Laserfiche WebLink
7.0 MAINTENANCE <br />The JV shall monitor daily the condition of the haul route to ensure the roads are properly maintained <br />for drainage and safe road travel throughout the project. If any areas along the haul route are found to <br />be deficient in drainage the area will be repaired with suitable material using the equipment onsite to <br />provide positive drainage and reduce ponding. <br />8.0 ROADS AND HOURS OF OPERATION <br />The JV will use the roads for hauling materials, accessing the waterside and landside of the levee <br />within the construction limits shown in sheet G-006 of the drawings. The hours of operation will be <br />Monday – Saturday 7 am to 7 pm with trucking and hauling from 8:00 AM – 4:00 PM per specification <br />section 01 00 00, paragraph 1.7. No work or hauling activities will occur on government holidays unless <br />approved by the Contracting Officer. <br />4 | P a g e