Laserfiche WebLink
and deionized water)to be used in cleaning the equipment If the sample is being collected from an operating vapor <br /> between wells. extraction system,the target vapor manifolds must be set up <br /> With sample ports that can be Isolated without Interrupting <br /> Prior to measurement,the instrument Up is lowered into the system operation Prior to the actual collection of the vapor <br /> well until It touches bottom. Using the previously established sample,source data is recorded:air flow,temperature,and <br /> top-of-casing or top-of-box(i.e.,wellhead vault)point,the pressure,or,well Identification number and depth interval of <br /> probe cord(or halyard)Is marked and a measuring tape screen. <br /> (graduated in hundredths of a foot)is used to determine the <br /> distance between the probe end and the marking on the Typical sampling ports consist of a 114—inch ball valve fitted <br /> cord. This measurement is then recorded on the liquid-level with a 3116-inch hose barb to form a slipstream from the <br /> data sheet as the"Measured Total Depth"of the well. sample source. <br /> When necessary in using the Interface probe to measure The sampling procedure requires one end of the tubing be <br /> liquid levels,the probe is first electrically grounded to either slipped over the sample port hose barb and the other end <br /> the metal stove pipe or another metal object nearby. When over the diaphragm pump inlet hose barb to form an alr-tight <br /> no ground Is available,reproducible measurements can be connection. The sampling pump is then started and the <br /> obtained by clipping the ground lead to the handle of the pump Is purged for one minute with the vapor to be sampled. <br /> interface probe case. <br /> Following purging,the discharge of the pump Is then <br /> The probe tip is then lowered into the well and submerged in connected to the°'redlar"bag using a section of 3/16-inch <br /> the groundwater. An oscillating(beeping)tone indicates the tubing.The pump is restarted and the bag Is opened and <br /> probe is in water. The probe is slowly raised until either the allowed to fill to approximately 3/4 of Its capacity. Caution <br /> oscillating lone ceases or becomes a steady tone. In either should be taken not to overfill the sampling bag. The sample <br /> case,this is the depth-to-water(DTW)indication and the is placed in a non-refrigerated dry cooler with sufficient <br /> DTW measurement is made accordingly. The steady tone packing-to prevent damage during transport Cooling <br /> Indicates floating liquid hydrocarbons(FLH). in this case, samples will cause condensation of moisture within the <br /> the probe is slowly raised until the steady tone ceases. This sample,thereby distorting the laboratory analysis. <br /> Is the depth-to-product(DTP)Indication and the DTP <br /> measurement is made accordingly. For quality control purposes,a duplicate vapor sample <br /> should be collected from each sampling port. This sample is <br /> The process of lowering and raising the probe must be then put on hold at the laboratory pending Initial analysis. To <br /> repeated several times to ensure accurate measurements. ensure quality control and minimize the potential for cross- <br /> The DTW and DTP measurements are recorded on the contamination prior to and during sampling,the diaphragm <br /> liquid-level data sheet. When FLH are indicated by the pump is thoroughly purged for approximately five minutes <br /> probe's response,a product bailer Is lowered partially with nitrogen or clean air(i.e.,compressed clean air). A <br /> through the FLI+water interface to confirm the FLH on the 'blank'sample of the discharged air is captured In a'Tedlar" <br /> water surface and as further Indication of the FLH thickness, bag at the end of the purging procedure and may be <br /> particularly in cases where the FLH layer is quite thin. This analyzed to ensure the purging was effective. <br /> measurement is recorded on the data sheet as"FLH <br /> thickness.* To minimize the potential for cross-contamination between <br /> air samples,the polyethylene tubing,If not sample <br /> In order to avoid cross-contamination of wells during the dedicated,is thoroughly cleaned and rinsed. <br /> liquid-level measurement process,wells are measured in the <br /> order of"clean'to"dirty'(where such Information is Vapor samples are subject to very limited holding times, <br /> available). in addition,all measurement equipment Is typically 48 hours. Thus,care must taken to avoid delays in <br /> cleaned with solution and thoroughly rinsed with deionized submittal of vapor samples to the laboratory. In the event <br /> water before use,between measurements in respective the vapor samples cannot be submitted to the analytical <br /> wells,and at the completion of the day's use. laboratory on the same day they are collected,they are to be <br /> temporarily stored In the dry,non-refrigerated,packed cooler <br /> SOP-1 i until the very first opportunity for submittal well within the <br /> SOIL VAPOR SAMPLING:"TEDLAR"BAG SAMPLING required holding time,taking into account the time needed <br /> TECHNIQUE(REMEDIATION SYSTEM SAMPLING for shipment to and receipt by the laboratory. <br /> Prior to vapor sampling,the vacuum system must reach a SOP-12 <br /> stabilized air Row(cubic feet per minute)for approximately VAPOR SAMPLING:SUMMA CANISTER SAMPLING <br /> 15 minutes. Prior to the actual collection of the vapor TECHNIQUE <br /> sample,the following data is recorded:airflow,temperature, <br /> and pressure at collection ports and gauges. Prior to vapor sampling,the vacuum system must reach a <br /> stabilized air flow(cubic feet per minute)for approximately <br /> The sampling equipment consists of a TedlarTM bag 15 m mutes. Prior to the actual collection of the vapor <br /> (available in 1,3,5,and 10 liter sizes),a diaphragm pump, sample,the following data is recorded:airflow,temperature, <br /> and 3(16-inch-diameter polyethylene tubing(approximately 1 and pressure at collection ports and gauges. <br /> foot long).The TedlarTM bag should be fitted with an integral <br /> valve for filling and sealing the bag after sampling.The The sampling equipment consists of a sterllized,gas-tight. <br /> diaphragm pump inlet and outlet are fitted with 3/16-inch "Summa"stainless steel canister(available in one and six <br /> hose barbs for attaching the sample tubing.Prior to vapor liter volumes),flow meter(If required,obtained and <br /> sampling,the soli vapor source(vapor screen,vapor calibrated by the laboratory)and 1/4-inch-diameter <br /> extraction well or manifold,etc.)must be Isolated for polyethylene tubing approximately 2 feet in length. <br /> sampling.A sample label with the sample number and date <br /> and time of sample collection is prepared and placed on the The sampling ports are brass connections fitted with silicone <br /> TedlarTM bag. septa and threaded into a tapped hole in the system piping. <br />