Laserfiche WebLink
Printed on:Wednesday 05/07/2025 08:05 AM 29C0022/AABH/152630Pageof17 <br />Department of Transportation - Division of Maintenance Structure Maintenance & Investigations <br />19 <br />OTHER WORK RECOMMENDATIONS <br />JOINT/APPR/RAIL WORK RECOMMENDATIONS <br />SUPERSTRUCTURE WORK RECOMMENDATIONS <br />SUBSTRUCTURE WORK RECOMMENDATIONS <br />Work By <br />Work By <br />Work By <br />Action <br />Action <br />Action <br />Est Cost <br />Est Cost <br />Est Cost <br />Rec Date <br />Rec Date <br />Rec Date <br />LOCAL AGENCY <br />LOCAL AGENCY <br />LOCAL AGENCY <br />Sub-Nav Protect <br />Sub-Remove Debris <br />Sub-Patch spalls <br />11/16/2015 <br />11/03/2010 <br />11/03/2010 <br />Str Target <br />Str Target <br />Str Target <br />ROUTINE <br />ROUTINE <br />ROUTINE <br />Replace the missing timber skirt at Pier 11. One timber was missing. <br />Remove the logs and other debris from the upstream side of Span 10 and adjacent supports. <br />The voids in the area of unconsolidated concrete on the Span 10 side of Pier 11 should be filled with an appropriate <br />patching material. <br />Dist Target <br />Dist Target <br />Dist Target <br />EA <br />EA <br />EA <br />Status <br />Status <br />Status <br />PROPOSED <br />PROPOSED <br />PROPOSED <br />Work By <br />Action <br />Est CostRec Date LOCAL AGENCY <br />Appr Slab-Overlay or <br />02/10/2025 <br />Str Target ROUTINE <br />Treat the approach slab with methacrylate. <br />Dist Target <br />EA Status PROPOSED <br />Work By <br />Action <br />Est Cost Rec Date LOCAL AGENCY <br />Bearings-Reset <br />10/05/2004 <br />Str Target ROUTINE <br />Adjust the wedges under the girder bearings in the north control room. This problem was noted during FC inspection dated 10/05/2004 <br />and could not be verified during routine inspection. <br />Dist Target <br />EA Status PROPOSED <br />DECK WORK RECOMMENDATIONS <br />Work By <br />Action <br />Est Cost Rec Date LOCAL AGENCY <br />Deck-Methacrylate <br />02/10/2025 <br />Str Target ROUTINE <br />Treat the bridge deck/slab with methacrylate in all spans. <br />Dist Target <br />EA Status PROPOSED <br />WORK RECOMMENDATIONS <br />MECHANICAL/ELECTRICAL WORK RECOMMENDATIONS <br />Work By <br />Work By <br />Work By <br />Work By <br />Work By <br />Work By <br />Action <br />Action <br />Action <br />Action <br />Action <br />Action <br />Est Cost <br />Est Cost <br />Est Cost <br />Est Cost <br />Est Cost <br />Est Cost <br />Rec Date <br />Rec Date <br />Rec Date <br />Rec Date <br />Rec Date <br />Rec Date <br />LOCAL AGENCY <br />LOCAL AGENCY <br />LOCAL AGENCY <br />LOCAL AGENCY <br />LOCAL AGENCY <br />LOCAL AGENCY <br />Mech/Elect-Replace <br />Mech/Elect-Repair/Ad <br />Mech/Elect-Replace <br />Mech/Elect-Replace <br />Mech/Elect-Repair/Ad <br />Electrical-Maint <br />05/08/2023 <br />05/08/2023 <br />05/08/2023 <br />05/08/2023 <br />05/08/2023 <br />06/01/2021 <br />Str Target <br />Str Target <br />Str Target <br />Str Target <br />Str Target <br />Str Target <br />ROUTINE <br />ROUTINE <br />PRIORITY <br />PRIORITY <br />ROUTINE <br />ROUTINE <br />Replace all of the burned out traffic gate and bridge house lights. Replcae the bridge house light covers. <br />Lubricate all of the dry and corroded drive systems on the bridge. Replace the centerlock reducer fill cap and replace all gear reducer <br />gear oil. <br />Replace the counterweight pit sump pumps. <br />Replair or replace all of the damaged traffic gates. <br />Shim up the center lock receiver plates to reduce the gap between the receiver and lock bars. Lubricate the lock bars and receivers. <br />Repair any broken grease lines. <br />The bridge see little to no operation during the year. The bridge should be operated periodically to keep all of the machinery properly <br />lubricated. The live load seats are starting to rust to the together. Grease the mating surfaces. The South East main trunnion bearing <br />was squeaking a lot during the first lift, likely due to infrequent operation and improper lubrication. <br />Dist Target <br />Dist Target <br />Dist Target <br />Dist Target <br />Dist Target <br />Dist Target <br />EA <br />EA <br />EA <br />EA <br />EA <br />EA <br />Status <br />Status <br />Status <br />Status <br />Status <br />Status <br />PROPOSED <br />PROPOSED <br />PROPOSED <br />PROPOSED <br />PROPOSED <br />PROPOSED