My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2001_EP-01-73_2002 - Aug.
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2001
>
EP-01-73
>
2002
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2001_EP-01-73_2002 - Aug.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:14:56 AM
Creation date
1/23/2016 3:40:33 AM
Metadata
Fields
Template:
Permits_Development
DocName
Aug.
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2001\EP-01-73
Year2
2002
Supplemental fields
APN
Applicant
City
Cross Ref
DocCategory
Permits
Type (2)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
J'J :f T, 4 ,NU <br /> An employee owned company <br /> File No. 20-4619-O1.G01 <br /> June 6, 2002 <br /> Mr. Terrance Plumb <br /> Delta Gas Gathering,Inc. <br /> 2981 Gold Canal Drive <br /> Rancho Cordova, CA 95670 <br /> Subject: FIELD DENSITY TESTS <br /> PIPE BACKFILL <br /> ROBERTS,MUELLER,AND MAYBECK ROADS <br /> STOCKTON, CALIFORNIA <br /> Dear Mr. Plumb: <br /> This report presents the results of compaction tests taken at the subject project. As requested, a <br /> representative of our firm performed field density testing at the site on May 8, 2002. Six tests <br /> were taken by the nuclear probe test method on pipe backfill. A sample of the material tested was <br /> brought to our laboratory for determination of the maximum density-optimum moisture content. <br /> The test results, summarized on the attached table, conform to the compaction requirements of <br /> the project specifications. <br /> We have employed accepted engineering and testing procedures. However, we do not undertake <br /> the guarantee of construction, nor do we relieve the contractor of his primary responsibility to <br /> produce a completed project conforming to the project plans and specifications. <br /> If you have any questions about this report, please call our office. <br /> Respectfully submitted, <br /> KLEI E DER, IN <br /> Ron Heinen, G.E. <br /> Senior Principal <br /> REL:Ir <br /> Attachment <br /> ST02RO33 ©2002 Kleinfelder.Inc. <br /> , 1.Nf FLJ::F 1 i.as;.v�.r!c S[ree;, �tc��4[cxti, C.i, ���2�� i7 1 A ;2i, 1 9 4,<; '.. ,3 2f,19 948-06,21: !a;: <br />
The URL can be used to link to this page
Your browser does not support the video tag.