My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2009_EP-09-2501 thru EP-09-2700_ - EP-09-2550
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2009
>
EP-09-2501 thru EP-09-2700
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2009_EP-09-2501 thru EP-09-2700_ - EP-09-2550
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:05:30 AM
Creation date
1/11/2016 4:03:54 PM
Metadata
Fields
Template:
Permits_Development
DocName
EP-09-2550
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2009\EP-09-2501 thru EP-09-2700
Year2
2009
Supplemental fields
Card Printed
False
Copy To
CrossRef
DocCategory
PublicWorks
DocNum
FileName
GEOLOGICAL TECHNICS INC
OrigTo
Project
BORE
Remarks
Reported
False
RptSupress
False
Summary
Title
N/S OF DURHAM FERRY RD E/O HWY 33
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Cealo ical7"ecknics Inc, <br /> 1172 Kansas Avenue <br /> Modesto,California 95351 <br /> (209)522-4119/Fax(209)522-4227 <br /> www.atienv.com - <br /> 1.0 INTRODUCTION <br /> In preparation for the implementation of the Geoprobe Site Investigation work plan, traffic <br /> control measures have been developed. Access to drilling locations will require closure of a <br /> portion of the west bound lane of Durham Ferry Road, east of South Ahern Road (Hwy 33) and <br /> west of South Koster Road. Traffic control measures will be necessary in order to ensure the <br /> safety of vehicular traffic travelling within the work zone, as well as for the safety,of the workers <br /> and other personnel on site. <br /> Figure 1 includes a vicinity map of the project site. <br /> 2.0 TRAFFIC CONTROL <br /> Personnel and Site Conditions <br /> • All workers will wear brightly colored vests (orange and/or fluorescent yellow). <br /> • All workers will undergo a safety meeting addressing traffic safety issues. <br /> • Pedestrians will be kept 25 feet from the work area. <br /> 1 Lane 2 Way Traffic Control <br /> Traffic control has been proposed in accordance with California Department of Transportation <br /> Manual on Uniform Traffic Control Devices for Streets and Highways(MUTCD). <br /> Traffic will be controlled by a flagger at each end of the work space with the easternmost flagger <br /> being designated as the coordinator. Each flagger will be given a red flag. The red flag will be <br /> given to the driver of the last vehicle proceeding into the one lane section. The driver will be <br /> instructed to give the red flag to the flagger at the other end so the opposite flagger will know <br /> that it is safe to allow traffic to move in the other direction. <br /> Signs,Barricades and Traffic Cones-Durham Ferry Road West Bound Lane Closure <br /> (Figure 2) <br /> • For traffic traveling north on South Ahern Road (Hwy 33), a ROAD WORK AHEAD (W20- <br /> 1) sign will be displayed 495 feet before the intersection of S. Ahern Road and Durham Ferry <br /> George's Service Station <br /> Traffic Control WP 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.