Laserfiche WebLink
Printed on:Friday 12/13/2024 02:52 PM 29C0314/AAAW/147520Pageof77 <br />Department of Transportation - Division of Maintenance Structure Maintenance & Investigations <br />OTHER WORK RECOMMENDATIONS - NONE <br />Photo 5 <br />Typical bulging of the timber lagging at both abutments. <br />Abutment 1 shown <br />Photo 6 <br />Typical condition of the timber lagging at both abutments. <br />Abutment 5 shown <br />SUBSTRUCTURE PHOTOGRAPHS <br />JOINT/APPR/RAIL WORK RECOMMENDATIONS - NONE <br />SUPERSTRUCTURE WORK RECOMMENDATIONS - NONE <br />SUBSTRUCTURE WORK RECOMMENDATIONS <br />Work By <br />Work By <br />Action <br />Action <br />Est Cost <br />Est Cost <br />Rec Date <br />Rec Date <br />LOCAL AGENCY <br />LOCAL AGENCY <br />Sub-Rehab <br />Sub-Rehab <br />08/05/2020 <br />03/30/1998 <br />Str Target <br />Str Target <br />ROUTINE <br />ROUTINE <br />Make appropriate repair to restore the connection of the lower cross bracing at Bent 4. <br />Replace the damaged horizontal timber lagging at Abutments 1 and 5. In addition, backfill the material behind the timber <br />lagging. <br />Dist Target <br />Dist Target <br />EA <br />EA <br />Status <br />Status <br />PROPOSED <br />PROPOSED <br />DECK WORK RECOMMENDATIONS - NONE <br />SUBSTRUCTURE <br />WORK RECOMMENDATIONS