My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-29C-227
PublicWorks
>
ArcGIS Online
>
Bridges
>
29C-227
>
2024-29C-227
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2025 3:20:26 PM
Creation date
6/2/2025 3:20:10 PM
Metadata
Fields
Template:
Supporting Docs - Bridge
Bridge #
29C-227
Type - Bridge Supporting Doc
Inspection
Name
Duck Creek - Buckman Road
Text box
ID:
1
Creator:
Created:
6/2/2025 3:20 PM
Modified:
6/2/2025 3:20 PM
Text:
http://smi-prod.dot.ca.gov/biris/photos/PGAGNIER/2024_11_08_12-47-20_IMG_6920_RESIZE.JPG
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Printed on:Tuesday 02/25/2025 03:21 PM 29C0227/AAAT/148024Pageof99 <br />Department of Transportation - Division of Maintenance Structure Maintenance & Investigations <br />UpstreamSide 11/08/2024X-Section Date <br />Top of Timber Deck, RightMeasured From <br /> 1.95 <br /> 2.00 <br /> 2.30 <br /> 2.60 <br /> 2.70 <br /> 2.65 <br /> 1.90 <br />Vert(m) <br />Top of Slope <br />EOW <br />EOW <br />Abutment 1 <br />Bent 2 <br />Bent 3 <br />Abutment 4 <br />Location <br />CHANNEL X-SECTION <br />CommentsHoriz(m) <br /> 0.00 <br /> 5.40 <br /> 7.80 <br /> 9.05 <br /> 10.55 <br /> 12.40 <br /> 15.85 <br />OTHER WORK RECOMMENDATIONS - NONE <br />Photo 1 <br />No debris build-up on Column 3 at Bent 3 <br />SUBSTRUCTURE PHOTOGRAPHS <br />JOINT/APPR/RAIL WORK RECOMMENDATIONS - NONE <br />SUPERSTRUCTURE WORK RECOMMENDATIONS <br />SUBSTRUCTURE WORK RECOMMENDATIONS <br />Work By <br />Work By <br />Action <br />Action <br />Est Cost <br />Est Cost <br />Rec Date <br />Rec Date <br />LOCAL AGENCY <br />LOCAL AGENCY <br />Sub-Remove Debris <br />Sub-Rehab <br />11/10/2022 <br />11/08/2018 <br />Str Target <br />Str Target <br />ROUTINE <br />ROUTINE <br />Remove debris and discarded tree clippings in the scour critical stream bed. <br />Replace the columns throughout the structure. During that operation, replace the bent caps at both bents. New bent caps <br />should allow for inspection access. <br />Dist Target <br />Dist Target <br />EA <br />EA <br />Status <br />Status <br />PROPOSED <br />PROPOSED <br />Work By <br />Action <br />Est Cost Rec Date LOCAL AGENCY <br />Super-Replace <br />11/10/2022 <br />Str Target ROUTINE <br />In Span 1 replace Girders 2, 3, 4, 6, 11, 13 and 17. In Span 2 replace Girder 11. In Span 3 replace Girder 2. <br />Dist Target <br />EA Status PROPOSED <br />DECK WORK RECOMMENDATIONS <br />Work By <br />Action <br />Est Cost Rec Date LOCAL AGENCY <br />Deck-Replace <br />11/29/2021 <br />Str Target ROUTINE <br />Replace the timber bridge deck. <br />Dist Target <br />EA Status PROPOSED <br />SUBSTRUCTURE <br />WORK RECOMMENDATIONS
The URL can be used to link to this page
Your browser does not support the video tag.