My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2015_PS-1503001 thru PS-1503500_ - PS-1503069
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2015
>
PS-1503001 thru PS-1503500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2015_PS-1503001 thru PS-1503500_ - PS-1503069
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 4:43:51 PM
Creation date
12/31/2015 6:15:11 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1503069
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2015\PS-1503001 thru PS-1503500
Year2
2015
Supplemental fields
Applicant
PG&E- STOCKTON
Contracts
CrossReference
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
BELL HOLES
Owners
Parcel Address
W/S OF SANGUINETTI LN, BETWEEN FUNSTON AVE & JERSY
Primary Parcel
Type (2)
PS-1503069
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PS1503069 <br /> OCio?>2r 19, 2015 <br /> SPECIAL CONDITIONS FOR <br /> PG&E KEYHOLE PROJECT— SANGUINETTI LN. <br /> ENCROACHMENT PERMIT <br /> 1 Maintain traffic controls for all roads. Traffic control delays shall not exceed 15 minutes. <br /> Two-way traffic shall be maintained during non-working hours with excavated areas backfi <br /> plated. During working hours, two-way traffic control shall be maintained with one lane o Iled or <br /> appropriate flaggers (if necessary). pen and <br /> 2. Access to all properties shall be maintained at all times except when work is occur <br /> access point. Minimal delays will be allowed to provide access within the work zone area. <br /> Driveway access shall be fully restored at the end of each workday. Drivew disturbed <br /> at the <br /> contractor shall be replaced with in-kind or better materials. aYs disturbed by the <br /> 3. Residents and businesses shall be notified in writing, as approved by the Count <br /> advance of any impacts to their access. Y, 48 hours in <br /> 4. Any areas where parking is to be restricted shall have signs noting the restriction <br /> least 48 hours in advance. sin place at <br /> 5. Work shall not be permitted within the San Joaquin County right-of-way between <br /> March 31 without prior authorization from the San Joaquin County Field Engineering Division,1 and <br /> contact them at 209-953-7421. g ivision, <br /> 6. Final paving for trench repair or road resurfacing shall be per Caltrans' specifications <br /> not occur between November 1 and March 31, without prior authorization from the San Joshall <br /> aquin <br /> County Field Engineering Division, contact them at 209-953-7421. aquin <br /> 7. All pavement markings destroyed or obliterated mus <br /> t be in ind by the <br /> pavement markings include, but not limited to, lane lines,rcenterrllidnesk tp ahead <br /> and stop ahea Typical <br /> legends, limit lines, raised pavement markers and miscellaneous delineators. <br /> 8. The Permittee is responsible for the preservation of survey monuments locate <br /> work herein permitted. Prior to the start of construction, survey monuments that Potentially <br /> be disturbed shall be located and referenced ns a Licensed Land d within the area of <br /> filed with the County Surveyor. Any Survey Monuments disturbed duringthecourse ally may <br /> construction shall be reestablished by a Licensed Land Surveyor, and a Corner Record <br /> with the County Surveyor. (Land Surveyors' Act Section 8771 Surveyor and another Corner Record filed <br /> 9. ) <br /> All pipe and pipeline related facilities including, but not limited to, valves, utilityboxes <br /> and frames and covers shall be maintained by PG&E. PG&E shall be responsible for <br /> costs associated with the removal, relocation and/or adjustment of these facilities and vaults, <br /> by the County at PG&E's expense. (Streets and Highways Code Section 1463acilities as determined <br /> any and all <br /> 10. All future maintenance of the pipeline and related facilities within the ) <br /> require a San Joaquin County Encroachment Permit. County right-of-way will <br />
The URL can be used to link to this page
Your browser does not support the video tag.