Laserfiche WebLink
10/12/2006 15:49 209-848-0161 MOZINGO CONSTRUCTION PAGE 04/10 <br /> APN;229-170-07 <br /> FRANC15CO <br /> I APN:229-1 70-07 <br /> FRANC15C0 <br /> I <br /> LATGUL T' <br /> APN: 229-170-39 W <br /> S5JID a <br /> W APN; 229-170-48 <br /> I 55JID <br /> APN: 229-170-92 <br /> GRIFFIN I 40, R W APN: 229-170.90 <br /> GRIFFIN <br /> .PLAN VIEW � <br /> 1" 20' 0 <br /> x <br /> W <br /> z CSL <br /> 0 <br /> EP <br /> 141) EP, <br /> I � <br /> �'CLEARANCE IN. <br /> 130 <br /> PROPJSED I <br /> -EL <br /> EVATI N VIEW 40'x (2) 46" (GLASS 4) RGRCP <br /> -SCALE COMMENTS: <br /> 1, REMOVE ASPHALT, <br /> H:1"=20' 2. DIG DOWN AND REMOVE OLD PIPELINE. <br /> V;1 =10' 3. MAKE BED FOR R.G.R,C.P. <br /> 4. BACKFILL IN 6" LIFTS, USE VIBRATORY ROLLER <br /> COMPACTOR TO ACHIEVE +989 COMPACTION. <br /> 5. COORDINATE FINAL FILL (ASPHALT) WITH S.J. Co. <br /> ROAD DEPT, <br /> VICINITY MAP =M, THIS PLAT 19 INSERTED FOR LOCATION PURPOSES ONLY AND NO RESPONSIBILf1Y IS ASSUMED HEREUNDER. <br /> SOUTH SAN JOAQUIN IRRIGATION DISTRICT <br /> zo SEIDNER ROAD CROSSING <br /> REPLACMENT-LATERAL "BSEC17ON4PD. <br /> p. DWG NO. <br /> PW5EI)W R k2005—pipingV2.dwg <br /> PW <br /> ROJ ECT <br /> LOCATION DRAWN BY; RAY HELLSTROM DATE: MARCH 2006 <br />