Laserfiche WebLink
rtment of Transportation - Division of Maintenance <br />Structure Maintenance & I <br />MECHANICAUELECTRICAL WORK RECOMMENDATIONS <br />Rec Date 05/12/2025 Work By LOCAL AGENCY Est Cost Dist Target <br />Status PROPOSED Action Mech/Elect-Misc Str Target ROUTINE EA <br />There are no navigation lights in the channel or on the two spans to deliniate the limitis of the navigational waterway. <br />Per CFR-2011-title33-volt-sec118-80 lights are required. <br />Rec Date 05/08/2023 Work By LOCAL AGENCY Est Cost <br />Dist Target <br />Status PROPOSED Action Mech/Elect-Replace Str Target <br />ROUTINE EA <br />Replace all of the burned out bridge house lights. Replcae the bridge house light covers. <br />Rec Date 05/08/2023 Work By LOCAL AGENCY Est Cost <br />Dist Target <br />Status PROPOSED Action Mech/Elect-Repair/Ad Str Target <br />ROUTINE EA <br />Lubricate all of the dry and corroded drive systems on the bridge. Replace the centerlock <br />reducer fill cap and replace all gear reducer <br />gear oil. <br />Rec Date 01/14/2009 Work By LOCAL AGENCY Est Cost <br />Dist Target <br />Status PROPOSED Action Mech/Elect-Repair/Ad Str Target <br />ROUTINE EA <br />The north kW meter on the bridge control console is not working. Check connections as <br />shown on the plans and rewire correctly. <br />Replace meter if needed. <br />Rec Date 01/14/2009 Work By LOCAL AGENCY Est Cost <br />Dist Target <br />Status PROPOSED Action Mech/Elect-Repair/Ad Str Target <br />ROUTINE EA <br />The north and south hold down motors are drawing more than nameplate rated current. <br />Check alignment for possible binding and <br />grease linkages to reduce friction. <br />Printed on: Monday 06/23/2025 03:38 PM Page 12 of 12 29C0022/AABI/153157 <br />