Laserfiche WebLink
GENERAL NOTES. <br />CCO 29 - SUPPLEMENT 1 SHEET 6 OF 6 <br />1. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE LATEST <br />CALTRANS STANDARD PLANS AND SPECIFICATIONS DATED 2010 AND ❑ ,� __ <br />SUBSEQUENT NEW AND REVISED STANDARD PLANS. <br />f, RC <br />2. THE CONTRACTOR 1S HEREBY NOTIFIED THAT PRIOR TO COMMENCING 00 Tom' �_ <br />CONSTRUCTION, HE IS RESPONSIBLE FOR CONTACTING ALL UTILITY AB - AB <br />COMPANIES FOR VERIFICATION AT THE CONSTRUCTION SITE OF THE <br />LOCATIONS OF ALL UNDERGROUND AND OVERHEAD FACILITIES WHERE '� \ =" RS RC <br />SUCH FACILITIES MAY CONFLICT WITH PLACEMENT OF IMPROVEMENTS-2 C, 2#10 <br />� 5 '� � j <br />SHOWN ON THIS PLAN. CALL "UNDERGROUND SERVICE ALERT" AT / 6' x 10'` <br />5 <br />800-227-2600 48 HOURS PRIOR TO ANY EXCAVATION. 0,6 <br />< z� CCO #29 - SUPPLEMENT 1 \ " <br />3. THE LOCATION OF ALL PULL BOXES, CONDUIT AND OTHER EQUIPMENT <br />SHOWN ON THIS PLAN ARE APPROXIMATE AND MAY BE CHANGED TOr <br />SUIT FIELD CONDITIONS AS DIRECTED BY THE ENGINEER. <�� o DH LOOPS IN THRU LANES RECUT TO MATCH RS �� <br />[� j f l 1 J <br />� /\ , SHIFTED LIMIT LINE. SEE SHEET E-1 FOR 11 <br />\, <br />4. THE CONTRACTOR SHALL CONTACT PG&E TO VERIFY OVERHEAD 13 -- 7 ?'C 1 DLC, 2#10 '�` LOOP LOCATIONS IN RIGHT TURN LANE. F51 <br />FACILITIES CLEARANCE REQUIREMENT PRIOR TO COMMENCING ANY r <br />CONSTRUCTION. <br />5. THE CONTRACTOR MUST MAINTAIN THE EXISTING FLASHING BEACON >, Q �, �i L2 <br />SYSTEM IN OPERATION DURING THE STAGE CONSTRUCTION. <� 9 `` , G7-1(MCHenry Ave)(CA) REMOVE EXISTING FLASHING BEACON SYSTEM <br />CONTRACTOR MUST SUBMIT TEMPORARY ELECTRICAL PLANS TO c� <br />COUNTY FOR APPROVAL PRIOR TO ANY STAGE CONSTRUCTION WORK. R/W \ ��� k SCALE: 1" = 50' <br />04 46* <br />00000� �� __ L H SEE LIGHTING CHANGES <br />PROJECT NOTES <br />04 �� ON SHEET E-1 S1. RAW 450' TO <br />�� LIMIT' LINE <br />1 FURNISH AND INSTALL MODEL 2070E CONTROLLER ASSEMBLY <br />2 7 '0 .-� 6 405' � TO <br />❑ \ r -. LIMITS LINE <br />WITH MODEL 332 CABINET AND BATTERY BACKUP SYSTEM AND R W 9 <br />Fq_1-LJ\ 5 <br />McCAIN 2033 SOFTWARE OS-9 REAL-TIME OPERATING SYSTEM. % 1 7 - EDi ,__ __��g -,,� 2 C, 5 DLC, Z#10 <br />THE CONTRACTOR MUST SUBMIT CERTIFICATES OF COMPLIANCE <br />FOR THE CABINET AND BATTERIES TO ENGINEER. FRONT DOOR 10 �8 R/W <br />EVUDd <br />SHALL FACE NORTH. � 6 <br />G7-1(East River Rd)(CA)--- 9 03 y �8 _ 6 2"C, 2 DLC, 2#10 <br />[2] 120/240 V, 10, 3-WIRE, TYPE III-AF SERVICE EQUIPMENT 06 1�1 03 05 ; ► 06 <br />ENCLOSURE WITH THE FOLLOWING CIRCUIT BREAKERS: R73-3(CA)' DH- <br />J 8 - 2"C, 2#10 <br />AMPERES VOLTS POLES NAMEPLATES METER PHOTOELECTRIC _ �6 6J4L 0 6J2L <br />CONTROL TYPE 1+00 43+00 ' _-� 44+00 45+0w <br />100 240 3 MAIN BREAKER YES/NO - I ! E\!LIDc 2' J��-� � � <br />R73-3 CA -- I ► E]6J4U[DH 6J2U <br />50 120 1 TRAFFIC SIGNAL YES - � 14' SEE LOOP CHANGES cP � <br />15 120 1(4) FLASHING BEACON YES - McHENRY AVENUE 5J9U 0 ON SHEET H G' I 119U <br />J��� o 5 <br />20 120 1 SPARE YES — <br />I 13' <br />s i �,2 <br />212U DH R73-3(CA) <br />8 214U L' <br />30 240 2 HIGHWAY LIGHTING NO V 8] 11 <br />, 12_ <br />- - I g 6 <br />EVUDa <br />15 120 1 LIGHTING CONTROL NO - 2"C, 2#10 <br />212E� 13 214E ✓� J F <br />20 120 1 SPARE NO - 9 a WL <br />01 <br />G7-1(East River Rd)(CA) <br />3 SPACE - - 9 9 r ,�� = • <br />4- FOUR 1 12 M2"C, 5 DLC, 2#10 �2 6@ <br />( ) OU POLE CB AEVUDb 2 C, 4 DLC 07A7 <br />2 C, 2 DLC, 2#10. R W R/W <br />F3] 3 C, MT. THE CONTRACTOR SHALL COORDINATE WITH PG&E FOR 405' 4T�_ / <br />SERVICE CONNECTION. 450' TO LIMIT LINE 11 ' 04 6 6(E) 1 <br />--- 6 <br />p <br />a LIMIT LINE A <br />2"C, 3#2 (SERVICE). ❑ 2 <br />5 COORDINATE WITH PG&E TO REMOVE LUMINAIRE AND OVERHEAD <br />DH <br />WIRES FROM EXISTING WOOD POLE. STEADY DEMAND SEQUENCE E 6 4 <br />�8 <br />06 6 \� 11 <br />F6] 3"C, 2#6 (CONTROLLER), 2#8 (LIGHTING), 8#10 (FB). �7 �` �- 4�� �� <br />04 � - � o V _ PG&E SERVICE POINT <br />G7-1(MCHenr Ave)(CA) 2"C, 1 DLC, 2#10 (120/240 V) (TO BE DETERMINED) <br />❑7 INSTALL TYPE 1 CONDUIT INSIDE THE BARRIER. �1 Y � <br />07 R73-3 CA LOAD: <br />® INSTALL PREFORMED INDUCTIVE DETECTOR LOOPS. 4�1 06 ( ) G -)3 1000 W TRAFFIC SIGNAL (METERED) <br />-4 <br />— <br />�p �134 165 W LED Lum (UNMETERED) <br />❑g INSTALL 1-A SIGNAL POLE ON BARRIER. SEE STRUCTURE PLAN �5 OR ` OR �4 q�g <br />r p <br />FOR FOUNDATION DETAIL. 02 LOOPS RECUT IN LEFT LANE \ a' -2 C, z �. <br />03 <br />Fol INSTALL TRAFFIC SIGNAL POLE ON BRIDGE STRUCTURE. SEE 05 A TO MATCH NEW LIMIT LINE. o �G 1 DLC,�. �, <br />7 2#10 <br />BRIDGE STRUCTURE PLAN FOR FOUNDATION DETAIL. p8 , o cC �� <br />No-CCO #29 -SUPPLEMENT \ - Z <br />11 INSTALL No. 2 PULL BOX PER PG&E REQUIREMENT. COORDINATE 02 03 DH <br />WITH PG&E FOR SERVICE CONNECTION. <br />f McHenry Ave Corridor Improvement Project �' 6' x 10' - -2 C, 2#10 = <br />12 INSTALL TYPE 1 A POLE ON BARRIER. SEE STRUCTURE PLAN PROPOSED PHASE DIAGRAM Co <br />FOR FOUNDATION DETAIL. AS-BUILT <br />EVUDa = 02 + 05 � G <br />F13] INSTALL PULL BOX EVERY 200'. EVUDb = 04 + 07 <br />Resident Engineer - Mauricio Rivera, P.E. <br />SURVEY <br />DATUM: <br />FILE No.: <br />EVUDC = 01 + O6 - 9/28/2021 <br />EVUDd = 03 + 08 Revisions By <br />REVISION DESCRIPTION BY DATE SCALE PREPARED BY DATE P Q N SAN JOAQUIN COUNTY PUBLIC WORKS DRAWING <br />1 "= 20' K W 10 5 16 T _, �oG TRANSPORTATION DIVISION <br />Realign loop detectors, Sta. 43+05 to 43+75 DUF 01/2018 HORIZONTAL: DRAWN: / / P E'1 <br />Revise pole type. Sta. 39+20 KC 03/07/18 VERTICAL: Y. y & C TRANSPORTATION CONSULTANTS, INC. Q SKIN Y. CHAN <br />KC 10/5/16 &° 3250 RAMOS CIRCLE V) -� McHENRY ENT 1 No. 55391 OF <br />Recut River Rd loops to match Limit Lines DUF 2/27/20 DESIGNED: n <br />p I I I I I D K Y 10 5 16 ' C�, SACRAMEN T0, GA 95827 I I� . <br />CHECKED: / / (916) 366-8000 FAX: (916) 366-8008 • �. � • � Exp. 12/31/16 * E-2 <br />INCHES , SIGNAL AND LIGHTING �, CIVIL ,�. SHEET <br />0 tl 20 30 40 IC APPROVED: ql.; - N �P -!r� O C� <br />I MILLIMETERS R <br />