My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2015_PS-1503001 thru PS-1503500_ - PS-1503069
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2015
>
PS-1503001 thru PS-1503500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2015_PS-1503001 thru PS-1503500_ - PS-1503069
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 4:43:51 PM
Creation date
12/31/2015 6:15:11 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1503069
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2015\PS-1503001 thru PS-1503500
Year2
2015
Supplemental fields
Applicant
PG&E- STOCKTON
Contracts
CrossReference
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
BELL HOLES
Owners
Parcel Address
W/S OF SANGUINETTI LN, BETWEEN FUNSTON AVE & JERSY
Primary Parcel
Type (2)
PS-1503069
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Special Conditions for <br /> ENCROACHMENT PERMIT -2- <br /> 11. Bell Holes shall be maintained in a smooth and even condition to <br /> the satisfaction of the County <br /> throughout the project limits at all times. <br /> 12. All bell holes shall be completely backfilled or shored and plated <br /> the roadway restored to two-way traffic. If plating is to be a Plating loadings shall be prepared by a registered civil erg sneer used, at the end of each workday, and <br /> County. 9 and submitted for p prior stable for traffic <br /> approval by the <br /> 13. The contractor shall use San Joaquin County Standard R-29 w <br /> County right-of-way. Where the existing road structural section ris below standard,en k standard, a minimum <br /> ng bell holes within the <br /> f <br /> section of 3 inches oasphalt concrete over 8 inches of aggregate base <br /> 14. Temporary pavement shall be provided for all bell hole areas wshall be required. <br /> ithin three days of pavement <br /> removal or by Friday of each week, whichever is more restrictive. <br /> 15. Roadway areas subject to pavement cuts shall receive <br /> from the centerline (or lane line) to the edge of the travelled way. If th <br /> both sides of the centerline (or adjacent la a one (1) inch asphalt concrete overlay <br /> bothresusides All pavement conforms shall be ground to pentire a flush e pavement is disturbed on <br /> grind and overlay within 10-working days of permanent trench roadway (or affected lanes) shall be <br /> brought up to the finish grade as directed by the County. sh surface. Contractor shall <br /> paving. Shoulder areas shall be <br /> 16. No paving joints allowed within paved shoulder, contractor sh <br /> paved shoulder. all pave all the way to outer edge of <br /> 17. Contractor shall establish existing roadway and drainagerad <br /> Any repair to roadway <br /> g es within the construction area. <br /> s <br /> changes shall receive prior approval from County. <br /> g s <br /> and adjacent areas shall match existing rade . Any proposed grade <br /> 18. School buses shall be passed through the work zone with mi <br /> 19. County roads shall be kept clean from mud and debris; a minimal delays. <br /> work zone areas during entire project. All standard roadway stripin an <br /> be <br /> visible, maintained and restored throughout the at times along the access points and <br /> construction zone during and nafte thellprojectarly <br /> 20. In addition to standard dust control measures, streets ;shall b <br /> free of dirt, mud and debris during construction activities. The contractor <br /> all rovide <br /> needed, street sweeping using a modern mechanical ar vacuum-assisted st eepsweepeaily, or as <br /> r. <br /> 21. The contractor shall not conduct construction operations in rain or heavy fog conditions. <br />
The URL can be used to link to this page
Your browser does not support the video tag.