Laserfiche WebLink
,z <br />00 <br />N <br />66 <br />0 <br />I <br />0 <br />N <br />CD <br />N <br />d <br />Q3 <br />Cn <br />Q) <br />E <br />I-- <br />3 <br />Cn <br />/ <br />m <br />4 9 <br />1'-0" Maxi Footing - Footing - \ <br />Typ <br />Reinf <br />1, <br />Reinf <br />DETAIL 1 — PART PLAN FOOTING REINF <br />3/8" = 1'-0' <br />Detail 1 <br />� Abut 26 <br />49"__2 3;4„ <br />#8 Longitudinal Reinf <br />Stage 2 Const <br />Crown Line <br />1'-0" Max <br />Typ <br />#6 Transverse Reinf <br />top and bottom, <br />flare as shown <br />/ 3'-0" <br />3� <br />2_#8 <br />Top & Bottom <br />� ) � Const Jt <br />DETAIL 2 — PART PLAN FOOTING REINF <br />3/8„ = 1 '-0' <br />20'-9 1 /2" <br />#8 Longitudinal Reinf <br />extend 2'-9" beyond <br />construction joint <br />Detail 2 --� <br />3 Spaces @ 12'-0" = 36'-0" 6'-0" 6'-0" 12'-0" <br />Class 140 Pile, Typ <br />I I j <br />I <br />"M" Line I I � <br />7 Spaces C�? 6 -0 = 42 -0 2 Spaces @ 6'-0" _ <br />3'-0" 3'-0" <br />FOOTING PLAN <br />00 <br />N <br />NOTE: <br />� <br />THE CONTRACTOR SHALL VERIFY ALL CONTROLLING FIELD <br />0 <br />CD <br />DIMENSIONS BEFORE <br />ORDERING OR FABRICATING ANY MATERIAL. <br />/ <br />SURVEY <br />REVISION DESCRIPTION BY DATE <br />SCALE <br />PREPARED <br />BY <br />o <br />DATUM: <br />U <br />HORIZONTAL: <br />DRAWN: H. <br />SULLIVAN <br />Q- <br />VERTICAL: <br />0. <br />BROWN <br />a <br />DESIGNED: <br />� D <br />REPLACE BROKEN PILE WITH EXTRA PILE DF/TB 11/8/1-' <br />0 1 <br />I i I I <br />2 <br />I CHECKED: A. <br />VOSOOGHI <br />-A <br />INCHES <br />-- <br />� c <br />0 10 20 30 40 <br />50 APPROVED: 0. <br />BROWN <br />FILE No. : <br />- - - - <br />MILLIMETERS <br />� J <br />DATE <br />09-29-16 <br />�Com <br />09-29-16 <br />AECOM Technical Services, Inc. <br />09-29-1 <br />6 <br />2020 L Street, Suite 300 <br />Sacramento, CA 95811 <br />09-29-16 <br />T 916.414.5800 F 916.414.1557 <br />Indicates Class 140 Pile <br />Indicates Class 140 1:3 Battered Pile <br />McHenry Ave Corridor Improvement Project <br />AS -BUILT <br />Resident Engineer - Mauricio Rivera, P.E. <br />Structure Representative - David Franco, P.E. <br />Revisions By _9/28/2021 <br />SAN JOAQUIN COUNTY PUBLIC WORKS <br />McHENRY AVE CORRIDOR IMPROVEMENTS/ <br />McHENRY AVE BRIDGE OVER STANISLAUS RIVER (REPLACE) <br />ABUTMENT 26 FOOTING LAYOUT <br />GRIN A. BROWN <br />� No. C48859 � <br />it Exp. D9-30-18 <br />r CIVIL .P <br />OF CAL�F1)�a <br />DRAWING <br />S-117 <br />OF <br />5-153 <br />SHEET <br />121 QF176 <br />