Laserfiche WebLink
Printed on:Monday 10/14/2024 01:06 PM 29C0320/AAAM/136930Pageof55 <br />Department of Transportation - Division of Maintenance Structure Maintenance & Investigations <br />OTHER WORK RECOMMENDATIONS - NONE <br />JOINT/APPR/RAIL WORK RECOMMENDATIONS - NONE <br />SUPERSTRUCTURE WORK RECOMMENDATIONS - NONE <br />SUBSTRUCTURE WORK RECOMMENDATIONS - NONE <br />DECK WORK RECOMMENDATIONS <br />Work By <br />Work By <br />Action <br />Action <br />Est Cost <br />Est Cost <br />Rec Date <br />Rec Date <br />LOCAL AGENCY <br />LOCAL AGENCY <br />Deck-Methacrylate <br />Deck-Misc <br />06/08/2022 <br />06/14/2016 <br />Str Target <br />Str Target <br />ROUTINE <br />ROUTINE <br />Treat the deck with methacrylate. <br />Repave both AC approaches to eliminate the heaving and the gap between the approach and the deck. <br />Dist Target <br />Dist Target <br />EA <br />EA <br />Status <br />Status <br />PROPOSED <br />PROPOSED <br />225 Pile-Steel 2 1 ea. 1 0 0 <br />SUBSTRUCTURE ELEMENT INSPECTION RATINGS AND NOTES <br /> 0 <br />SUBSTRUCTURE <br />SUBSTRUCTURE RATING =(60)7 <br />WORK RECOMMENDATIONS <br />(215) Abutment-RC <br />(225) Pile-Steel <br />Element DescriptionElem <br />No. <br />Env Total <br />Qty <br />Units <br />CS 1 CS 2 CS 3 CS 4 <br />Qty in each Condition StateDefect/ <br />Prot Defect <br />The quantity shown here includes the monolithic RC wingwalls at each abutment. <br />The pile element is included to indicate the presence of piles on this structure. The piles were not exposed for visual inspection. No <br />indication of pile distress was noted in any substructure element.