Laserfiche WebLink
Printed on:Monday 08/16/2021 06:27 PM 29C0255/AAAJ/70819Pageof66 <br />Department of Transportation - Division of Maintenance Structure Maintenance & Investigations <br />OTHER WORK RECOMMENDATIONS - NONE <br />Photo 4 <br />Vegetation growth at the right wingwall at Abutment 1 <br />SUBSTRUCTURE PHOTOGRAPHS <br />JOINT/APPR/RAIL WORK RECOMMENDATIONS <br />SUPERSTRUCTURE WORK RECOMMENDATIONS - NONE <br />SUBSTRUCTURE WORK RECOMMENDATIONS - NONE <br />Work By <br />Work By <br />Action <br />Action <br />Est Cost <br />Est Cost <br />Rec Date <br />Rec Date <br />LOCAL AGENCY <br />LOCAL AGENCY <br />Railing-Repair <br />Appr. Roadway-Repair <br />02/05/2015 <br />03/01/2011 <br />Str Target <br />Str Target <br />2 YEARS <br />2 YEARS <br />Repair/replace the rail terminations at the left side of Abutment 1 and both sides of Abutment 3. <br />Repave/repair the AC approaches at Abutment 3. <br />Clean and seal the cracks and gaps in the AC approaches at both ends of the bridge. <br />Dist Target <br />Dist Target <br />EA <br />EA <br />Status <br />Status <br />PROPOSED <br />PROPOSED <br />Photo 1 <br />North is at the top of the page <br />OTHER PHOTOGRAPHS <br />DECK WORK RECOMMENDATIONS - NONE <br />SUBSTRUCTURE <br />WORK RECOMMENDATIONS