My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-29C-163
PublicWorks
>
ArcGIS Online
>
Bridges
>
29C-163
>
2023-29C-163
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2025 2:55:27 PM
Creation date
5/30/2025 2:55:20 PM
Metadata
Fields
Template:
Supporting Docs - Bridge
Bridge #
29C-163
Type - Bridge Supporting Doc
Inspection
Name
Mormon Slough - Jack Tone Road
Text box
ID:
1
Creator:
Created:
5/30/2025 2:55 PM
Modified:
5/30/2025 2:55 PM
Text:
http://smi-prod.dot.ca.gov/biris/photos/PGAGNIER/2023_03_23_11-20-06_IMG_5590_RESIZE.JPG
ID:
2
Creator:
Created:
5/30/2025 2:55 PM
Modified:
5/30/2025 2:55 PM
Text:
http://smi-prod.dot.ca.gov/biris/photos/PGAGNIER/2023_03_23_11-21-01_IMG_5593_RESIZE.JPG
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Printed on:Monday 07/31/2023 04:05 PM 29C0163/AAAO/111942Pageof5 <br />Department of Transportation - Division of Maintenance Structure Maintenance & Investigations <br />7 <br />DESCRIPTION UNDER STRUCTURE <br />Photo 3 <br />Typical worn areas in the AC overlay. Southbound Span 2 <br />shown <br /> DECK PHOTOGRAPHS <br />SUPERSTRUCTURE ELEMENT INSPECTION RATINGS AND NOTES - NONE <br />SUPERSTRUCTURE <br />SUBSTRUCTURE <br />SUPERSTRUCTURE RATING =(59) 7 <br />DECK ELEMENT INSPECTION RATINGS AND NOTES (58) 7DECK RATING = <br />(36a) Rail Code 0000 <br />330 Railing-Metal 2 84 m 84 0 0 0 <br />JOINT/APPROACH/RAIL ELEMENT INSPECTION RATINGS AND NOTES <br />RAIL INFORMATION <br />(36b) Transition (36c) Appr Guardrail (36d) Appr Guardrail End 55Roadway Speed MPH <br />JOINT - APPROACH - RAIL <br />(330) Railing-Metal <br />Element DescriptionElem <br />No. <br />Env Total <br />Qty <br />Units <br />CS 1 CS 2 CS 3 CS 4 <br />Qty in each Condition StateDefect/ <br />Prot Defect <br />The bridge rails are galvanized. <br />There were no significant defects noted. <br />Photo 2 <br />Typical condition of the AC approaches. Abutment 1 shown. <br />Note pothole in the NB lane <br />JOINT/APPROACH/RAIL PHOTOGRAPHS
The URL can be used to link to this page
Your browser does not support the video tag.