My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
29C-108
PublicWorks
>
ArcGIS Online
>
Bridges
>
29C-108
>
29C-108
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2025 8:49:05 AM
Creation date
5/29/2025 3:52:05 PM
Metadata
Fields
Template:
Supporting Docs - Bridge
Bridge #
29C-108
Type - Bridge Supporting Doc
Plan
Name
Middle River - Bacon Island Road
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
x <br />x <br />END LATCH <br />4" Bore x 18" Stroke <br />r�� <br />C, <br />1.5 <br />C DESIGN OVERSIGHT <br />U <br />SIGN OFF DATE <br />Q) I <br />Ln <br />0 <br />00 <br />Ln FORM DC-OE-92-PF (REV. 3/88) <br />01 <br />f � 9 -co (S-\ r--- <br />r3 <br />E <br />x <br />0-11� k1-100 <br />"W� <br />46 it 10 <br />DESIGN BY R. FULLER <br />DETAILS BY B. MAECHLER <br />QUANTITIES BY R. FULLER <br />Hydraulic Cabinet <br />CHECKED <br />J. M. W I TTE <br />CHECKED <br />R.FULLER <br />CHECKED <br />J. M. W I TTE <br />ORIGINAL SCALE IN INCHES <br />FOR REDUCED PLANS <br />q-� <br />ILI <br />All Hydraulic lines <br />All Hydraulic hoses <br />L -1 <br />Hydraulic pump unit <br />reservoir mounted <br />01.� <br />Per/,-tj1;13 074o +Jrawh 10 <br />Tahl,* pwre r.�Oplaced <br />ta/�� 116dla-ull� hilses <br />Par <br />PREPARED FOR THE RICHARD T. FULLER <br />COUNTY OF SAN JOAQUIN PROJECT ENGINEER <br />DEPARTMENT OF PUBLIC WORKS <br />I I I I I I I CU <br />0 1 2 3 EA <br />DIST COUNTY ROUTE POST MILES <br />TOTAL PROJECT <br />10 si <br />REGISTERED VECHANICAL'�I� <br />Sov 11 5 1993 <br />PLANS APPROVAL DATE <br />IMBSEN & ASSOCIATHS, INC. <br />9833 Horn Rocd, Sulte C <br />Scercmento, CcIffornIc 95827 <br />END SUPPORT CYLINDERS <br />2" Bore x 21" Stroke <br />SHEET <br />TOTAL <br />NO. <br />SHEETS <br />76 <br />105 <br />�WESS/OA/4� <br />ICHARD T. FULLE <br />No. M 11488 <br />Exp. 9/30/95 <br />HAN <br />OF CN <br />RECOR 1,1fA !, I -0� <br />TJ�Q <br />n JR <br />Corrections By <br />No Chances B-- <br />Date <br />— an <br />Any Perso in??bhis <br />Vaaflfv <br />Aft information By I ; <br />END JACK CYLINDERS <br />8' Bore x 8' Stroke <br />LEGEND <br />Hydraulic tubing <br />H�draullc hose <br />Reservoir return <br />Hydraulic filter <br />Pressure relief valve <br />a <br />[�- X I 1 4 way, 3 position solenoid <br />operated spring return <br />T T dlrectlonGI control valve. <br />VVV <br />oil Filter <br />Adjustable pressure compensated <br />variable flow control valve. <br />L <br />MECHANICAL <br />BRIDGE NO. <br />29C- o8 BACON ISLAND ROAD BRIDGE AT MIDDLE RIVER <br />POST MILE <br />HYDRAULIC SCHEMATIC <br />DISREGARD PRINTS BEARING REVISION DATES (PRELIMINARY STAGE ONLY) SHEET 01 <br />>. % -221 <br />,2 <br />EARLIER REVISION DATES <br />-93 M13 M13 <br />ctmech.bdr <br />
The URL can be used to link to this page
Your browser does not support the video tag.