Laserfiche WebLink
Special Conditions for -2- <br /> ENCROACHMENT PERMIT <br /> 14. Roadway areas subject to pavement cuts shall receive a 0.12-foot asphalt concrete overlay from <br /> the centerline (or lane line) to the edge of the traveled way. If the pavement is disturbed on both <br /> sides of the centerline (or adjacent lane), then the entire roadway (or affected lanes) shall be <br /> resurfaced. All pavement conforms shall be ground to provide a flush surface. Contractor shall <br /> grind and overlay within 10 working days of permanent trench paving. Shoulder areas shall be <br /> brought up to the finish grade as directed by the County. <br /> 15. School buses shall be passed through the work zone with minimal delay. Children walking to <br /> school shall be escorted through the work zone. <br /> 16. If any concrete pavement is removed or damaged, then the concrete pavement shall be removed <br /> to existing joints and shall be replaced in kind. Concrete pavement mix design shall be approved <br /> by County prior to placement. <br />