My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
M590 - M778
PublicWorks
>
VAULT MAPS
>
Large Plans - LP
>
Drawer M
>
M558 - M
>
M590 - M778
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2025 9:36:09 AM
Creation date
4/25/2025 9:47:25 AM
Metadata
Fields
Template:
Large Plans - LP
Project
McHenry Avenue Corridor Improvements
Limits
1487' South of River Road to 190' South of Jones Avenue
Year
2016
Project Engineer
R. Gibson
Roads Worked
McHenry Ave.
Red Lines
Yes
Federal #
STPL-5929(196), BRLS-5929(166), BRLS-5929(167), CML-5929(247)
Supplemental fields
Classification
As-Builts
Cross Ref
M558 - M778
Type
Corridor Improvements
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Abutment = <br />Footing <br />Wingwall, <br />see Note 2 <br />r <br />IIj�l1'—Y 1 <br />EB <br />##8 1 <br />i <br />E _ <br />0- • i - (+�� #8 Tot 3 <br />u7 <br />`1 I Optional <br />Const Jt <br />N I <br />v a �.` I I - @ 12 vertical <br />a * 12 horizontal <br />v DETAIL A FOR AUJUSTED GRADES <br />j - ADDED CAP STIRRUPS 11/12/2018 <br />Q0 <br />L <br />ry <br />/ <br />a) <br />Cn <br />/ <br />U <br />cn <br />/ <br />0 <br />0 <br />Q <br />U <br />U <br />�I <br />00 <br />N <br />u u <br />s <br />70' _0 1 /g„ <br />49'-2 3/4" <br />Added cap stirrup where raised grade result( <br />in excess clearance to original stirrups. <br />"M" Line <br />�. A <br />1 /8" = 1 <br />Note: Footing not shown. <br />—"M" Line <br />�A Closure Pour <br />Superstructure only <br />FG <br />i <br />u u <br />NOTE: <br />o THE CONTRACTOR SHALL VERIFY ALL CONTROLLING FIELD <br />Q0 DIMENSIONS BEFORE ORDERING OR FABRICATING ANY MATERIAL. <br />/ <br />SURVEY REVISION DESCRIPTION <br />o DATUM: <br />U <br />3 <br />:C <br />CT 0 <br />O . <br />O — <br />U) <br />cn <br />FILE No. <br />I <br />ADD CAP STIRRUP DETAIL <br />ELEVATION <br />1 /8" = 1 '-0' <br />DATE SCALE PREPARED BY <br />HORIZONTAL.: DRAWN: H. SULLIVAN <br />VERTICAL: <br />DESIGNED. 0. BROWN <br />0 1 2 <br />i 1/12/1 t: I I I II CHECKED: A. VOSOOGHI <br />INCHES <br />0 10 20 30 40 50 APPROVED: 0. BROWN <br />I I I I I <br />MILLIMETERS <br />--Crown Line <br />I I I <br />u u <br />Const Jt BO-5 <br />5-2 <br />I <br />U u u <br />DATE <br />09-29-16 fi0com <br />09-29-16 <br />AECOM Technical services, Inc <br />09-29-1 6 2020 L Street, Suite 300 <br />Sacramento, CA 95811 <br />09-29-16 T 916.414.5800 F 916.414.1557 <br />#8 @ 6 <br />Main slab Reinf <br />0: <br />IV , <br />o <br />4" Chamfer <br />r <br />#8 Tot 3 <br />1 %9" Expanded \ <br />Polystyrene, Typ <br />r�,,,,, <br />Top of pile = <br />pile cut—off Elev <br />-----7 <br />� 30 Z_0 <br />co v C I r, Ty p <br />Class 140 Piles -r/ <br />Abutment = <br />Footing <br />1'-3" I V-3" <br />EB <br />(i,` j -- #8 Tot 3 <br />I <br />• j Optional <br />Const Jt o <br />I <br />I I � <br />#4 -- ties <br />Q 12 vertical <br />— 12 horizontal <br />r r <br />#8 �r-j @ 12 <br />i <br />---- Geocomposite Drain <br />see Note 1 <br />i <br />15„ <br />#6 1 42" © 12, TYP <br />15 <br />/ #8 Tot 6 <br />/ <br />i • • � U <br />#8 Tot 6 <br />-#6 ® 12 <br />132 — 5�_- <br />3 <br />1'-6„ 1' 6„ <br />Pile I Pile <br />McHenry Ave Corridor Improvement Project <br />AS -BUILT <br />Resident Engineer - Mauricio Rivera, P.E. <br />Structure Representative - David Franco, P.E. <br />Revisions By - -- 9/28/2021 <br />" U ' N� o <br />40 <br />777 <br />3,-0„ 3,-0„ <br />SECTION A —A <br />NOTES: <br />1, For drainage details, see details on "MISCELLANEOUS <br />DETAILS" sheet. <br />r <br />2. For wingwall reinforcement, see "ABUTMENT DETAILS NO. 1 <br />and NO. 2" sheets. <br />SAN JOAQUIN COUNTY PUBLIC WORKS <br />i e <br />` Fy <br />ORIN A. BROWN m <br />W N o C48859 r <br />McHENRY <br />McHENRY AVE BRIDGE OVER STANISLAUS RIVER (REPLACE) * EXPCIVI -18 <br />`!'1,, CIVIL �P <br />lF CF CAl\FOB <br />ABUTMENT 26 LAYOUT <br />DRAWING <br />S-116 <br />OF <br />S-153 <br />SHEET <br />120OF176 <br />J <br />
The URL can be used to link to this page
Your browser does not support the video tag.