My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2015_PS-1501501 thru PS-1502000_ - PS-1501989
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2015
>
PS-1501501 thru PS-1502000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2015_PS-1501501 thru PS-1502000_ - PS-1501989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 4:38:02 PM
Creation date
12/31/2015 4:57:25 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1501989
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2015\PS-1501501 thru PS-1502000
Year2
2015
Supplemental fields
Applicant
PACIFIC GAS & ELECTRIC - SAN FRAN
Contracts
CrossReference
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
REPAIR PAVING BELLHOLE IN STREET
Owners
Parcel Address
ST RT 99 FRNTG RD(CARPENTER RD TO BOING WAY;
Primary Parcel
Type (2)
PS-1501989
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PS-1501989 November 26,2012 <br /> SPECIAL CONDITIONS FOR <br /> ENCROACHMENT PERMIT <br /> 1. Traffic Control per MUTCD. <br /> 2. Pacific Gas and Electric shall submit as-built information after installation and complete with <br /> actual elevation of buried facilities every 50'. <br /> 3. Maintain traffic controls for all roads. Traffic control delays shall not exceed 15 minutes. <br /> Two-way traffic shall be maintained during non-working hours with excavated areas backfilled or <br /> plated. During working hours, two-way traffic control shall be maintained with one lane open and <br /> appropriate flaggers. <br /> 4. Access to all properties shall be maintained at all times except when work is occurring at the <br /> access point. Minimal delays will be allowed to provide access within the work zone area. <br /> Driveway access shall be fully restored at the end of each workday. Driveways disturbed by the <br /> contractor shall be replaced with in-kind or better materials. <br /> 5. Residents and businesses shall be notified in writing, as approved by the County, 48-hours in <br /> advance of any impacts to their access. <br /> 6. Any areas where parking is to be restricted shall have signs noticing the time period placed at <br /> least 48 hours in advance of the work. <br /> 7. Existing fences shall not be removed without written consent signed by the property owner and <br /> submitted to the County prior to the removal. Fences removed shall be restored with in-kind or <br /> better materials at the edge of the right-of-way. <br /> 8. Work shall not be permitted within the San Joaquin County right-of-way between November 1 and <br /> March 31 without prior authorization from the San Joaquin County Field Engineering Division, <br /> contact them at 209-953-7421. <br /> 9. Final paving for trench repair or road resurfacing shall be per Caltrans' specifications and shall <br /> not occur between November 1 and March 31, without prior authorization from the San Joaquin <br /> County Field Engineering Division, contact them at 209-953-7421. <br /> 10. All pavement markings destroyed or obliterated must be replaced in kind by the permittee. Typical <br /> pavement markings include, but not limited to, lane lines, centerlines, stop and stop ahead <br /> legends, limit lines, raised pavement markers and miscellaneous delineators. <br /> 11. The Permittee is responsible for the preservation of survey monuments located within the area of <br /> work herein permitted. Prior to the start of construction, survey monuments that potentially may <br /> be disturbed shall be located and referenced by a Licensed Land Surveyor, and a Corner Record <br /> filed with the County Surveyor. Any Survey Monuments disturbed during the course of <br /> construction shall be reestablished by a Licensed Land Surveyor and another Corner Record filed <br /> with the County Surveyor. (Land Surveyors' Act Section 8771) <br /> 12. All pipe and pipeline related facilities including, but not limited to, valves, utility boxes and vaults, <br /> and frames and covers shall be maintained by Pacific Gas and Electric. Pacific Gas and Electric <br />
The URL can be used to link to this page
Your browser does not support the video tag.