Laserfiche WebLink
Printed on:Wednesday 11/29/2023 01:00 PM 29C0219/AABF/113489Pageof6 <br />Department of Transportation - Division of Maintenance Structure Maintenance & Investigations <br />7 <br />606 <br />610 <br />613 <br />616 <br />617 <br />Control System - Mechanical <br />Pier Protection - Structural <br />Decay/Section Loss (Timber) <br />Traffic Control Sys - Mechanical <br />Movable Bridge House - Elect <br />Movable Bridge House - Struc <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />1 <br />1 <br />1 <br />2 <br />1 <br />1 <br />ea. <br />ea. <br />each <br />ea. <br />ea. <br />ea. <br /> 1 <br /> 0 <br /> 0 <br /> 2 <br /> 1 <br /> 1 <br /> 0 <br /> 1 <br /> 1 <br /> 0 <br /> 0 <br /> 0 <br /> 0 <br /> 0 <br /> 0 <br /> 0 <br /> 0 <br /> 0 <br /> 0 <br /> 0 <br /> 0 <br /> 0 <br /> 0 <br /> 0 <br />MECHANICAL/ELECTRICAL ELEMENT INSPECTION RATINGS AND NOTES <br />1140 <br />MECHANICAL/ELECTRICAL <br />(604-9002) Wear(Electrical) <br />(606) Control System - Mechanical <br />(610) Pier Protection - Structural <br />(610-1140) Decay/Section Loss (Timber) <br />(613) Traffic Control Sys - Mechanical <br />(616) Movable Bridge House - Elect <br />(617) Movable Bridge House - Struc <br />Element DescriptionElem <br />No. <br />Env Total <br />Qty <br />Units <br />CS 1 CS 2 CS 3 CS 4 <br />Qty in each Condition StateDefect/ <br />Prot Defect <br />Non-Routine Inspection Element Notes: <br />Non-Routine Inspection Element Notes: <br />Non-Routine Inspection Element Notes: <br />Non-Routine Inspection Element Notes: <br />Non-Routine Inspection Element Notes: <br />Non-Routine Inspection Element Notes: <br />The engine is original from the 1930's and has exceeded its operational life and should be rebuilt. The clutch engagement coupling <br />jaws are worn. The transmission should be rebuilt. All the drive machinery bearings have excessive clearances from wear. <br />**Update (05/10/23) Condition still present. <br />(05/10/23) All of the open gearing needs to be cleaned and regreased. <br />Mech/Elect (06/03/2021) The bridge has no control system other than the operator. Lever actuated limit switches give indicating lights <br />in the control room only. <br />Mech/Elect (06/03/2021) The pier protection consists of a timber dolphin upstream and downstream of the swing pier (Pier 7). There <br />are also remnants of fenders at Piers 6 & 8. <br />(06/03/2021) The dolphins appear in fair condition and there was no drift accumulating at the dolphins or the piers. The exposed tops <br />of the timber piles are deteriorated and several have vegetation growing from the top or large checks in the piles. <br />Mech/Elect (06/03/2021) The bridge has a single unpowered traffic gate at each end of the fixed spans that must be manually <br />operated by the operator before a bridge opening. <br />Mech/Elect (06/03/2021) The bridge house is a steel frame building with metal siding located on the south side of Pier 7. <br />(06/03/2021) The bridge house is a steel frame building with metal siding located on the south side of Pier 7. The bridge house was <br />in fair condition and no significant defects were noted. The paint system on the bridge house is faded but still effective.