My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
M590 - M778
PublicWorks
>
VAULT MAPS
>
Large Plans - LP
>
Drawer M
>
M558 - M
>
M590 - M778
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2025 9:36:09 AM
Creation date
4/25/2025 9:47:25 AM
Metadata
Fields
Template:
Large Plans - LP
Project
McHenry Avenue Corridor Improvements
Limits
1487' South of River Road to 190' South of Jones Avenue
Year
2016
Project Engineer
R. Gibson
Roads Worked
McHenry Ave.
Red Lines
Yes
Federal #
STPL-5929(196), BRLS-5929(166), BRLS-5929(167), CML-5929(247)
Supplemental fields
Classification
As-Builts
Cross Ref
M558 - M778
Type
Corridor Improvements
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
O NEMA 3R Pull box with screw mounted lid. Attach to underside of bridge deck with 7/8" unistrut. BVC 42+25.00 EVC 47+75.00 <br />BVC 30+50.00 EVC 32+50.00 Box size 18 x 18 x 6, for CVIN Fiber Optic Line. Conduits run to manholes off of bridge, as noted. Elev = 1 13.41 ' Elev = 1 16.93' <br />Elev = 97.86Elev = 99.98' <br />550 VC <br />0 i _ (� - -- - - ---- - _ <br />R/c- 0.315%/Sta PROFILE GRADE <br />NO SCALE <br />1138'-3" Measured along "M" Line <br />BB —� — -- CE Exp Exp Jt Exp Jt Exp Jt --- Jt ��-- EB <br />108'-6" 351'-0" 343'-6" ��� 289'-7 1 /4" 45'-7 3/4" <br />L <br />Frame 1 Frame 2 Frame 3 Frame 4 Frame 5 <br />30'-6" _ _ 2 Spans '�� 9 Spans @ 39 —0 = 351 —0 8 Spans @ 39 —0 = 312 —0 79 —7 1/4" i 120'-0" 90'-0" 45 —7 3/4 <br />1 <br />Approx OG <br />@ 39' —0" -- --- & FG <br />78' 0"-- <br />- .............. - <br />Ezi_ 2 0 �` Abut 26 <br />-- <br />- <br />II <br />Abut u 1 u u u U LJ <br />- <br />1 Bent Bent Bent Bent Bent Bent Bent Bent Bent Bent Bent Bent Bent Bent Bent Bent Bent Bent Bent Bent Bent <br />2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 1 1 1 1 1 1 1 1 Approx <br />Datum Elev 20.00 Li � � � FG Bent�24 Bent 25 <br />BenLJ <br />t 23 <br />32+00 33+00 34+00 35+00 36+00 37+00 38+00 39+00 40+00 41 +00 42+00 43+00 44+00 45+00 <br />ELEVATION <br />1" = 50' <br />BB "M" 32+50.54 <br />Elev 99.99 - TICE\ — P/L <br />_ o a <br />-----------------------------------__—_--_------------------------------------------- „------------� �a� oo �'� EP <br />(E) Top of slope Limits of Ground M Line = 'sue -R /W <br />I (E) Toe of slope- Improvement Exist Bridge (Approx) X �� ��% ��s EP o <br />BB Crown Line <br />lw MGS- R/W®®®®®®®��®®®�®®�®��®®®M32+50.54, 18.00Rt (o\ <br />0 Q) O o Y h <br />0 ®� ®� 0 0& ®� ®®®0 0®®®®®� ®� ®®®®� ®® 0 0 0 0 0 0 0 0 0 0 0\ C�� 0 — — <br />I / / Elev 100.35®000®0000®®®�l®®+��0®@®®®®®®0®®®®@00000000000®\ - - -- - - -- --- o \��j _ <br />— N U� — ' 1 — — -- — -- -- — -- — — — — — _.... 0- 0 a. e ® 0--& 0 0 0� 0-0 0 0 0 0 .r 1 J 0 0- 0 � 4�1 ®� � \ - \ \ <br />011 <br />J <br />I o Modesto' <br />E 31 32+00 33+00 34+00 35+00 36+00 37+00 38+00 39+00 40+00 41 +00 42+00 43+00 4+00 45+00 46+00 <br />I <br />i _ N00°22'44"W \ CP McHenry Avenue <br />— <br />o - -_-_ <br />To Escalon o <br />I C) a) o -0 <br />cD I C I C <br />o N LO - - - - ' <br />N <br />®00000 EB „M„43+88.59 u o �—_ <br />� Crown Line / 0ca-MGS Exp Jt, Typ 00000000000000000000000000000000000055 <br />N I 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 00 0 0 0 0 0 0 0 0 ` \ i <br />cn I --Top of slope EB Crown Line <br />"M" 43+98.99, 18.00' Rt o ~- EP <br />� � �\ \ / <br />_Toe of slope _— -- ��—R/W Elev 1 15.67 R W <br />PLAN � \ EP <br />1 " = 50' _ P/L <br />\ R/W <br />co <br />I N D E X TO PLANS McHenry Ave Corridor Improvement Project <br />SHEET NO. TITLE <br />120 <br />5-101 General Plan S-1 15 Abutment 1 Layout 5-130 Slab Layout and Section No. 1 — Spans 1 —3 S--145 Metal Bicycle Railing Details No. 1 <br />AS -BUILT <br />S-102 General Notes S-1 1 6 Abutment 26 Layout S-131 Slab Layout and Section No. 2 — Spans 4-12 S-146 Metal Bicycle Railing Details No. 2 <br />i S-103 Structure Plan No. 1 S-1 1 7 Abutment 26 Footing Layout S-132 Slab Layout and Section No. 3 — Spans 13-21 S-147 Barrier Mounted Sign Resident Engineer - Mauricio Rivera, P.E. <br />Q) S-104 Structure Plan No. 2 S-1 18 Abutment Details No. 1 S-133 Slab Layout — Top Reinforcement — Span 25 S-1 48 Joint Seal Assembly Structure Representative - David Franco, P.E. <br />v S-105 Structure Plan No. 3 S-1 19 Abutment Details No. 2 S-134 Slab Layout — Bottom Reinforcement — Span 25 S-149 Joint Seal Hinge Details Revisions By 9/28/2021 <br />S-106 Structure Plan No. 4 S-120 Typical Slab Bent Details S-135 Slab Reinforcement Details No. 1 S-150 Joint. Armor — Expansion Details E E G E N D ; �--� <br />S-107 Stage 1 Plan S-121 Bent 4 & 13 Layout S-136 Slab Reinforcement Details No. 2 S-151 Soil Legend <br />G S-108 Stage 2 Plan S-122 Bent 22 Layout S-137 Typical Section — Box Girder — Spans 22-24 S-152 Log of Test Borings No. 1 (D1 Indicates Low Structure Elevation 97.95 Feet <br />o S-109 Limits of Removal S-123 Bent 23 & 24 Layout S-138 Girder Layout — Spans 22-24 S-153 Log of Test Borings No. 2 <br />i S-110 Deck Contours No. 1 S-124 Bent 25 Layout S-139 Girder Details No. 1 20 Indicates Low Structure Elevation 105.76 Feet <br />S-1 1 1 Deck Contours No. 2 S-125 Bent Details No. 1 S-140 Girder Details No. 2 NOTES: <br />Q) S-1 12 Foundation Plan No. 1 S-126 Bent Details No. 2 S-141 Girder Details No. 3 Indicates 200 Yr Event Flood Water Elevation 83.8 Feet <br />S-1 13 Foundation Plan No. 2 S-127 Bent Details No. 3 S-142 Miscellaneous Details 1. For general notes, see "GENERAL NOTES" sheet. <br />�l S-1 14 Ground Improvement Details S-128 Column & Piling Details No. 1 S-143 Deck Drainage Details — Spans 1 —21 <br />co <br />NOTE: S-129 Column & Piling Details No. 2 S-144 Deck Drainage Details — Spans 22-25 2. For Pile Data Table and Hydraulic Summary, see <br />� THE CONTRACTOR SHALL VERIFY ALL CONTROLLING FIELD "FOUNDATION PLAN N0. 1" sheet. <br />0 <br />CD DIMENSIONS BEFORE ORDERING OR FABRICATING ANY MATERIAL. <br />SURVEY REVISION DESCRIPTION BY DATE SCALE PREPARED BY DATE Q 0 I N SAN JOAQU I N COUNTY PUBLIC WORKS - DRAWING <br />P <br />o DATUM: �� ' Cp F o q. <br />v HORIZONTAL: DRAWN: H. SULLIVAN 09-29-16 P"=COM —�� 5-101 <br />VERTICAL: <br />ORIN A. BROWN i F <br />� CZ J. FREKING 09-29-16 V): -< McHENRY m <br />a- o DESIGNED: T ,, <br />0 �_ AECOM Technical Services, Inc. No C4885s <br />I I I I I CHECKED: N. CALDERONE 09-29-16 2020 L Street, Suite 300 Exp. 09-30-18 * S-153 <br />O cn INCHES Sacramento, CA95811 � McHENRY AVE BRIDGE OVER STANISLAUS RIVER (REPLACE) s� ����� �P <br />a 0 30 40 50 0. BROWN 09-29-16 T 916.414.5800 F 916.414.1557 �, d�P (REPLACE) 9TFOF CA1�F��� SHEET <br />-� APPROVED. 9 <br />�' o FILE No. - Highlight anticipated locations far pull boxes. DF 6/07/18 � I I I I I ! � F.�. � � 105 of 176 <br />MILLIMETERS GENERAL PLAN <br />
The URL can be used to link to this page
Your browser does not support the video tag.