My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PW-ENCUTIL-2602052
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2026
>
PW-ENCUTIL-2602001 thru PW-ENCUTIL-2602500
>
PW-ENCUTIL-2602052
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2026 4:33:25 PM
Creation date
8/26/2026 2:41:27 PM
Metadata
Fields
Template:
Permits_Development
DocName
PW-ENCUTIL-2602052
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2026
Location
thornton rd
Type - Permit Process
install underground (UG) conduit via open-cut trenching across approximately 669 linear feet (ft.). Overhead (OH) work includes the installation of approximately 3,300 ft of OH conductor and the removal of approximately 2,299 ft of OH conductor. The work also includes the removal of 6 existing
poles, the installation of 13 new poles, the removal and installation of anchors, and overhead pole work.
Address
3136 Boeing Stockton, CA 95206
Application
Pacific Gas & Electric
Project #
730052
Type
Utility Encroachment
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The URL can be used to link to this page
Your browser does not support the video tag.