Printed on:Tuesday 02/25/2025 03:21 PM 29C0227/AAAT/148024Pageof3 <br />Department of Transportation - Division of Maintenance Structure Maintenance & Investigations <br />9 <br />UNDERWATER INVESTIGATION DETAILS - NOT APPLICABLE FOR THIS BRIDGE. <br />STEEL INVESTIGATION DETAILS <br />SCOPE AND ACCESS <br />All elements were accessible by foot on and around the structure. There was 6 inches of water in the creek below Span 3 during this <br />investigation. No elements were submerged. All visible elements were fully inspected. A complete hands on routine inspection of the <br />visible elements was performed with the aid of a drill and awl. <br />HISTORY <br />After the load rating review under work request number 12080 it was determined the bridge required a load posting based on the <br />deterioration of Girder 17 in Span 2 and the change of AC from 4 inches to 5 inches. A record of critical finding was written on <br />02/27/2024, the County of San Joaquin was notified and posted the bridge per the critical finding. On 04/01/2024, San Joaquin county <br />completed repairs by supplementing Girder 17 and replacing Girder 18 in Span 2. (See Photos 1 and 2 dated 04/05/2024). The temporary <br />load posting/restriction signs have been removed from the bridge. <br />SUBSTRUCTURE <br />The previously report debris build-up against Column 3 Bent 3 have either washed away or were removed. See Photo 1. <br />SAFE LOAD CAPACITY <br />A Load Rating Summary Sheet dated 04/08/2024 is on file for this structure. While this report does not include a check of that analysis, it <br />does verify that the structural conditions observed during this inspection are consistent with those assumed in that analysis. The current <br />rating is based on BrR 7.4.0 dated 04/08/2024. <br />WATERWAY <br />NBI Item #113 is coded as "3 - Scour Critical". There is a Scour Plan of Action dated 11/04/2005 on file. The plan calls for regular <br />monitoring by San Joaquin County annually and after high flow events. <br />The channel cross section was measured during this inspection and there was no significant change in the elevations when compared to <br />the channel cross section taken on 11/08/2018. It is noted that the channel cross section was measured on the right side during this <br />investigation to replace the channel cross section measured on the left side in 2018. <br />INSPECTION COMMENTARY <br />- NOT APPLICABLE FOR THIS BRIDGE. <br />CONDITION INFORMATION <br />SPECIAL INSPECTION INFORMATION