<br />E L E VATI
<br />PLATFORM PIER
<br />To+ 2- 1/4 11 150Road
<br />eacl) Wale
<br />3 3 x , y cr.es
<br />lX( -
<br />I
<br />-- x 8 Sheo+hin5-
<br />Pier- 4
<br />I
<br />PLAN OF F E N D E
<br />I I
<br />/ FCsac, ofi pier wct 1 �. I
<br />6i GCt T wCI I k Z x l x 3 `D
<br />Bolf 'tzac� wc, lc +0 each pi Ie vwi` h %4� � ':a01-rs _0 � - � I l- k V14,1A
<br />77
<br />P1, 11.E I� T5`x'Z" s
<br />"z VVet � e
<br />- -- -- - i - - I--- -- - -- I - t
<br />All' wclS l, x 1" x� vi`101, till i
<br />I
<br />I-
<br />-
<br />. e
<br />--
<br />- -- -- - - - -- -t- - -- - I I 7r SECT' �_8 - 1'
<br />II 1I
<br />i
<br />i !
<br />2 v0'rf kcal 6"X Vs`
<br />hI 11
<br />a0-0 t ir1C ,
<br />A
<br />PAT _ ,V ,�� E 0C`u]
<br />—�I
<br />� lik I
<br />SCC.:ti0: �4 - � '�-
<br />SECTION A
<br />j, 11
<br />S-�d. gals. oi;.)e hot-idt-ail cind
<br />Dos+ boses with "- `���"� }�oI!� � �'Pier �4 7,
<br />it
<br />o I II II
<br />3/4' 601 �--- ..- 2Pi nK �'��� C- ------
<br />rF, 1 ; - -
<br />ter.
<br />- �'; E1ev. 13.25 III 4 — -
<br />r
<br />i._-,3 3 h x f� , '! e ca , Side,
<br />y To Li, G
<br />I �
<br />Fro nt f7ac e of Pie, r #/4 F__ E VAT 10 N
<br />ze
<br />PLC FORM PIES
<br />�r
<br />WALE SP CCI-
<br />0UT17_I� !_/���I�J i�� � 5 �S
<br />,j It _
<br />3C0 Ie ' f� III
<br />N
<br />DIST. CONROUTE SECTION SHEET TOTAL
<br />NO. SHEETS
<br />(IJUNTY RGAD a WiM1S11t►NI;R C, F , 1,,d 1 C, r
<br />E 5585
<br />OE BRIDGE EkG®L ENGENEER—LICENS
<br />7 Turn, yaly. wire r - e, {}�
<br />Each �Ur-n to bz secul Y lj DATE APPROVE- � ■ � F 4 l
<br />onchored wig h onz staple ! �I
<br />Per pile. Fas+en zndz wi+h TO 3- SoI+S
<br />two Cro5b� CIampz, 7�piccai, -- h eon h Wale
<br />0
<br />i
<br />FENDER NOTES
<br />PILES SHALL BE CREOSOTE TREATED D.F. AND ARE TO BE DRIVEN TO A SPECIFIED TIP
<br />ELEVATION OF -55.
<br />THE LENGTH OF PILES TO BE PAID FOR SHALL BE 70' EXCEPT END DOLPHINS WHICH
<br />SHALL BE 72'.
<br />TIMBER SHALL BE CONSTRUCTION GRADE ROUGH D.F. F m 1,500., C = 1,200. ALL
<br />TIMBER SHALL BE CREOSOTE TREATED, EXCEPT CA'T`,,1ALK PLANK TO BE SALT TREATED.
<br />ALL PILE CLUSTERS SHALL BE TIED TOGETHER AT THE TOP WITH 7 TURNS OF 3/41'
<br />GALVANIZED WIRE POPE.
<br />UNLESS OTHERWISE SHOWN OR NOTED, BOLTS ARE 3/4" AND ALL WALES SHALL BE
<br />JOINED AT INTERSECTIONS.
<br />SHEATHING SHALL BE SPIKED TO WALES WITH 10" BOAT SPIKES AT EACH INTERSECTION.
<br />WALES 3- 3" X 12" RANDOM LENGTHS, TO BE CONTINUOUS OVER AT LEAST 3 PILES.
<br />STAGGER SPLICES IN DIFFERENT PILE BAYS. THE MINIMUM LENGTH OF ANY SINGLE LAP
<br />IS TO BE 5' -0" . PROVIDE 1 _3/4" ($1 BOLT EACH SIDE SPLICE APPROXIMATELY 6" FROM
<br />t OF SPLICE.
<br />CATWALK JOIST SHALL BE SPIKED TO PILES WITH 2-30D NAILS AT EACH PILE.
<br />BUTT ENDS OF ALL DIAGONAL SHEATHING TO BE NAILED WITH 60-D NAILS TO VERTICAL
<br />SHEATHING.
<br />ALL HARDWARE TO BE GALVANIZED. ALL FIELD HOLES & CUTS TO BE SWABBED. COVER
<br />TOP OF PILES WITH 24 GAUGE GALVANIZED SPEET METAL. SEE SPECIAL PROVISIONS.
<br />BOLT HOLES SAME SIZE AS BOLTS. BOLTS TO BE FITTED WITH OGEE WASHERS.
<br />SUFFICIENT BLOCKING 12" WIDE AND OF VARYING THICKNESSI" TO 4" SHALL BE
<br />FURNISHED FOR VARIATION OF PILE DIAMETERS.
<br />APPROXIMATE QUANTITIES
<br />STRUCTURE EXCAVATION (TYPE A) 590 C.Y.
<br />STRUCTURE EXCAVATION 12 C.Y.
<br />CLASS "A" CONCRETE (FOOT-ING BLOCK) 520 C.Y.
<br />CLASS "AP1 CONCRETE (2,RiDGE)(1,260 C.Y.) LUMP SUM
<br />BAR REINFORCING STEEL (BRIDGE)(263,000 LBS.) LUMP SUM
<br />FURNISHING TREATED D.F. PILING 5,630 L.F.
<br />DRIVING TIMBER PILES 80
<br />FURNISHING PRESTRESSED CONCRETE PILING 3,160 L.F.
<br />DRIVING PRESTRESSED CONCRETE PILES 46
<br />FURNISHING CONCRETE PILING 3,990 L.F.
<br />DRIVING CONCRETE PILES 90
<br />STRUCTURAL STEEL (194*000 LBS.) LUMP SUM
<br />CLEANING AND PAINTING STRUCTURAL STEEL LUMP SUM
<br />TREATED D.F. TIMBER 23.2 MBM
<br />L I GHTAIE I GHT CONCRETE 98 C.Y.
<br />MISCELLANEOUS IRON AND STEEL 32,200 LBS.
<br />METAL BEAM BRIDGE RAILING 913 L.F.
<br />CONTROL HOUSE LUMP SUM
<br />BRIDGE OPERATING SYSTEM LUMP SUM
<br />14FAVYWE I GHT CONCRETE 170 C.Y.
<br />STATE NO. 29C-022 BRIDGE
<br />33<:�r.?A'.w„r..'n ,:i
<br />BRIDGE DEPARTMENT STATE OF CALIFORNIA
<br />` ` ` DESIGN SECTION ` ` DEPARTMENT OF PUBLIC WORKS
<br />Project Designf DIVISION OF HIGHWAYS
<br />9
<br />Chief Designer
<br />DESIGN ' B7 ��E4:`4�"® �f' Checked\` s. /�i 3 V� tsi"1i `("in.
<br />DETAILS I By �_ Checked
<br />QUANTITIES I By "ram Z 5 jh Checked
<br />SPECIFICATIONS I By - - Plans and specs. I- I—
<br />R S
<br />NDE
<br />Compared
<br />Approval Recommended by___% —_ 5489 I
<br />------------ Civil and Structural r} Q
<br />Enainen o/ Design 1•;ngr. License No.______. 495 __-__ SCALE Jam' i rG' vt BRIDGE L J' ' G C� FILE DRAWING C - � 0 2 3 - 4
<br />PREL. DRAWING No. P- 20