My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
M590 - M778
PublicWorks
>
VAULT MAPS
>
Large Plans - LP
>
Drawer M
>
M558 - M
>
M590 - M778
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2025 9:36:09 AM
Creation date
4/25/2025 9:47:25 AM
Metadata
Fields
Template:
Large Plans - LP
Project
McHenry Avenue Corridor Improvements
Limits
1487' South of River Road to 190' South of Jones Avenue
Year
2016
Project Engineer
R. Gibson
Roads Worked
McHenry Ave.
Red Lines
Yes
Federal #
STPL-5929(196), BRLS-5929(166), BRLS-5929(167), CML-5929(247)
Supplemental fields
Classification
As-Builts
Cross Ref
M558 - M778
Type
Corridor Improvements
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CCO 32 SHEET 3 OF 3 <br />CONDUCTOR SCHED <br />CABLE S <br />T <br />PHASE <br />TYPE <br />D <br />VEH-PED OA <br />3, 4, 8 <br />12CSC <br />5,6 <br />O <br />2, 5 <br />® <br />7,8 <br />ULE <br />NUMBER OF CONDUCTORS <br />RUN NUMBER <br />/Z <br />z/X <br />1,2 <br />O 1,6 <br />3CSC O 3,4 —� <br />TOTAL CABLES 12/3 CONDUCTORS <br />#10 FLASHING BEACON (120 V) <br />#8 LIGHTING (240 V) <br />#6 SERVICE <br />01 <br />V2 <br />03 <br />TYPE 04 <br />B 05 <br />DLC V6 <br />07 <br />08 <br />TOTAL <br />EVUC <br />CONDUIT SIZE <br />FILL <br />2 1 2 <br />2 <br />2 2 4 I 8 4 2 2 I 2 <br />2 2 2 2 2 2 <br />2 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />1 I 4 <br />I 4 <br />4 <br />I 4 I <br />4 <br />1 <br />4 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />I 1 <br />1 I <br />1 <br />1 <br />3 <br />1 <br />3 <br />3 <br />1 I 5 <br />5 I <br />5 <br />I 10 <br />19 <br />19 <br />9 <br />5 <br />5 <br />I 5 <br />1 I 1 I 1 <br />11 12 <br />I 2 <br />4 <br />4 <br />1 <br />1 <br />3" I 3" I 4" <br />I 4" 1 <br />4" <br />12-4" <br />2-4" <br />2-4" <br />4„ <br />4" <br />3" <br />9 10 13 <br />1 13 1 <br />17 <br />1 13 1 <br />24 <br />23 <br />19 <br />13 <br />13 <br />23 <br />SURVEY REVISION DESCRIPTION BY DATE SCALE PREPARED BY <br />DATUM: 1. MODIFY SIGNAL AND LIGHTING KC 10/15/19 <br />HORIZONTAL: NO SCALE DRAWN: KW <br />VERTICAL: K C <br />DESIGNED: <br />t 1 j I I I j DKY <br />INCHES CHECKED: <br />I 10 20 30 4'50 APPROVED: <br />FILE No. MILLIMETERS <br />POLE AND EOUIPN <br />STANDARD VEHICLE SIGNAL PEDESTRIAN <br />No. MOUNTING SIGNAL <br />TYPE SMA LMA MAST POLE MOUNTING <br />(FEET) (FEET) ARM <br />;NT SCHEDULE <br />PPB LED <br />LUMINAIRE REMARKS <br />ARROW (MAXIMUM <br />WATTS) <br />MAT IS R73-3(CA) AND G7-1(McHenry Ave)(CA). <br />�A 26-4-100 45 MAS SV-2—TAS'T.A UDd ON SIGNAL HEAD. <br />SEE NOTE [Tl:4]] <br />1-A _ _ 1 v <br />® I TV 2 T <br />MAT <br />C o 29-5-100 50 15 MAS SV-1-T 165 FISIR73-3(CA) AND G7-1(East River Rd)(CA). <br />MAS INSTALL EVUDa ON SIGNAL HEAD. <br />© 1-A TV-2-T <br />E� 26-4-100 40 15 MAT SV-1-T 165 [ISIR73-3(CA) AND G7-1(McHenry Ave)(CA). <br />MAS INSTALL EVUDb ON SIGNAL HEAD. <br />1-A TV-2-T SEE NOTE F9] <br />** G 29-5-100 45 15 MAT MAS SV-1-T 165 FlS]R73-3(CA) AND G7-1(East River Rd)(CA). <br />INSTALL EVUDc ON SIGNAL HEAD. <br />MAS <br />8 1-A TV-2-T SEE NOTE 9 <br />1 (D 15 12 165 <br />O 15 12 165 <br />* OTHER REQUIREMENTS ARE COVERED BY NOTES, LEGEND, SPECIAL PROVISIONS AND STANDARD SPECIFICATIONS. <br />FOR TYPE OF STANDARD, VEHICLE AND PEDESTRIAN SIGNAL MOUNTING, SEE STANDARD PLANS. <br />** USE SHORTER MAST —ARM AS INDICATED. <br />DATE <br />P 9. U .�. N <br />10 5 16 '� c0G <br />1 ® 5 /16 _ Vik y TRANSPORTATION CONSULTANTS, INC. <br />3250 RAMOS CIRCLE <br />10/5/16 SACRAMENTO, CA 95827 <br />(916) 366-8000 FAX: (916) 366-8008 • • <br />F"6' IR N <br />McHenry Ave Corridor Improvement Project <br />AS -BUILT <br />Resident Engineer - Mauricio Rivera, P.E. <br />Revisions By -- .9/28/2021 <br />SAN JOAQUIN COUNTY PUBLIC WORKS <br />TRANSPORTATION DIVISION <br />mcH[NRY AUK CORRIDOR I'M'PROVIMINTS <br />SIGNAL AND LIGHTING <br />DRAWING <br />E-2 <br />KIN Y. CHAN <br />c3 �` <br />No. 55391 OF <br />* Exp. 12/31 /16 ,♦ E-2 <br />Sf9l CIVIL Q SHEET <br />OF cA``F°`� 94 OF'176 <br />
The URL can be used to link to this page
Your browser does not support the video tag.