My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
M590 - M778
PublicWorks
>
VAULT MAPS
>
Large Plans - LP
>
Drawer M
>
M558 - M
>
M590 - M778
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2025 9:36:09 AM
Creation date
4/25/2025 9:47:25 AM
Metadata
Fields
Template:
Large Plans - LP
Project
McHenry Avenue Corridor Improvements
Limits
1487' South of River Road to 190' South of Jones Avenue
Year
2016
Project Engineer
R. Gibson
Roads Worked
McHenry Ave.
Red Lines
Yes
Federal #
STPL-5929(196), BRLS-5929(166), BRLS-5929(167), CML-5929(247)
Supplemental fields
Classification
As-Builts
Cross Ref
M558 - M778
Type
Corridor Improvements
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
44p -9 12 1 2 4'- 0 " 46'-11 3/4" Max to 44'-9" Min 24'-0" <br />Stage 2 Construction 2'-0, Stage 2 Traffic Stage 2 Construction 2'--0" Stage 2 'Traffic <br />M" Line—, Crown Line--,, 8 p arrier <br />6 _0It M " Line Crown Line Barrier <br />" 12 __0 12'-0" <br />Lane Lane Barrier 18'-0" 6'-O)l 12p-011 12'-0" 1'-9" <br />Metal X.- <br />6'- 9 Metal <br />_-K A- i 3'__0" __�!6 9 Lane Lane Barrier <br />Bicycle Railing SW Gutter Line Closure Pour Temporary Bicycle Railing SW -Gutter Line 1 3 _0" <br />Closure Pour <br />oz— Deck Drain, K-Rail Temporary <br />t-64 MB11-63 BIPP62 <br />/�-Pc J� Deck Drain, <br />B11-64 811- 3 Bil 6 Conc Barrier -2% -2% RSP -2% -20/0 K-Rail <br />-64 B1 -63 B1 -62 -ier <br />B11 1 Conc Barr PG <br />Ty p 1 Typ <br />Ty p e 8 0 S W Type 80SW <br />CIP Reinf 00 Const 4" CVIN F/0 <br />Conc Slab it 4'p CIP PS Conc <br />E CVIN N F/0 Box Girder��� '17--const it <br />0- CD <br />C1_j 24" Octagonal <br />6� PC/PS Pile 48"0 Reinf L0 <br />C) <br />@ Bent 2 t h r u -Approx Conc Col, Ty p Approx OG FG <br />0 <br />CN Beni: 2' N only OG = FG <br />6 72"0 C I D H Pile @ F-1 — — 1-1 F I I I F L_ 17-1 — — L, <br />P11) Construct ground Bent 23 & Bent 24 <br />0- improvements IjAi 1114 illou <br />(0 54'0 CIDH Pile @ <br />II <br />In not all shown/, <br />6 see Note 4 Bent 22 & Bent 25---"*' <br />E <br />Mcf-4rify A" Comidor WpWoveippant Pit TYPICAL. SECTION BENT 22 THRU 25 STAGE 2 <br />TYPICA11 SECTION ABUT 1 THRU BENT 22 STAGE 2 Date Accepted <br />Cn — 1/89Y <br />31/8" — 1 1-0?p AS -BUILT <br />-0 Restdont Enpmw - Maufto Rivera, P.E. <br />06 Structure Repreawt0vo - David Franco, P E. <br />CD <br />Rev.W. By 0 -F F"(' une 8, 2021 <br />��UN�)IIKUUIIUN SEQUENCESTAGE 2- 111 04'-4 7/8" Max to 80'-8 3/4" Min <br />1 Relocate existing CVIN F/0 to right overhang of Stage 1 bridge. See "Road 69'-8 3/8" Max to 46'-11 3/4" Min 0 <br />M Plans" for CVIN F/0 details. 2'- 0 24 <br />Stage 2 Construction Barrier <br />Stage 2 Traffic Type -A �ES 7 <br />Signal Pole M" Line----, Crown Line--,,, Standard AO-21 <br />2. Transfer traffic to new structure. 6'- 0 12- 0 12'-0" <br />18'-0" <br />j- and Lane Lane <br />Metal Signal Pole <br />3. Remove existing bridge, see "LIMITS OF REMOVAL" sheet. --96'-- 9 Varies <br />Bicycle Railing z 2'- 9 <br />S W Temporary <br />U ,,,--Gutter Line Closure Pour 1'-9"___ <br />- <br />:D K-Rail <br />L 4. lk"onstruct ground improvements. See "GROUND IMPROVEMENT DETAILS" sheet for Barrier <br />-4.- RSP Deck Drain, PIS --2% -2% Ln I Stage 2 construction limits. B11-64 B11-63 B11-6 Conc Barrier Typ <br />Type 80SW <br />a LA:i�t7r I Signal Pole <br />5. Construct Stage 2 bridge. <br />Signal Pole Const it Support, <br />s -q- <br />C_ Support, see/ CIP Reinf see Note 7 <br />6. Construct closure pour, see Falsework Release Notes on 'SLAB REINFORCEMENT <br />Note 7 Conc Slab 4" CVIN F/0 <br />DETAILS No. 1" and "GIRDER LAYOUT -SPANS 22-24" Sheets. <br />00 <br />0_4 7. For Signal Pole Support details, see "MISCELLANEOUS DETAILS" sheet. <br />NOTE: SLAB SECTION (SPAN 25) STAGE 2 <br />oTHE CONTRACTOR SHALL VERIFY ALL CONTROLLING FIELD 1/8" = 1'-0)t <br />C:) DIMENSIONS BEFORE ORDERING OR FABRICATING ANY MATERIAL. <br />SURVEY REVISION DESCRIPTION BY DATE SCALE PREPARED BY DATE <br />SAN JOAQUIN COUNTY PUBLICNo WORKS <br />0 DATUM: 0 F <br />HORIZONTAL: H. SULLIVAN 09-29-16 �c0m <br />DRAWN: sw, <br />Irv. <br />VERTICAL: <br />0- <br />Z3 J. FREKING 09-29-16 ORIN A. BROYM <br />DESIGNED: <br />McHENRY AVE CORRIDOR IMPROVEMENTS <br />0 0 1 2 AECOM Technical Services, Inc. 7 No. C4W59 <br />0 <br />Z . 09-30-18 —A I CHECKED: N. CALDERONE 09--29-16 2020 L Street, Suite 300 Exp <br />(n INCHES Sacramento, CA 95811 STANISLAUS RIVER (REPLACE) <br />A McHENRY AVE BRIDGE OVER CIVILir <br />0 0 10 20 30 40 50 APPROVED: 0. BROWN 09-29-16 T 916.414.5800 F 916.414.1557 It- OF Ch0i <br />U0 <br />q, FILE No. STAGE 2 PLAN <br />0 MILLIMETERS <br />DRAWING <br />S-108 <br />OF <br />S153 <br />SHEET <br />112or176 <br />
The URL can be used to link to this page
Your browser does not support the video tag.