Laserfiche WebLink
Printed on:Tuesday 08/22/2023 09:16 AM 29C0115/AAAJ/111943Pageof5 <br />Department of Transportation - Division of Maintenance Structure Maintenance & Investigations <br />6 <br />DESCRIPTION UNDER STRUCTURE <br />CHANNEL DESCRIPTION <br />Sinuous creek situated in a wide floodplain with lightly vegetated slopes (grass). The bed is comprised of silt and gravel. <br />TYPE OF SERVICE UNDER <br />N NOT APPLICABLE (NBI)UNDERCLEARANCES V - H <br />8 EQUAL DESIRABLEWATER ADEQUACY <br /> MVERT-LIFT BRIDGE NAV MIN VERTICAL CLEAR <br />NAVIGATION CONTROL <br />0.0 MNAVIGATION HORIZONTAL CLEARANCE <br />0.0 MNAVIGATION VERTICAL CLEARANCE <br />PIER PROTECTION <br />0: NO CONTROL5-WATERWAY <br />5 STABLE W/IN FOOTING OR PILESCOUR <br />N/ASCOUR POA DATE <br />CHANNEL PROTECTION 8 PROTECTED <br />N/A <br />(42b) <br />(69) <br />(71) <br />(61) <br />(113) <br />(38) <br />(111) <br />(39) <br />(116) <br />(40) <br />SUPERSTRUCTURE ELEMENT INSPECTION RATINGS AND NOTES - NONE <br />205 <br />215 <br />252 <br />Column-RC <br />Abutment-RC <br />Pile-CIDH <br />Scour <br />2 <br />2 <br />2 <br />2 <br />8 <br />33 <br />2 <br />2 <br />each <br />m <br />ea. <br />each <br /> 8 <br /> 33 <br /> 0 <br /> 0 <br /> 0 <br /> 0 <br /> 2 <br /> 2 <br /> 0 <br /> 0 <br /> 0 <br /> 0 <br />SUBSTRUCTURE ELEMENT INSPECTION RATINGS AND NOTES <br /> 0 <br /> 0 <br /> 0 <br /> 06000 <br />SUPERSTRUCTURE <br />SUBSTRUCTURE <br />SUPERSTRUCTURE RATING =(59) 7 <br />SUBSTRUCTURE RATING =(60)7 <br />(205) Column-RC <br />(215) Abutment-RC <br />(252) Pile-CIDH <br />(252-6000) Scour <br />Element DescriptionElem <br />No. <br />Env Total <br />Qty <br />Units <br />CS 1 CS 2 CS 3 CS 4 <br />Qty in each Condition StateDefect/ <br />Prot Defect <br />There were no significant defects noted. <br />There were no significant defects noted. <br />Pile exposure has been noted since the 1990 inspection. The exposure appeared to have fluctuated due to the attempts to mitigate <br />scour of the embankments. <br />During the last inspection, two CIDH RC piles were exposed at Pier 2. When measured on the Span 2 side of the pier and from the <br />top of the expanded section to the ground, the exposure was as follows: <br />*Pile Extension 1 - 9 inches <br />*Pile Extension 2 - 28 inches <br />JOINT - APPROACH - RAIL <br />Photo 2 <br />Condition of the AC approach at Abutment 1 <br />Photo 3 <br />Condition of the AC approach at Abutment 4 <br />JOINT/APPROACH/RAIL PHOTOGRAPHS