My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2009_EP-09-2701 thru EP-09-2900_ - EP-09-2742
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2009
>
EP-09-2701 thru EP-09-2900
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2009_EP-09-2701 thru EP-09-2900_ - EP-09-2742
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:06:15 AM
Creation date
1/11/2016 4:06:43 PM
Metadata
Fields
Template:
Permits_Development
DocName
EP-09-2742
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2009\EP-09-2701 thru EP-09-2900
Year2
2009
Supplemental fields
Card Printed
False
Copy To
CrossRef
DocCategory
PublicWorks
DocNum
FileName
CALIFORNIA WATER SERVICE
OrigTo
Project
TRENCHING
Remarks
Reported
False
RptSupress
False
Summary
Title
BRISTOL AVE FROM DELAWARE AVE TO MARINE AVE
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SPECIAL CONDITIONS FOR <br /> BRISTOL AVENUE <br /> ENCROACHMENT PERMIT <br /> 1. Maintain traffic controls for all roads. Traffic control delays shall not exceed 15 minutes. <br /> Two-way traffic shall be maintained during non-working hours with excavated areas backfilled or <br /> plated. During working hours, two-way traffic control shall be maintained with one lane open and <br /> appropriate flaggers. The contractor shall submit traffic control plans for all signing, detours, and <br /> any lane closure impacting County right-of-way. <br /> 2. Access to all properties shall be maintained at all times except when work is occurring at the <br /> access point. Minimal delays will be allowed to provide access within the work zone area. <br /> Driveway access shall be fully restored at the end of each workday. Driveways disturbed by the <br /> contractor shall be replaced with in-kind or better materials. <br /> 3. Residents and businesses shall be notified in writing 48-hours in advance of any impacts to their <br /> access. <br /> 4. Any areas where parking is to be restricted shall have signs noticing the time period placed at <br /> least 48 hours in advance of the work. <br /> 5. No trench cutting of County roads shall occur between November 1 and March 31 without prior <br /> authorization by the County. <br /> 6. Final paving for trench repair or road resurfacing shall be per Caltrans' specifications. <br /> 7. All future maintenance of the pipeline and related facilities within the County right-of-way will <br /> require a San Joaquin County Encroachment Permit. <br /> 8. Length of open, unbackfilled trench shall be limited to a total maximum length of 250 linear feet <br /> during working hours. <br /> 9. Trenches shall be maintained in a smooth and even condition to the satisfaction of the County <br /> throughout the project limits at all times. <br /> 10. All trenches shall be completely backfilled or shored and plated at the end of each workday, and <br /> the roadway restored to two-way traffic. If plating is to be used, a trench shoring and plating plan <br /> suitable for traffic loadings shall be prepared by a registered civil engineer and submitted for prior <br /> approval by the County. <br /> 11. The contractor shall use San Joaquin County Standard R-29 when backfilling trenches within the <br /> County right-of-way. Where the existing road structural section is below standard, a minimum <br /> section of 3 inches of asphalt concrete over 8 inches of aggregate base shall be required. <br /> 12. Temporary pavement shall be provided for all trench areas within three days of pavement <br /> removal or by Friday of each week, whichever is more restrictive. <br /> 13. Final trench paving shall be placed when the length of temporarily surfaced trench exceeds 1,500 <br /> linear feet or by segment of road as determined by the County. Final trench paving will also be <br /> required to be placed when interruptions or delays of the work exceed two (2) weeks. <br />
The URL can be used to link to this page
Your browser does not support the video tag.