My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
M590 - M778
PublicWorks
>
VAULT MAPS
>
Large Plans - LP
>
Drawer M
>
M558 - M
>
M590 - M778
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2025 9:36:09 AM
Creation date
4/25/2025 9:47:25 AM
Metadata
Fields
Template:
Large Plans - LP
Project
McHenry Avenue Corridor Improvements
Limits
1487' South of River Road to 190' South of Jones Avenue
Year
2016
Project Engineer
R. Gibson
Roads Worked
McHenry Ave.
Red Lines
Yes
Federal #
STPL-5929(196), BRLS-5929(166), BRLS-5929(167), CML-5929(247)
Supplemental fields
Classification
As-Builts
Cross Ref
M558 - M778
Type
Corridor Improvements
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
E <br />Ca- <br />CN <br />-+1 <br />66 <br />0 <br />CD <br />C14 <br />Cd <br />(N <br />ca_ <br />w <br />E <br />CD <br />V) <br />D <br />L <br />-4— <br />cn <br />CD <br />L) <br />0.4. <br />M <br />C14 <br />C14 NOTE: <br />17\1711 <br />I_ISj q Pile, Typ <br />Line <br />Stage 2 Construction Stage 1 Construction <br />101-49 Do -"- <br />Crown Line 3 Detail 1 <br />#5 Stirrups Const Jt <br />Al ZN;� <br />r T <br />X <br />LA <br />Bent 22 _4t <br />+ <br />uoi s <br />#1 1, Typ <br />Edge of deck <br />we] <br />Stage 2 Construction <br />Bottom Reinforcement <br />ON -WA <br />PLAN <br />7 /4" = 1)-011 <br />/ <br />Line <br />Stage 2 Construction <br />Top Reinforcement <br />Edge of deck-----' <br />NO CHANGES <br />Md hm N y Ave CowWw k ip o -, w w it Pmpd <br />OM ACOWW <br />AS -BUILT <br />Resklwt ErWinew - Marbo Rkw P.L <br />shicbm " 0 NO - - D" FWNW P.E. <br />%wimoftey PaFAKoJCW & 20" <br />Stage 1 Construction <br />-Closure pour @ CIP Slab <br />CIP Slab Crown Line = Const Jt with 1'-0"X1 1/2 to <br />see Note 3 Keys over 50% of area <br />Elastomeric Brg Pod, Typ <br />see Note 4 <br />- - - - - - - - - - - - - - - - - - - - - <br />t7-- <br />-7, <br />T 1 0, <br />Typ <br />Main Bent Cap Reinf <br />� <br />41-61' A <br />IN 14' <br />#55 <br />4144 @1 2:Tot 4 # <br />Typ @ Columns <br />r L ---------- J <br />r1_ <br />THE CONTRACTOR SHALL VERIFY ALL CONTROLLING FIELD <br />DIMENSIONS BEFORE ORDERING OR FABRICATING ANY MATERIAL. <br />4-1 SURVEY REVISION DESCRIPTION <br />0 DATUM: <br />0 .'?: <br />0 <br />--5 <br />A <br />o <br />cr) <br />0 FILE No. <br />Detail 11 <br />ELEVATION <br />114.11 = 12-0*, <br />Note: <br />Barrier and sidewalk not <br />shown for clarity. <br />BY DATE SCALE PREPARED BY <br />HORIZONTAL: DRAWN: H. SULLIVAN <br />VERTICAL: J. FREKING <br />DESIGNED. <br />0 1 2 <br />1 1 1 CHECKED: Z. ABAJIAN <br />INCHES <br />0 10 20 30 40 50 APPROVED. O. BROWN <br />MILOMETERS <br />M <br />I <br />Bent cap <br />—48 20 0 Columns, <br />5 @ 12, Typ see Note 1 <br />Approx OG <br />54"0 CIDH Piling, <br />'ro�see Note 1 <br />Column, Typ <br />DATE <br />09-29-16 <br />AAECOM <br />09--29-16 <br />AECOM Technical Services, Inc <br />09-29-16 <br />2020 L Street, Suite 300 <br />Sacramento, CA 95811 <br />09--29-16 <br />T 916A14.5800 F 916.414.1557 <br />4 <br />Service <br />splice, Typ <br />11=01 -a <br />She 2 Const Stage I Const <br />0111 TRIMeffiffinkus I � I 1� <br />Const Jt with <br />1 '-0 ty X1 1/2 $$ Keys <br />over 50% of area <br />#1 1, Typ <br />She 2 Const Stage 1 Const <br />SIM-011- <br />Main Bent Note: Slab not <br />Cap Reinf shown for clarity. <br />Service <br />splice, Typ <br />F1 <br />—Const Jt BO-5 <br />5 D-2 <br />Main Bent <br />Cap Reinf 40 . "A <br />Bent cap Reinf, <br />/ / see "BENT' <br />DETAILS NO. 1 <br />Bend bars to sheet <br />match Stage i 'Bent Cap <br />Const bars, Typ ELEVATION soffit <br />Note: <br />Bent 25 shown, <br />Bent 22 similar. DETAIL 1 <br />3/4 op - 1 '-0 to <br />NOTES: <br />1. For Column and CIDH Piling details, see <br />"COLUMN & PILING DETAILS NO. 2" sheet. <br />2. For Section 'A -A' and Section '13-13', see <br />"BENT DETAILS NO. 1 sheet. <br />3. For CIP Slab reinforcement, see "SLAB LAYOUT AND <br />SECTION" sheets. <br />4. For ElaSt0meric Bearing pods, see "BENT DETAILS <br />NO. 3" sheet. <br />5. Stirrups to be placed perpendicular to and spaced <br />along �, of bent. <br />SAN JOAQUIN COUNTY PUBLIC WORKS <br />McHENRY AVE CORRIDOR IMPROVEMENTS/ <br />,V,cH'I— <br />NRY AVE BRIDGE OVER STANISLAUS RIVER (REPLACE) <br />BENT 22 LAYOUT <br />ORIN A. BROW <br />No C48859 rn <br />Exp. 09-30-18 <br />sr CIVIL <br />0 OF CA%011� <br />F <br />DRAWING <br />S-122 <br />0 F <br />S-153 <br />SHEET <br />126oF-I 76 <br />
The URL can be used to link to this page
Your browser does not support the video tag.