My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PW-ENCUTIL-2502898
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2025
>
PW-ENCUTIL-2502501 thru PW-ENCUTIL-2503000
>
PW-ENCUTIL-2502898
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2025 12:36:59 PM
Creation date
8/4/2025 12:34:57 PM
Metadata
Fields
Template:
Permits_Development
DocName
PW-ENCUTIL-2502898
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2025
Location
W/S Thronton Rd., approx. 0.3 miles S/O W. Walnut Grove Rd.
Type - Permit Process
AT&T needs to perform 2-4' x 4' dig ups to repair damaged conduit along Thornton Rd.
Address
4500 East Fremont St., Stockton,CA
Application
AT&T California
Project #
730079
Type
Utility Encroachment
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
NOTES <br />. DUE TO THE GREAT DISTANCE TO THE NEXT <br />LEGAL CROSSING ESCORT PEDESTRIANS SAFELY <br />THROUGH WORK AREA <br />LEGEND <br />F=zi <br />TYPE III BARRICADE W/SIGN <br />)--C <br />TYPE II BAR RICADE W/O SIGN <br />• <br />CHANNELIZING DEVICE <br />T <br />TRAFFIC CONE WITH CLIP ON <br />T <br />SIGN <br />SIGNALIZED INTERSECTION <br />nOi—n <br />ARROW PANEL (FLASHING ARROW) <br />ASP\NLOER <br />SAFE <br />ZbzM <br />Oyu <br />oe b O'q!f <br />HIGH LEVEL WARNING DEVICE (FIAGTREE) <br />FLAGGER <br />TANS TOW AWAY NO STOPPING_ TO_ ISHOW HOURS) <br />TANSAT TOW AWAY NO STOPPING ANY TIME <br />® WORK ZONE (ACTIVITY AREA) LIMITS <br />DIRECTION OF TRAFFIC (NOT PAVEMENT MARKING) <br />OROADWAY DESIGNATION (A THROUGH D) <br />_ THORNTON 1� <br />I / <br />DIG LI <br />REMOVE AND RESTORE 4'X4' 29 <br />OF DIRT AND REPAIR DAMAGE <br />CON DUP <br />f INSTALL TEMPORARY TANS SIGNS <br />S T O 0 .hiss 28283....... I <br />N THORNTON RD <br />PRBYERS <br />h``��7OINEERINO <br />V77///��V77/// COMPANY <br />tClW'SIDEWRB <br />ASPHALT SHOU LDER <br />X Ii <br />ASPHALTSHOULDER <br />DIRT ' ^URB <br />�o <br />SCALE 11I=501 <br />A0574AF <br />Perms} 'TCP <br />SAN JOAQUIN COUNTY <br />ADDRESS <br />26263 THORNTON RD, <br />THORNTON, CA 95686 <br />G"" uesa <br />" <br />mm°m1 <br />TRAFFIC CONTROLpCHART <br />GENERALTRAFFIC CONTROLNOTES <br />a"�"EER GABAL0ON M1HAE L <br />MAXIMUM CHANNELIZER <br />1- <br />TRAFFICCONTROLPLAN SHALL CONFORM TO THE MOST CURRENT CALIFORNIA MANUAL ON UNIFORMED TRAFFIC <br />MG823) <br />SPEED I MINIMUM TAPER LENGTH <br />SPACING <br />CONTROL DEVICES(CAMUTCD) AND STATE STANDARD PLANS <br />PxorvE (661)Z-16B <br />LIMIT <br />DOWN <br />2, <br />WORKING HOURS ARE MONDAY-FRIDAY FROM 9:00AM-3:00PM. WEEKEND WORK NEED TO BE REQUESTED FOR CITY <br />MERGING <br />I SHIFBNG <br />I SHOULDER <br />TAPER <br />TANGENT <br />STREAM <br />APPROVAL. <br />E mIE <br />sx + <br />25 MPH <br />125' <br />63' <br />42 <br />25' <br />50' <br />50' <br />3. <br />ALL AFFECTED RESIDENTS, BUSINESS, AGENCIES, AND SCHOOLS SHALL BE GIVEN 2 WEEKS NOTICE PRIOR TO THE START OF <br />ADVANCED WARNING SIGN SPACING <br />4 <br />WORK AND THEIR ACCESS SHALL BE MAINTAINED AT ALL TIMES <br />MAI MAIN SAFE PED ACCESS L DRIVEWAY ACCESS, POST TEMPORARY NO PARKING SIGNS 72 HRS PRIOR TO ANY WORK <br />TC PLAN I <br />5 <br />ALL CONFLICTING SIGNS, STRIPING OR PAVEMENT MARKING SHALL BE COVERED OR REMOVED AND REPLACED WHEN <br />DISTANCE BETWEEN SIGNS <br />WORK IS COMPLETED. <br />ROAD TYPE <br />A <br />B <br />C <br />6 <br />TRAFFIC DIRECTION THROUGH A SIGNALIZED INTERSECTION SHALL BE CONDUCTED BY A UNIFORMED POLICE OFFICER OR <br />sH erlxumaex <br />si�u.ozu°sic�2--N.°ax°s <br />sicxroroxr°v xamicn °N <br />COMMUNITY SERVICE OFFICER ONLY SHOULD WORK REQUIRE A SIGNAL OVERRIDE, ARRANGEMENTS SHALL BE MADE <br />5 OF 5 <br />URBAN <br />WITH THE CITY POLICE DEPT AND TRANSPORTATION ENGINEERING DEPT AT LEAST 14 DAYS PRIOR TO START OF WORK <br />25 MPH <br />100, <br />100, <br />100, <br />
The URL can be used to link to this page
Your browser does not support the video tag.