />Sta. 31 +73 to Sta. <br />32+80 <br />12 <br />Each <br />Meadowood Avenue <br />Sta. 9+51 to Sta. <br />9+69 <br />4 <br />Each <br />Ardelle Avenue <br />Sta. 9+00 to Sta. <br />1 1 +25 <br />20 <br />Each <br />Marsh Street <br />Sta. 9+00 to Sta. <br />1 1 +50 <br />20 <br />Each <br />Hobart Avenue <br />Sta. 8+75 to Sta. <br />11 +25 <br />22 <br />Each <br />Washington Street <br />Sta. 9+00 to Sta. <br />10+00 <br />16 <br />Each <br />SUMMARY OF QUANTITIES <br />Total 344 Each <br />ON 133HS I 2J3MVWI <br />PAVEMENT MARKER <br />(RETROREFLECTIVE BLUE, TYPE D) <br />Location Quantity <br />Cardinal Avenue <br />Sta. 0+24 to Sta. 31 +73 6 Each <br />(6 Locations) <br />Total 6 Each <br />PLACE MINOR CONCRETE CURB <br />Location Quantity <br />Cardinal Avenue: <br />Sta. 0+24 to Sta. 32+80 271 L.F. <br />(7 Locations) <br />Total 271 L.F. <br />PLACE MINOR CONCRETE <br />(SIDEWALK) <br />Location Quantity <br />Cardinal Avenue: <br />Sta. 6+ 18 to Sta. 31 +73 (Lt.) 1,247 S.Y. <br />Sta. 0+24 to Sta. 31 +67 (Rt.) 1,670 S.Y. <br />Total 2,917 S.Y. <br />PLACE MINOR CONCRETE <br />(CURB AND GUTTER) <br />Location Quantity <br />Cardinal Avenue: <br />Sta. 6+18 to Sta. 31+73 (Lt.) 2,434 L.F. <br />Sta. 0+24 to Sta. 31 +67 (Rt.) 2,468 L.F. <br />Total 4,902 L.F. <br />RECORD DRAWING <br />Corrections By <br />No Changes By <br />Date �2.-s—o7— <br />Any Person Using This Drawing Should Verify <br />All information By inspecting The Site Of Work <br />CARDINAL AVENUE IMPROVEMENTS SNOT SHE ETS <br />(Main Street to Weber Avenue) 29 31 <br />