Laserfiche WebLink
Printed on:Thursday 02/27/2025 11:46 AM 29C0307/AAAU/148025Pageof88 <br />Department of Transportation - Division of Maintenance Structure Maintenance & Investigations <br />UpstreamSide 11/08/2024X-Section Date <br />Top of Timber Deck (Right)Measured From <br /> 2.10 <br /> 3.70 <br /> 3.85 <br /> 3.55 <br /> 2.30 <br />Vert(m) <br />Face of Abutment <br />Face of Abutment <br />Abutment 1 <br />Bent 2 <br />Thalweg <br />Bent 3 <br />Abutment 4 <br />Location <br />CHANNEL X-SECTION <br />CommentsHoriz(m) <br /> 0.00 <br /> 4.00 <br /> 4.55 <br /> 8.25 <br /> 12.20 <br />OTHER WORK RECOMMENDATIONS - NONE <br />JOINT/APPR/RAIL WORK RECOMMENDATIONS - NONE <br />SUPERSTRUCTURE WORK RECOMMENDATIONS - NONE <br />SUBSTRUCTURE WORK RECOMMENDATIONS <br />Work By <br />Action <br />Est CostRec Date LOCAL AGENCY <br />Sub-Rehab <br />11/20/2019 <br />Str Target ROUTINE <br />Replace the decaying columns in the substructure. <br />Dist Target <br />EA Status PROPOSED <br />DECK WORK RECOMMENDATIONS <br />Work By <br />Action <br />Est Cost Rec Date LOCAL AGENCY <br />Deck-Replace <br />11/08/2024 <br />Str Target ROUTINE <br />Replace the rotten deck timbers in Span 2. <br />Dist Target <br />EA Status PROPOSED <br />WORK RECOMMENDATIONS