Laserfiche WebLink
Printed on:Wednesday 04/30/2025 02:19 PM 29C0272/AAAP/151732Pageof99 <br />Department of Transportation - Division of Maintenance Structure Maintenance & Investigations <br />OTHER WORK RECOMMENDATIONS - NONE <br />JOINT/APPR/RAIL WORK RECOMMENDATIONS <br />SUPERSTRUCTURE WORK RECOMMENDATIONS <br />SUBSTRUCTURE WORK RECOMMENDATIONS <br />Work By <br />Action <br />Est CostRec Date LOCAL AGENCY <br />Sub-Replace <br />02/17/2021 <br />Str Target ROUTINE <br />Replace the timber caps. <br />Dist Target <br />EA Status PROPOSED <br />Work By <br />Work By <br />Action <br />Action <br />Est Cost <br />Est Cost <br />Rec Date <br />Rec Date <br />LOCAL AGENCY <br />LOCAL AGENCY <br />Rail-Repair <br />Rail-Repair <br />02/07/2023 <br />02/17/2021 <br />Str Target <br />Str Target <br />ROUTINE <br />ROUTINE <br />Replace the damaged metal beam guard rail and 4th post (from Abutment 1) in Span 1 on the left. <br />Replace the rail 2nd and 3rd rail post from Abutment 1 on the right and replace the spacer block at the 2nd rail from Abutment 1 on the <br />left. <br />Dist Target <br />Dist Target <br />EA <br />EA <br />Status <br />Status <br />PROPOSED <br />PROPOSED <br />Work By <br />Action <br />Est Cost Rec Date LOCAL AGENCY <br />Super-Replace <br />05/01/2011 <br />Str Target ROUTINE <br />Replace the exterior girders on the right side of the structure. <br />Dist Target <br />EA Status PROPOSED <br />DECK WORK RECOMMENDATIONS - NONE <br />WORK RECOMMENDATIONS