My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-29C-114
PublicWorks
>
ArcGIS Online
>
Bridges
>
29C-114
>
2024-29C-114
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2025 8:25:39 AM
Creation date
5/30/2025 8:25:19 AM
Metadata
Fields
Template:
Supporting Docs - Bridge
Bridge #
29C-114
Type - Bridge Supporting Doc
Inspection
Name
Bishop Canal - Eight Mile Road
Text box
ID:
1
Creator:
Created:
5/30/2025 8:25 AM
Modified:
5/30/2025 8:25 AM
Text:
http://smi-prod.dot.ca.gov/biris/photos/DBONAR/2024_05_06_19-01-40_IMG_0687.JPG
ID:
2
Creator:
Created:
5/30/2025 8:25 AM
Modified:
5/30/2025 8:25 AM
Text:
http://smi-prod.dot.ca.gov/biris/photos/DBONAR/2024_05_06_19-01-39_IMG_0686.JPG
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Printed on:Tuesday 05/28/2024 04:01 PM 29C0114/AAAX/128904Pageof7 <br />Department of Transportation - Division of Maintenance Structure Maintenance & Investigations <br />12 <br />Photo 6 <br />Gabion baskets in front of Abutment 1 <br />Photo 7 <br />Gabion basket and undermining along the left wingwall of <br />Abutment 1 <br />SUBSTRUCTURE PHOTOGRAPHS <br />225 <br />227 <br />256 <br />Pile-Steel <br />Corrosion <br />Pile-RC <br />Slope Protection <br />Settlement <br />2 <br />2 <br />2 <br />2 <br />2 <br />10 <br />10 <br />63 <br />2 <br />2 <br />ea. <br />each <br />ea. <br />ea. <br />each <br /> 0 <br /> 0 <br /> 63 <br /> 0 <br /> 0 <br /> 10 <br /> 10 <br /> 0 <br /> 2 <br /> 2 <br /> 0 <br /> 0 <br /> 0 <br /> 0 <br /> 0 <br />SUBSTRUCTURE ELEMENT INSPECTION RATINGS AND NOTES <br /> 0 <br /> 0 <br /> 0 <br /> 0 <br /> 0 <br />1000 <br />4000 <br />SUBSTRUCTURE <br />SUBSTRUCTURE RATING =(60)7 <br />(220) Pile Cap/Footing-RC <br />(225-1000) Corrosion <br />(227) Pile-RC <br />(256-4000) Settlement <br />Element DescriptionElem <br />No. <br />Env Total <br />Qty <br />Units <br />CS 1 CS 2 CS 3 CS 4 <br />Qty in each Condition StateDefect/ <br />Prot Defect <br />Routine (current): <br />There is surface rust on all the CISS shells. <br />Routine (current): <br />A gabion slope protection system has been installed along the full length of both abutments. The gabion mattresses have settled and <br />pulled away from the abutments. Settlement of the gabion mattresses appears to have resulted from minor undercutting along the <br />riverbank. <br />UWI (05-08-2018): No conditions were noted that would change the ABME's assessment of this element. <br />Non-Routine Inspection Element Notes: <br />Non-Routine Inspection Element Notes: <br />UWI (05-05-2023): This element represents the 33 foot wide pile cap of the swing pier 7. There were no significant defects noted in <br />the submerged portion or the portion visible from the water. <br />UWI (05/05/2023): The piles consist of steel shells filled with RC at Bents 2-10. Reinforcing extends to an elevation of approximately <br />17 feet below the pile/column splice. Based on the current location of the pile/column splice, the reinforcing ends at a minimum of <br />approximately 7 feet below the mudline. The piles carry the same reinforcing as the columns and it is assumed that the steel shells <br />are not relied on for capacity. No defects were noted and all piles (63 each) will remain in Condition State 1.
The URL can be used to link to this page
Your browser does not support the video tag.