Laserfiche WebLink
CL <br />00 <br />U <br />1 <br />co <br />0 <br />N <br />CC <br />N <br />0- <br />00 <br />CV <br />I <br />� Exist Brg <br />Abut 1 —� <br />Remove existing <br />Abutment ----, <br />9,-9„t <br />% OG <br />�I <br />o <br />r` I V-3 <br />1 <br />POIIA� <br />b�J <br />Exist Pile <br />Abut 1 <br />i\ FG o c <br />I <br />N I f <br />1'-3„ <br />EXIST ABUTMENT 1 (REMOVAL) <br />3P/8" — 1 '---0„ <br />I'M" Line = ,,,--Crown Line <br />Exist Bridge (Approx) ~` 18'-0" 3'-0" <br />— / 33,-9„ <br />30'-7"f (Existing) i 24'-0" <br />s <br />2'-8 1 /2"± <br />lI 1.8%t —1.8%f _ <br />ci <br />�_/_ �T11I_ _ 1- <br />,I <br />Remove existing ✓� <br />structure � CN <br />I I I� <br />r <br />I I <br />il <br />-- 7 <br />� II II III <br />LJ <br />7Exist <br />Pile, Typ <br />I <br />Stage 2 Traffic <br />Temporary <br />K—Rail <br />I <br />Barrier <br />�. ``----- 4" CVI N F/O <br />IIII ���� IIII IIII <br />IIII IIII IIII IIII <br />IIII IIII IIII IIII <br />IIII IIII IIII IIII <br />IIII IIII IIII IIII <br />IIII IIII IIII IIII <br />IIII IIII IIII IIII <br />IIII IIII IIII IIII <br />1.JAL1 1J,�L1 1 LL 11fLL <br />Approx OG = FG <br />EXI:�T ABUT 1 THRU EXIST BENT 32 - STAGE 2 (REMOVAL) <br />„ <br />N NOTE: NOTE: <br />i <br />-H <br />Approx 0G = FG CD <br />I <br />i� <br />+I " <br />I <br />Md fogy A"WWwwwt <br />DIU Ampted <br />AS -BUILT <br />RnWsM Ergh,nr - Mourimo Rkwo. P.E. <br />SMxbxe R.prn.rastw - DrM F,lYfco, P.E. <br />RMAWOM By P, rP# J f C Maw 3.2021 <br />CD THE CONTRACTOR SHALL VERIFY ALL CONTROLLING FIELD Bridge removal includes rock slope protection and concrete <br />C) DIMENSIONS BEFORE ORDERING OR FABRICATING ANY MATERIAL. rip —rap adjacent to footings and columns. <br />4'-6"f <br />Exist Brg Abut 36 <br />Remove existing <br />Abutment <br />FG <br />Exist Pile, Typ--- <br />7,-6 <br />3' <br />0„ <br />__- <br />i -4„± <br />Abut 26 <br />EB <br />EXIST ABUTMENT 36 (REMOVAL) <br />3/8>, — i ,-011 <br />1 <br />I'M" Line = 18 ,-0 „ --Crown Line <br />Exist Bridge (Approx) �`\� - 3'-0" <br />33'-9" <br />30'-7"f (Existing) 24'-0" _ ,-9„ <br />2'-8 1 /2"� Stage 2 Traffic Barrier <br />'— <br />Temporary <br />—1.8%± K—Rail <br />I <br />- - - - - - 4" CVIN F/0 <br />Remove existing <br />structure ---._ �" �`" <br />— Approx OG = FG <br />I I I I <br />- <br />0 20'-6" Exist Pile, Typ <br />O c r, U) <br />I <br />- U) U <br />N W <br />EXIST BENT 33 THRU EXIST BENT 35 - STAGE 2 (RE <br />1 /8„ = 1 x .__.. O„ <br />SURVEY <br />REVISION DESCRIPTION BY DATE SCALE <br />PREPARED BY <br />DATE <br />o DATUM: <br />U <br />HORIZONTAL: <br />DRAWN: H. SULLIVAN <br />09-29-16 <br />fizcom <br />3 s <br />VERTICAL: <br />3 <br />Q- 0 <br />DESIGNED: J. FREKING <br />09-29-16 <br />a >_ <br />0 t <br />2 <br />AECOM Technical Services, Inc <br />I I I <br />� <br />I N. CALDERONE <br />: <br />CHECKED: <br />09-29-1 <br />6 <br />2020 L Street, Suite 300 <br />- <br />Sacramento, CA 95811 <br />Q tQ 20 30 40 <br />50 APPROVED: 0. BROWN <br />09-29-16 <br />T 916.414.5800 F 916.414.1557 <br />I I <br />0 FILE No. <br />— — — — I MILLIMETERS <br />c <br />�_ <br />SAN JOAQUIN COUNTY PUBLIC WORKS <br />I- <br />McHENRY AVE CORRIDOR IMPROVEMENTS W <br />N oRINo. C43859 A <br />r Exp.09-30-18 <br />MCHENRY AVE BRIDGE OVER STANISLAUS RIVER (REPLACE) llE CIVIL <br />OF <br />LIMITS OF REMOVAL <br />DRAWING <br />S-109 <br />OF <br />S-153 <br />SHEET <br />I1 13ar-,176 <br />