My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2001_EP-01-73_2002 - Aug.
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2001
>
EP-01-73
>
2002
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2001_EP-01-73_2002 - Aug.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:14:56 AM
Creation date
1/23/2016 3:40:33 AM
Metadata
Fields
Template:
Permits_Development
DocName
Aug.
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2001\EP-01-73
Year2
2002
Supplemental fields
APN
Applicant
City
Cross Ref
DocCategory
Permits
Type (2)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DELTA GAs GATHERING, INC. <br /> 2981 Gold Canal Drive Rancho Cordova, CA 95670 Ph(996)859-4700 Fax (916)859-4747 <br /> August 19, 2002 <br /> Mr. Ben E. Neely <br /> San Joaquin County-Department of Public Works <br /> 1810 E. Hazelton Avenue <br /> Stockton, California 95201 <br /> Re: Encroachment Permit—EP 01-73-SW <br /> Compaction Tests- Roberts/Muller/Maybeck Roads <br /> Conestrama Project <br /> Dear Ben: <br /> Enclosed please find a copy of the Kelinfelder-Field Density Tests-Pipe Backfill results <br /> taken on various locations along the Delta Gas Gathering pipeline route under the above <br /> referenced Encroachment Permit. The field tests were conducted in early May 2002 by a <br /> Kleinfelder technician and the material tested in the laboratory employing accepted <br /> engineering and testing procedures. <br /> As shown on the Summary of Field Density Test Results, all samples tested were well <br /> above the Specified Relative Compaction of 90% for the project. <br /> Also included is an index map of the general pipeline route specifying the location of the <br /> compaction tests. As discussed earlier with you in the project, all compaction test <br /> locations and field-testing were coordinated with Kleinfelder/Stockton to assure proper <br /> compliance with County requirements. <br /> The delay in forwarding the compaction test results were my attempt to submit the report, <br /> along with completed "As-Built"alignment sheets for the project. Quartaroli & . <br /> Associates is now in the final stage of completing corrections to the "As-Built'sheets, <br /> and plan to submit those to the County in the coming weeks. <br /> Appreciate your patience and efforts in working with Delta Gas Gathering on the various <br /> pipeline projects presented for consideration during 2001 and 2002. <br /> Sincerely, <br /> Terrence C. Plumb <br /> Enclosure <br />
The URL can be used to link to this page
Your browser does not support the video tag.