My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
29C0108_AABF_2025-APR
PublicWorks
>
ArcGIS Online
>
Bridges
>
29C-108
>
29C0108_AABF_2025-APR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2025 8:49:56 AM
Creation date
6/5/2025 8:49:47 AM
Metadata
Fields
Template:
Supporting Docs - Bridge
Bridge #
29C-108
Type - Bridge Supporting Doc
Inspection
Name
Middle River - Bacon Island Road
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Printed on:Wednesday 05/28/2025 06:29 AM 29C0108/AABF/149448Pageof10 <br />Department of Transportation - Division of Maintenance Structure Maintenance & Investigations <br />11 <br />613 <br />614 <br />615 <br />616 <br />617 <br />Traffic Control Sys - Mechanical <br />Traffic Control Sys - Electrical <br />Operation <br />Movable Bridge House - Mech <br />Movable Bridge House - Elect <br />House Electrical Defect <br />Movable Bridge House - Struc <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />3 <br />3 <br />2 <br />1 <br />1 <br />1 <br />1 <br />ea. <br />ea. <br />ea. <br />ea. <br />ea. <br />ea. <br />ea. <br /> 3 <br /> 1 <br /> 0 <br /> 1 <br /> 0 <br /> 0 <br /> 1 <br /> 0 <br /> 1 <br /> 1 <br /> 0 <br /> 1 <br /> 1 <br /> 0 <br /> 0 <br /> 0 <br /> 0 <br /> 0 <br /> 0 <br /> 0 <br /> 0 <br /> 0 <br /> 1 <br /> 1 <br /> 0 <br /> 0 <br /> 0 <br /> 0 <br />MECHANICAL/ELECTRICAL ELEMENT INSPECTION RATINGS AND NOTES <br />9000 <br />9013 <br />MECHANICAL/ELECTRICAL <br />(612) Power System - Electrical <br />(613) Traffic Control Sys - Mechanical <br />(614) Traffic Control Sys - Electrical <br />(614-9000) Operation <br />(615) Movable Bridge House - Mech <br />(616) Movable Bridge House - Elect <br />(616-9013) House Electrical Defect <br />(617) Movable Bridge House - Struc <br />Element DescriptionElem <br />No. <br />Env Total <br />Qty <br />Units <br />CS 1 CS 2 CS 3 CS 4 <br />Qty in each Condition StateDefect/ <br />Prot Defect <br />Non-Routine Inspection Element Notes: <br />Non-Routine Inspection Element Notes: <br />Non-Routine Inspection Element Notes: <br />Non-Routine Inspection Element Notes: <br />Non-Routine Inspection Element Notes: <br />Non-Routine Inspection Element Notes: <br />Non-Routine Inspection Element Notes: <br />power is provided by a county owned generator located off-site. The power supply is 480 Volts AC. The motor control center <br />housing the power system is inside the bridge control house. <br />Double traffic gates are located in Span 22 on the east side of the swing span and in Span 17 on the west side. Each gate has three <br />flashing red lights mounted along the length of the gate arm. <br />Double traffic gates are located in Span 22 on the east side of the swing span and in Span 17 on the west side. Each gate has three <br />flashing red lights mounted along the length of the gate arm. <br />There are two signal lights mount on steel poles on both sides of the roadway In Spans 17 and 22. <br />There are flashing pre-warner lights mounted on warning signs for northbound and southbound traffic on east side of the bridge. <br />Warning bells are also mounted on these signs. <br />Mech/Elect (06/01/2021) The bell for northbound traffic was not operating.(5/8/23) Condition still present. <br />(5/8/23) On the West Traffic Gate, one light is burned out. Replace light bulb with in-kind type. <br />The reinforced concrete (RC) bridge house is located on the north side of Span 22. The building is supported on 4 RC columns. <br />The reinforced concrete (RC) bridge house is located on the north side of Span 22. The building is supported on 4 RC columns. <br />(5/8/23) The outside entrance light to the control house is burned out. Replace bulb with LED type. <br />There is no light cover in the storage room inside the control house. Add cover to the ceiling light. <br />The reinforced concrete (RC) bridge house is located on the north side of Span 22. The building is supported on 4 RC columns. the <br />bridge house was in good condition and no defects were noted.
The URL can be used to link to this page
Your browser does not support the video tag.