My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-29C-393
PublicWorks
>
ArcGIS Online
>
Bridges
>
29C-393
>
2024-29C-393
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2025 3:16:19 PM
Creation date
6/3/2025 3:16:08 PM
Metadata
Fields
Template:
Supporting Docs - Bridge
Bridge #
29C-393
Type - Bridge Supporting Doc
Inspection
Name
Dry Creek - Lincoln Way
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Printed on:Monday 10/14/2024 12:40 PM 29C0393/AAAS/136929Pageof88 <br />Department of Transportation - Division of Maintenance Structure Maintenance & Investigations <br />OTHER WORK RECOMMENDATIONS <br />JOINT/APPR/RAIL WORK RECOMMENDATIONS - NONE <br />SUPERSTRUCTURE WORK RECOMMENDATIONS - NONE <br />SUBSTRUCTURE WORK RECOMMENDATIONS <br />Work By <br />Work By <br />Action <br />Action <br />Est Cost <br />Est Cost <br />Rec Date <br />Rec Date <br />LOCAL AGENCY <br />LOCAL AGENCY <br />Sub-Fix Scour Critic <br />Sub-Remove Debris <br />08/21/2018 <br />06/26/2018 <br />Str Target <br />Str Target <br />ROUTINE <br />ROUTINE <br />Mitigate the scour vulnerability of the bridge foundations. The local agency should investigate and provide adequate <br />scour mitigation in accordance with federal standards. Refer to the current version of FHWA HEC-23 ("Bridge Scour <br />and Stream Instability Countermeasures: Experience, Selection and Design Guidance") for a full description of the <br />requirements for countermeasure methods and design specifications meeting federal standards. <br />Remove the channel debris build up at Bents 23-25. <br />Dist Target <br />Dist Target <br />EA <br />EA <br />Status <br />Status <br />PROPOSED <br />PROPOSED <br />Work By <br />Action <br />Est Cost Rec Date LOCAL AGENCY <br />Remove Vegetation <br />06/26/2018 <br />Str Target ROUTINE <br />Trim back or remove the vegetation growing over the left bridge rail. <br />Dist Target <br />EA Status PROPOSED <br />DECK WORK RECOMMENDATIONS <br />Work By <br />Action <br />Est Cost Rec Date LOCAL AGENCY <br />Deck-Place Overlay <br />06/09/2022 <br />Str Target ROUTINE <br />Remove the remaining chip seal and place polyester concrete on the deck. <br />Dist Target <br />EA Status PROPOSED <br />WORK RECOMMENDATIONS
The URL can be used to link to this page
Your browser does not support the video tag.