My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
29C-108
PublicWorks
>
ArcGIS Online
>
Bridges
>
29C-108
>
29C-108
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2025 8:49:05 AM
Creation date
5/29/2025 3:52:05 PM
Metadata
Fields
Template:
Supporting Docs - Bridge
Bridge #
29C-108
Type - Bridge Supporting Doc
Plan
Name
Middle River - Bacon Island Road
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DIST COUNTY ROUTE POST MILES SHEET TOTAL <br />TOTAL PROJECT NO. SHEETS <br />10 si 66 105 <br />x <br />K4 <br />x <br />x <br />DESIGN OVERSIGHT <br />Q) <br />Ez- <br />In <br />(�:) SIGN,OFF DATE <br />CO <br />Ln <br />FORM DC-OE-92-PF (REV. 3/88) <br />/3 0 <br />-T- <br />+ + <br />++ 1+ <br />+ + <br />+ 1+ <br />+1 1 + <br />+ Center BearIng Assembly + <br />+1 1+ <br />+1 ++ <br />+ i+ <br />ILI] <br />11111111 It It I I 1� It � k-1111 ... 1" 1 <br />Balance Wheeel Assembly <br />Ir. <br />Rlght Angle <br />Gear Reducer <br />\11 <br />Lu-rit <br />11 1 Q-f� <br />A <br />+ <br />+1 <br />+ I <br />+ I 1z all, <br />+ CD 0 <br />+ <br />ICD 0 0 C-. <br />+ +I <br />+1 <br />C:) 0 0 CD <br />C) 10 <br />C:, <br />........... ........................ <br />-T- <br />Track <br />Center wedge Assembly <br />=— I <br />T <br />)*'**��E R <br />REGISTERED MECHANICAL <br />NOV 1 5 1993 <br />PLANS APPROVAL DATE <br />IMBSEN & ASSOCIATES, INC. <br />9833 Horn Rocd, Sulte C <br />Sccrcmento, Cdffornla 95827 <br />��n�ESSIO,944 <br />ICHARD T. FUL E <br />No. MI 1488 <br />Exp.9/30/95 <br />HAN <br />OF CN <br />Plvot Pler <br />RECORD DRAWW <br />Corrections By— - 1, <br />No 'hang s By_ <br />F)ate <br />Any Peiton Using Thi's Dra,;ing §hou�d <br />All information Bv ir)sn,,7,ctir.r, r�-- 13itp nf Wnrl, <br />ELEVATION <br />V2 M - rom <br />MECHANICAL <br />DESIGN BY CHECKED BRIDGE NO. <br />BY R. FULLER J. M. W I TTE PREPARED FOR THE RICHARD T. FULLER 8 BACON ISLAND ROAD BRIDGE AT MIDDLE RIVER <br />DETAILS CHECKED 29C- 10 <br />B. MAECHLER R. FULLER COUNTY OF SAN JOAQUIN PROJECT ENGINEER POST MILE <br />QUANTITIES BY CHECKED <br />R. FULLER J. M. W I TTE DEPARTMENT OF PUBLIC WORKS PIVOT PIER ELEVAT ION <br />ORIGINAL SCALE IN INCHES CU DISREGARD PRINTS BEARING REVISION DATES (PRELIMINARY STAGE ONLY) SHEET OF <br />FOR REDUCED PLANS 0 2 3 EA EARLIER REVISION DATES 03�;,4 06,�T 06 �)l 10 - 22 M3 M13 <br />-93 <br />ctrnech.bdr <br />
The URL can be used to link to this page
Your browser does not support the video tag.