My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-29C-117
PublicWorks
>
ArcGIS Online
>
Bridges
>
29C-117
>
2023-29C-117
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2025 9:14:19 AM
Creation date
5/30/2025 9:14:09 AM
Metadata
Fields
Template:
Supporting Docs - Bridge
Bridge #
29C-117
Type - Bridge Supporting Doc
Inspection
Name
South Littlejohns Creek - Van Allen Road
Text box
ID:
1
Creator:
Created:
5/30/2025 9:14 AM
Modified:
5/30/2025 9:14 AM
Text:
http://smi-prod.dot.ca.gov/biris/photos/PGAGNIER/2023_07_24_15-49-08_29C0115_MAP_VIEW_RESIZE.JPG
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Printed on:Tuesday 08/22/2023 09:16 AM 29C0115/AAAJ/111943Pageof66 <br />Department of Transportation - Division of Maintenance Structure Maintenance & Investigations <br />OTHER WORK RECOMMENDATIONS - NONE <br />JOINT/APPR/RAIL WORK RECOMMENDATIONS - NONE <br />SUPERSTRUCTURE WORK RECOMMENDATIONS - NONE <br />SUBSTRUCTURE WORK RECOMMENDATIONS - NONE <br />Photo 1 <br />Map View <br />OTHER PHOTOGRAPHS <br />DECK WORK RECOMMENDATIONS - NONE <br />256 Slope Protection 2 2 ea. 2 0 0 <br />SUBSTRUCTURE ELEMENT INSPECTION RATINGS AND NOTES <br /> 0 <br />SUBSTRUCTURE <br />SUBSTRUCTURE RATING =(60)7 <br />WORK RECOMMENDATIONS <br />(252-6000) Scour <br />(256) Slope Protection <br />Element DescriptionElem <br />No. <br />Env Total <br />Qty <br />Units <br />CS 1 CS 2 CS 3 CS 4 <br />Qty in each Condition StateDefect/ <br />Prot Defect <br />(See Photo 17 dated 03/19/2019). This condition could not be confirmed during this investigation due to high water levels. <br />Element 256 has been included to account for the gabion mattresses and RSP on the embankments under Spans 1 and 3. <br />*Prior to the 1984 inspection, gabion mattresses were placed on the embankments. Deterioration of the mattresses in Span 1 was <br />noted shortly after placement. <br />*Prior to this inspection additional countermeasures were placed. RSP and concrete grout were placed on the embankment under <br />Span 1 and about Pier 2. The gabion mattresses were not visible and may have been removed. RSP was placed about the gabion <br />mattresses under Span 3 and about Pier 3. <br />No significant defects were observed.
The URL can be used to link to this page
Your browser does not support the video tag.