My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
M590 - M778
PublicWorks
>
VAULT MAPS
>
Large Plans - LP
>
Drawer M
>
M558 - M
>
M590 - M778
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2025 9:36:09 AM
Creation date
4/25/2025 9:47:25 AM
Metadata
Fields
Template:
Large Plans - LP
Project
McHenry Avenue Corridor Improvements
Limits
1487' South of River Road to 190' South of Jones Avenue
Year
2016
Project Engineer
R. Gibson
Roads Worked
McHenry Ave.
Red Lines
Yes
Federal #
STPL-5929(196), BRLS-5929(166), BRLS-5929(167), CML-5929(247)
Supplemental fields
Classification
As-Builts
Cross Ref
M558 - M778
Type
Corridor Improvements
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
p <br />Q <br />0 <br />N <br />..�WWLOL <br />I <br />I <br />I <br />I <br />E0D- - <br />33'-9" <br />Stage 1 Construction <br />00 <br />-I <br />r", <br />N <br />(50 <br />1 <br />O <br />o <br />N <br />� <br />00 <br />V) <br />U, <br />3r <br />u7 <br />r-- <br />! <br />cn UXJ <br />M <br />L <br />BO-5 <br />5-2 Const Jt - <br />rBO- <br />5-25 Const Jt <br />M <br />INTERMEDIATE WINGWALL FOR STAGE 2. <br />TOP OF WALL IS 3' BELOW FG. <br />Crown Line <br />18'-0" <br />21 '-0" <br />PLAN <br />1 /4" = 1'-0' <br />r Crown Line <br />100, <br />—2% <br />I- _v <br />ELEVATION <br />1 /4„ — 1 ' —O, <br />Class 140 Pile, Typ rBO-5 <br />� Const Jt --� <br />5-2 <br />i <br />- -' <br />L <br />cn <br />0 <br />Q � � <br />Crown Line <br />FG <br />-4—. <br />— Abut 1 <br />- T <br />1 <br />Line <br />I <br />LAf <br />44' — 8 5/8" <br />Stage 2 Construction <br />"M" Line <br />---- "M" Line <br />V_ <br />o- <br />Abut 1 <br />i <br />-4-- <br />Abut 1 — <br />Pile <br />1' 3" V-3" <br />I <br />#8 Tot 3 --- <br />COnst <br /># <br />0 4 , tees <br />@ 12 vertical <br />12 horizontal <br />r <br />6'-0" <br />--- # 7 _ 12 <br />#8 /� @ 6 <br />I <br />Main slab <br />Reinf <br />7mfer <br />..___ E 0 D r 1� <br />I , <br />#5 @ 12 <br />Geocomposite <br />Drain, see Note 1-, •� <br />#8 Tot <br />FG or OG <br />Top Of pile = =�_ Q) <br />pile cut—off Elev 4 '1 \ �� CD <br />a° <br />� I <br />� � U <br />---------� Class 140 Pile <br />B2-5 <br />Abut Pile N <br />0— <br />SECTION A --A <br />3/4" = 1'-0' <br />NOTES: <br />1. For drainage details, see details on "MISCELLANEOUS DETAILS" sheet. <br />2. For wingwall details, see "ABUTMENT DETAILS NO. 2" sheet. <br />McHenry Ave Corridor Improvement ProjU�,L <br />U <br />-B I A T L <br />= 3 Spaces @ 8'-9" 8'—9 8'-9 6'-9 2 Spaces @ 8'-9" <br />== Resident Engineer - Mauricio Rivera, P.E. <br />! 2'-0' <br />Structure Representative - David Franco, P.E. <br />N NOTE: Revisions By ���-- 9/28/2021 <br />� THE CONTRACTOR SHALL VERIFY ALL CONTROLLING FIELD PILE LAYOUT - <br />0 <br />CD DIMENSIONS BEFORE ORDERING OR FABRICATING ANY MATERIAL. 1 /4" = 1'—O' <br />i <br />SURVEY REVISION DESCRIPTION BY DATE SCALE PREPARED BY DATE C1. U N SAN JOAQU I N COUNTY PUBLIC WORKS 6 DRAWING <br />P <br />o DATUM: �� p F q <br />U HORIZONTAL: DRAWN: H. SULLIVAN 09-29-16 �Lcom /�`� �Fy S-115 <br />VERTICAL: DESIGNED::McHENRY AVE CORRIDOR IMPROVEMENTS W ORIN A. BROWN m O F <br />71 0-0 > J. FREKlNG 09-29-16 AECOM Technical Services, Inc. T / No, C48859 <br />a _ 0 1 2 s <br />— ADD CONTRACTOR FUNDED WINGWALI. ADKO 02/08/18 I I I I I A. VOSOOGHI 09-29-16 2020 L Street, Suite 300 * Exp. 09-30-18 5-153 <br />—� co CHECKED. McHENRY AVE BRIDGE OVER STANIS�AUS RIVER REPLACE <br />� "' _� AS SHORING SYSTEM FOR STAGE 2 INCHES Sacramento, CA 95811 > sr9T Clvl� ��� SHEET <br />0 10 20 30 40 50 0. BROWN 09-29-16 T 916.414.5800 F 916.414.1557 _ P F of CA0i <br />cn .� -� (Submittal #72-r1) I I I I I I APPROVED: qr - . �• <br />0 FILE No. : — -- - MILLIMETERS F ® R ABUTMENT 1 LAYOUT 119 of 17 6 <br />-4—. <br />— Abut 1 <br />- T <br />1 <br />Line <br />I <br />LAf <br />44' — 8 5/8" <br />Stage 2 Construction <br />"M" Line <br />---- "M" Line <br />V_ <br />o- <br />Abut 1 <br />i <br />-4-- <br />Abut 1 — <br />Pile <br />1' 3" V-3" <br />I <br />#8 Tot 3 --- <br />COnst <br /># <br />0 4 , tees <br />@ 12 vertical <br />12 horizontal <br />r <br />6'-0" <br />--- # 7 _ 12 <br />#8 /� @ 6 <br />I <br />Main slab <br />Reinf <br />7mfer <br />..___ E 0 D r 1� <br />I , <br />#5 @ 12 <br />Geocomposite <br />Drain, see Note 1-, •� <br />#8 Tot <br />FG or OG <br />Top Of pile = =�_ Q) <br />pile cut—off Elev 4 '1 \ �� CD <br />a° <br />� I <br />� � U <br />---------� Class 140 Pile <br />B2-5 <br />Abut Pile N <br />0— <br />SECTION A --A <br />3/4" = 1'-0' <br />NOTES: <br />1. For drainage details, see details on "MISCELLANEOUS DETAILS" sheet. <br />2. For wingwall details, see "ABUTMENT DETAILS NO. 2" sheet. <br />McHenry Ave Corridor Improvement ProjU�,L <br />U <br />-B I A T L <br />= 3 Spaces @ 8'-9" 8'—9 8'-9 6'-9 2 Spaces @ 8'-9" <br />== Resident Engineer - Mauricio Rivera, P.E. <br />! 2'-0' <br />Structure Representative - David Franco, P.E. <br />N NOTE: Revisions By ���-- 9/28/2021 <br />� THE CONTRACTOR SHALL VERIFY ALL CONTROLLING FIELD PILE LAYOUT - <br />0 <br />CD DIMENSIONS BEFORE ORDERING OR FABRICATING ANY MATERIAL. 1 /4" = 1'—O' <br />i <br />SURVEY REVISION DESCRIPTION BY DATE SCALE PREPARED BY DATE C1. U N SAN JOAQU I N COUNTY PUBLIC WORKS 6 DRAWING <br />P <br />o DATUM: �� p F q <br />U HORIZONTAL: DRAWN: H. SULLIVAN 09-29-16 �Lcom /�`� �Fy S-115 <br />VERTICAL: DESIGNED::McHENRY AVE CORRIDOR IMPROVEMENTS W ORIN A. BROWN m O F <br />71 0-0 > J. FREKlNG 09-29-16 AECOM Technical Services, Inc. T / No, C48859 <br />a _ 0 1 2 s <br />— ADD CONTRACTOR FUNDED WINGWALI. ADKO 02/08/18 I I I I I A. VOSOOGHI 09-29-16 2020 L Street, Suite 300 * Exp. 09-30-18 5-153 <br />—� co CHECKED. McHENRY AVE BRIDGE OVER STANIS�AUS RIVER REPLACE <br />� "' _� AS SHORING SYSTEM FOR STAGE 2 INCHES Sacramento, CA 95811 > sr9T Clvl� ��� SHEET <br />0 10 20 30 40 50 0. BROWN 09-29-16 T 916.414.5800 F 916.414.1557 _ P F of CA0i <br />cn .� -� (Submittal #72-r1) I I I I I I APPROVED: qr - . �• <br />0 FILE No. : — -- - MILLIMETERS F ® R ABUTMENT 1 LAYOUT 119 of 17 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.