My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
M590 - M778
PublicWorks
>
VAULT MAPS
>
Large Plans - LP
>
Drawer M
>
M558 - M
>
M590 - M778
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2025 9:36:09 AM
Creation date
4/25/2025 9:47:25 AM
Metadata
Fields
Template:
Large Plans - LP
Project
McHenry Avenue Corridor Improvements
Limits
1487' South of River Road to 190' South of Jones Avenue
Year
2016
Project Engineer
R. Gibson
Roads Worked
McHenry Ave.
Red Lines
Yes
Federal #
STPL-5929(196), BRLS-5929(166), BRLS-5929(167), CML-5929(247)
Supplemental fields
Classification
As-Builts
Cross Ref
M558 - M778
Type
Corridor Improvements
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3 <br />W <br />66 <br />0 <br />I <br />(10 <br />0 <br />N <br />0 <br />N <br />d <br />(U <br />V) <br />w <br />E <br />i= <br />a� <br />3 <br />N <br />0 <br />U <br />a-+ <br />/ <br />0 <br />d <br />v <br />/ <br />a� <br />U <br />DO <br />N <br />N <br />0 <br />0 <br />c0 <br />c <br />3 <br />0 <br />0 <br />c � <br />0 <br />0 <br />0 <br />3 <br />c <br />cn <br />I <br />Bent <br />Column <br />/ <br />/ <br />Detail 1, <br />see Note 4 <br />---_---- Edge of Deck <br />,�--Edge of <br />Soffit <br />ti <br />#6 Stirrups <br />12'-10 3/4" <br />71 " <br />- 16 0 Opening Column, Typ <br />u-7 for Drain Pipe <br />„M" Line <br />l - <br />f / � <br />Stage 2 Construction <br />Stage 2 Congtrur-tinn <br />Crown L <br />Detail 2 <br />see Note 4 <br />� � n <br /># 14, Typ Bottom Reinforcement <br />Main Bent Cap <br />Reinf, Typ <br />--a--1--a--I-a-�4---+------------ <br />Line Crown Line <br />Stage 2 Constructior <br />�s <br />Const A <br />C stdr— <br />------- --i-1--�-+-�- E-�-�-I--4-444-f <br />P ` <br />I ra <br />16 0 Opening 7 11 C <br />for Drain Pipe U-7 <br />4'-6„ <br /># 6 ' © 8 #6 Tot 4, <br />Typ Typ © Columns <br />I I <br />I I <br />I <br />I I <br />I I <br />I I <br />I I <br />NOTE: <br />THE CONTRACTOR SHALL VERIFY ALL CONTROLLING FIELD <br />DIMENSIONS BEFORE ORDERING OR FABRICATING ANY MATERIAL. <br />SURVEY I REVISION I DESCRIPTION <br />DATuM: <br />FILE No. <br />Top Reinf, <br />PLAN <br />1/4„ - 1'-0" <br />Stage 1 Construction <br />0" Closure Pour <br />I� <br />1 1 F"1 Typ <br />NO CHANGES <br />MO%nq Ave Cot W knpro WWA Pt jW <br />Date AGGGPW <br />AS -BUILT <br />Resident Engmw - Mouriolo Rfwra, P.E. <br />Structuns RWaaantatiw - DaMd Enwo, P E. <br />Rwisions ay r , f s? ,, r., c c> .Mina a 20z, <br />Stage . Construction <br />�-- Const A <br />with <br />1 ' -0"X 1 <br />112 Keys <br />over 50% <br />of <br />area, both <br />sides <br />I <br />Detail 3 <br />Box Girder, see Note 4 <br />-0`1111111cD see Note 3 <br />I <br />I <br />I <br />I I <br />I I <br />I I I I <br />I I I I <br />---------- <br />I I I I <br />I I I I <br />I I I <br />I I I I I <br />I I I I <br />i <br />_ I <br />DEVELOPED ELEVATION <br />1 /4" - 1 ®„ <br />BY DATE SCALE <br />HORIZONTAL: <br />VERTICAL: <br />I I I I I <br />INCHES <br />121a 31 a[ I I <br />- MILOMETERS <br />PREPARED BY <br />DRAWN: H. <br />SULLIVAN <br />DESIGNED: J. <br />FREKING <br />CHECKED: Z. <br />ABAJIAN <br />APPROVED: 0. <br />BROWN <br />DATE <br />09-29-16 <br />09-29-16 <br />09--29-16 <br />09--29--16 <br />#6= ® 8, Typ <br />Note: <br />Barrier and sidewalk not <br />shown for clarity. <br />P"=COM <br />AECOM Technical Services, Inc. <br />2020 L Street, Suite 300 <br />Sacramento, CA 95811 <br />T 916.414.5800 F 916.414-1557 <br />l: <br />9�\ <br />"0 Opening 7-1 <br />train Pipe 1.1-7 <br />/ <br />/ <br />_ � 1 <br />Detail 1 <br />see Note 4 <br />NOTES: <br />1. For Column and CIDH piling details, see <br />"COLUMN & PILING DETAILS NO. 2" sheet. <br />2. For Section 'C-C' and Section 'D-D', see <br />"BENT DETAILS NO. 1 sheet. <br />3. For CIP Box Girder, see "TYPICAL SECTION - BOX <br />GIRDER - SPANS 22-24" sheet. <br />4. For Detail 1 , Detail 2 & Detail 3, see "BENT DETAILS <br />NO. 2" sheet. <br />5. Stirrups to be placed perpendicular to and spaced <br />along of bent. <br />16"0 Opening 7-1 <br />for Drain Pipe(DU-7 <br />--48"0 Columns, <br />see Note 1 <br />Approx OG <br />I <br />I I <br />I I <br />I 72" 0 CIDH Piling, <br />I I <br />I <br />I see Note 1 <br />I I <br />Column, Typ <br />SAN JOAQUIN COUNTY PUBLIC WORKS <br />McHENRY AVE CORRIDOR IMPROVEMENTS 11 <br />McHENRY AVE BRIDGE OVER STANISLAUS RIVER REPLACE <br />BENT 23 AND 24 LAYOUT <br />DRAWING <br />F <br />S-123 <br />w �Z <br />ORIN A BROWN 'ir+ <br />0 F- <br />N o C4W59 m <br />Exp. 09-30-18 <br />CIVIL <br />S - 15 3 <br />�� <br />OF <br />SHEET <br />C lk <br />127oF176 <br />
The URL can be used to link to this page
Your browser does not support the video tag.