Laserfiche WebLink
Subsurface Investigation Workplan <br /> Substation,100 Narth Valencia Boulevard,Woodlake,California <br /> Page 4 <br /> SITE-SPECIFIC HEALTH AND SAFETY PLAN <br /> A site-specific Health and Safety Plan(HASP)will be prepared and will be retained onsite <br /> during all field activities. All work will be conducted according to the HASP. The HASP will <br /> contain information on the properties of the hazardous materials known to be onsite. This <br /> information is equivalent to that contained within Material Safety Data Sheets. <br /> RESULTS REPORT <br /> Upon completion of the soil boxings,Apex will prepare a results report documenting the field <br /> activities,and results of the soil and groundwater collected. In addition,the results will be used <br /> to update a site conceptual model that will estimate the remaining contaminant mass remaining. <br /> If it is demonstrated that the residual contaminant mass is no longer a potential health and safety <br /> issue,Apex will recommend the site be granted a"No Further Action Required"status and be <br /> closed. <br /> SCHEDULE <br /> Upon approval of this workplan by the CVRWQCS,permitting will be performed with the <br /> WEED for the proposed direct push soil borings. The proposed drilling activities will <br /> immediately follow permitting activities. <br />