rtment of Transportation - Division of Maintenance <br />Structure Maintenance & I <br />DECK WORK RECOMMENDATIONS <br />Rec Date 02/10/2025 Work By LOCAL AGENCY Est Cost <br />Status PROPOSED Action Deck-Methacrylate Str Target ROUTINE <br />Treat the bridge deck/slab with methacrylate in all spans. <br />JOINT/APPR/RAIL WORK RECOMMENDATIONS <br />Dist Target <br />EA <br />Rec Date 02/10/2025 Work By LOCAL AGENCY Est Cost <br />Dist Target <br />Status PROPOSED Action Appr Slab -Overlay or Str Target ROUTINE <br />EA <br />Treat the approach slab with methacrylate. <br />SUPERSTRUCTURE WORK RECOMMENDATIONS <br />Rec Date 10/05/2004 Work By LOCAL AGENCY Est Cost <br />Dist Target <br />Status PROPOSED Action Bearings -Reset Str Target ROUTINE <br />EA <br />Adjust the wedges under the girder bearings in the north control room. This problem was noted during FC inspection dated 10/05/2004 <br />and could not be verified during routine inspection. <br />SUBSTRUCTURE WORK RECOMMENDATIONS <br />Rec Date 11 /16/2015 Work By LOCAL AGENCY Est Cost <br />Dist Target <br />Status PROPOSED Action Sub-Nav Protect Str Target ROUTINE <br />EA <br />Replace the missing timber skirt at Pier 11. One timber was missing. <br />Rec Date 11 /03/2010 Work By LOCAL AGENCY Est Cost <br />Dist Target <br />Status PROPOSED Action Sub -Remove Debris Str Target ROUTINE <br />EA <br />Remove the logs and other debris from the upstream side of Span 10 and adjacent supports. <br />Rec Date 11/03/2010 Work By LOCAL AGENCY Est Cost <br />Dist Target <br />Status PROPOSED Action Sub -Patch spalls Str Target ROUTINE <br />EA <br />The voids in the area of unconsolidated concrete on the Span 10 side of Pier 11 should be filled with an appropriate <br />patching material. <br />MECHANICAL/ELECTRICAL WORK RECOMMENDATIONS <br />Rec Date 05/12/2025 Work By LOCAL AGENCY Est Cost <br />Dist Target <br />Status PROPOSED Action Mech/Elect-Replace Str Target ROUTINE <br />EA <br />Two of the lights next to the North machinery room are burned out. Replace bulbs. <br />One of the lights next to the South machinery room is burned out. Replace bulbs. <br />Rec Date 05/12/2025 Work By LOCAL AGENCY Est Cost <br />Dist Target <br />Status PROPOSED Action Mech/Elect-Repair/Ad Str Target ROUTINE <br />EA <br />A flexible conduit is being pulled out by the movable south bascule when the bridge is fully opened. It is located at the south trunnion <br />and is beginning to cause issues. Relocate the flexible conduit or install mounts to prevent interference with <br />the trunnion. <br />Rec Date 05/12/2025 Work By LOCAL AGENCY Est Cost <br />Dist Target <br />Status PROPOSED Action Mech/Elect-Replace Str Target ROUTINE <br />EA <br />There are several burnt out pilot lights on the control desk. Replace bulbs. <br />Rec Date 05/12/2025 Work By LOCAL AGENCY Est Cost <br />Dist Target <br />Status PROPOSED Action Mech/Elect-Replace Str Target PRIORITY <br />EA <br />The electrical service cabinet is rusty and is a fire hazard. Replace service cabinet in -kind. <br />Rec Date 05/12/2025 Work By LOCAL AGENCY Est Cost <br />Dist Target <br />Status PROPOSED Action Mech/Elect-Mist Str Target ROUTINE <br />EA <br />Provide a dielectric mat in front of the motor control. <br />Rec Date 05/12/2025 Work By LOCAL AGENCY Est Cost <br />Dist Target <br />Status PROPOSED Action Mech/Elect-Replace Str Target ROUTINE <br />EA <br />The doors of three sections in the motor control center are missing their locking mechanism. Install new door handles and hardware <br />so they are operational and lockable. <br />OTHER WORK RECOMMENDATIONS <br />Printed on: Monday 06/23/2025 03:38 PM Page 11 of 12 29C0022/AABI/153157 <br />